Grainger v Orion New Zealand Limited

Link copied
Case Copied 20 min read

IN THE HIGH COURT OF NEW ZEALAND CHRISTCHURCH REGISTRY

I TE KŌTI MATUA O AOTEAROA ŌTAUTAHI ROHE

CIV-2023-409-42

[2024] NZHC 389

BETWEEN

ROSS ARTHUR GRAINGER and VIRGINA KATE LANGMUIR

First Plaintiffs

SHANE CUNNINGHAM COAKLEY and JOANNE ELIZABETH BLAKE

Second Plaintiffs

CHRISTOPHER JOHN ROYDS, as trustee of the MP FAMILY TRUST

Third Plaintiff

IAN HARTLEY DUFF and GLENYS GRACE DUFF

Fourth Plaintiffs

EARLY VALLEY FARM LIMITED
Fifth Plaintiff

continued….

Hearing: 19 February 2024

Appearances:

F W Rose for Plaintiffs

T C Weston KC and R J H Scott for First Defendant

Judgment:

29 February 2024


JUDGMENT OF ASSOCIATE JUDGE LESTER


GRAINGER v ORION NEW ZEALAND LIMITED [2024] NZHC 389 [29 February 2024]

ANDANN LOUISE VAN ASCH, DANIEL GERRIT VAN ASCH and PAUL HENRY

DRURY VAN ASCH, as trustees of the ESTATE OF GD VAN ASCH
Sixth Plaintiffs

AND  CORYSTON FARM LIMITED

Seventh Plaintiff

ANDPETER CHRISTOPHER EASTGATE and ROBYN MARGARET JAMIESON, as

trustees of the ESTATE OF HELEN MARY GRAHAM

Eighth Plaintiffs

AND  IAN TERENCE FORRESTER

Ninth Plaintiff [Discontinued]

AND  LANSDOWNE VALLEY LIMITED

Tenth Plaintiff

AND  MCVICAR HOLDINGS LIMITED

Eleventh Plaintiff [Discontinued]

AND  AF SCOTT FORESTRY LIMITED

Twelfth Plaintiff (struck out)

AND  ORION NEW ZEALAND LIMITED

First Defendant

ANDLEISURE INVESTMENTS NZ LIMITED PARTNERSHIP

Second Defendant

[1]        The first defendant applies for further particulars and to strike out part of the third amended statement of claim.1

[2]        The plaintiffs allege that Orion  New  Zealand  Limited  (Orion)  in  February 2017 caused a fire on Early Valley Road in the Port Hills of Christchurch, that caused extensive damage. The plaintiffs allege the fire started near Pole reference number AX 728 in Early Valley Road on 13 February 2017. The plaintiffs claim two


1      At the time the application was filed, it concerned the second amended statement of claim. In response, plaintiffs prepared a proposed third amended statement of claim which while not yet filed, counsel agreed would be the subject of the present application. I refer to that draft pleading as the third amended statement of claim.

conductors, that is two power lines, came into contact (clashed) creating an overcurrent event. The fuse located at Pole AX 728 (an explosion drop out (EDO) fuse) operated as a result of the overcurrent event causing (the plaintiffs say) molten metal articles to be ejected. Orion disputes this occurred.

[3]        An EDO fuse is designed to operate when there is an overcurrent event. Power lines coming into contact can cause an overcurrent event.

[4]        That the fuse failed at Pole AX 728 does not necessarily mean the overcurrent event occurred at that Pole. The overcurrent event could have happened anywhere downstream of Pole AX 728 for a length of three kilometres which involves some  29 spans on the main line. Accordingly, the clash of power lines could have happened at any one of those 29 spans downstream of Pole AX 728.

[5]        The plaintiffs position is that although they cannot say at which of those spans the power lines clashed, this does not need to be…

CaseChat AU logo

Keep reading for free

Create a free CaseChat account to read Grainger v Orion New Zealand Limited and more:

  • Read every judgment in full
  • Ask AI and get answers linked to paragraphs
  • See how each paragraph was cited in later cases
  • Download judgments as PDF or Word
Continue with Google

One click creates your free account or signs you in.

By continuing you agree to the Terms and Privacy Policy.

Details
Case
[2024] NZHC 389
Decision Date

CaseChat Overview and Summary

In Grainger v Orion New Zealand Limited, the plaintiffs, who were property owners in the Port Hills area of Christchurch, alleged that a fire that occurred in February 2017 was caused by an overcurrent event in Orion New Zealand Limited's power network. The plaintiffs sought to hold Orion liable under the Forest and Rural Fires Act 1977 and for negligence. Orion applied for further particulars and to strike out certain allegations in the plaintiffs' third amended statement of claim. Associate Judge Lester allowed the application for further particulars and granted the strike-out application. The court held that the plaintiffs needed to provide more detailed particulars about the cause of the fire and the alleged breach of duty of care. The court also found that the plaintiffs had breached legal privilege by using a brief of evidence from a previous proceeding, and therefore, the offending paragraphs were struck out. The court ordered Orion to be paid costs on a 2B basis plus disbursements, with an opportunity for Orion to seek costs on another basis if it chose to do so within a specified timeframe.