IN THE HIGH COURT OF NEW ZEALAND WELLINGTON REGISTRY
CIV 2012-485-597 [2012] NZHC 2445
BETWEEN STEPHEN WILLIAM PLATT Plaintiff
ANDPORIRUA CITY COUNCIL First Defendant
ANDKEITH LATIMER Second Defendant
ANDKEITH LATIMER AND CHRISTINE ELIZABETH LATIMER
Third Defendants
ANDBERNARD VINES Fourth Defendant
Hearing: 5 September 2012
Counsel: M C Josephson with S J Baldwin for Plaintiff
P A Robertson for First Defendant
A V Williamson for Second and Third Defendants
J C Corry for Fourth Defendant
Judgment: 20 September 2012
JUDGMENT OF THE HON JUSTICE KÓS
[1] To what extent must a plaintiff in a leaky home case particularise his claim?
[2] Because of the ten-year longstop limitation period,1a modest tsunami of leaky home or building claim filings has occurred recently in the High Court. Many statements of claim are relatively rudimentary in detailing alleged building defects and the alleged responsibility therefor. Oftentimes that is because the owners are not
really sure. They know the house leaks. Some of the manifest causes and
1 Building Act 2004, s 393.
PLATT v PORIRUA CITY COUNCIL HC WN CIV 2012-485-597 [20 September 2012]
consequences of the leaks may be visible. Some others may come to light only after non-destructive testing. A better picture may be obtained when the plaintiff’s expert has prepared a report. In the very real tsunami of leaky building problems New Zealand has suffered since the late 1990s,2 the second wave consequent litigation, and the subsequent channelling of that litigation by limitation considerations, building experts are not easy to obtain. Some plaintiffs are waiting many months to
obtain expert reports. Even then, without fully destructive testing (which occurs on demolition of defective work and its reconstruction), the exact causes, and their extent, may not be fully apparent. All of this presents particular difficulties in particularising a claim.
Background
[3] The plaintiff in this case pleads that he purchased a residential property in Paremata, a seaside suburb north of Wellington, from its original developers in 2003. The statement of claim then pleads:
The dwelling was built with building defects, including, but not limited to, those set out in schedule 1.
[4] The schedule is a one and a half page document. It identifies defects in relation to the roof, elevations, window and cladding junctions, ground clearances and ground slope. It will suffice for present purposes to set out the three defects claimed in relation to the roof:
1. Inadequate protection of timber framed parapets to roofs exacerbated by lack of adequate falls in places;
2. Inadequate clearance of parapet cladding to roof membranes and roof flashings;
3. Poor detailing of profiled metal roofs including but not limited to:
(a) Lack of turn downs to roofs cladding on small lower roofs on northern and southern elevations;
2 See G McLay “Legal Doctrine, The Leaky Home Crisis, and the Limits of Judicial Lawmaking” in Alexander et al The Leaky Buildings Crisis (Thomson Reuters, Wellington, 2011) at 3–7. As Professor McLay notes, depressingly similar issues had arisen in British Columbia, Canada, earlier in the 1990s.
Keep reading for free
Create a free CaseChat account to read Platt v Porirua City Council and more:
- Read every judgment in full
- Ask AI and get answers linked to paragraphs
- See how each paragraph was cited in later cases
- Download judgments as PDF or Word
One click creates your free account or signs you in.
By continuing you agree to the Terms and Privacy Policy.
- Case
- [2012] NZHC 2445
- Decision Date