HIGH COURT OF AUSTRALIA
GLEESON CJ,
GAUDRON, GUMMOW, HAYNE AND CALLINAN JJZDENKO JOSIP SLIVAK & ANOR APPELLANTS
AND
LURGI (AUSTRALIA) PTY LTD & ANOR RESPONDENTS
Slivak v Lurgi (Australia) Pty Ltd
[2001] HCA 6
15 February 2001
A18/2000ORDER
Appeal dismissed with costs.
On appeal from the Supreme Court of South Australia
Representation:
C J Kourakis QC with A L Tokley for the appellants (instructed by Moran & Partners)
R C White QC with A V Possingham for the first respondent (instructed by Kelly & Co)
No appearance for the second respondent
Notice: This copy of the Court's Reasons for Judgment is subject to formal revision prior to publication in the Commonwealth Law Reports.
GLEESON CJ, GUMMOW AND HAYNE JJ. This is an appeal from a decision of the Full Court of the Supreme Court of South Australia (Doyle CJ, Bleby and Martin JJ), dismissing an appeal from a decision of Prior J. At both levels, the first appellant ("Mr Slivak") and second appellant ("Mrs Slivak") were unsuccessful. Mr Slivak pleaded negligence and breach of statutory duty against the respondents in respect of injuries received in an industrial accident in 1993. Mrs Slivak claimed damages under s 33 of the Wrongs Act 1936 (SA) for loss of consortium[1]. If successful, the appellants seek to have the appeal to the Full Court allowed, to have judgment entered for them and to have the matter referred to the trial judge for the assessment of damages.
[1]Section 33 gives to the wife an action for loss of consortium. At common law, the action lay only at the suit of the husband: Wright v Cedzich (1930) 43 CLR 493. The action is independent of any cause of action by the injured spouse against the defendant: Curran v Young (1965) 112 CLR 99.
The facts
On 20 February 1993, Mr Slivak was injured when he fell from a fume extraction system upon the construction of which he was working. The system was designed by the first respondent, Lurgi (Australia) Pty Ltd ("Lurgi"), and was being installed for the Broken Hill Proprietary Company Limited ("BHP"), pursuant to a contract between Lurgi and BHP. Under that contract, Lurgi accepted responsibility for the entire project, including a general responsibility to BHP for the safety of the works and for safe working conditions. It also provided that Lurgi could, with BHP's approval, subcontract any part of the contract works. The contract works involved the construction of a fume extraction and dust disposal facility and the relevant part was the design and erection of a substantial tower through which air would be drawn and, in the process, filtered.
At the time of the accident, Mr Slivak was employed by Lucon (Australia) Pty Ltd ("Lucon"). There was no evidence given at trial as to the exact relationship between Lucon and Lurgi, and the case was fought at trial on the footing that Lurgi had entered into a contract with Lucon for the performance by Lucon of part of…
Keep reading for free
Create a free CaseChat account to read Slivak v Lurgi (Australia) Pty Ltd and more:
- Read every judgment in full
- Ask AI and get answers linked to paragraphs
- See how each paragraph was cited in later cases
- Download judgments as PDF or Word
One click creates your free account or signs you in.
By continuing you agree to the Terms and Privacy Policy.
Find similar cases
Other decisions on the same topics. Each opens in a new tab.
Details
- Case
- [2001] HCA 6
- Decision Date
CaseChat Overview and Summary
The central legal issue before the High Court was whether Lurgi, as the designer of the fume extraction system, had breached its statutory duty under s 24(2a)(a) of the *Occupational Health, Safety and Welfare Act 1986* (SA). This provision requires a designer to ensure, so far as is reasonably practicable, that a structure is designed in a way that persons are safe from injury and risks to health. The appellants argued that Lurgi's design was defective because it did not incorporate elements to mitigate risks arising from the negligent erection of the structure by the contractor.
The High Court reasoned that the ordinary meaning of s 24(2a)(a) applied to a structure being built in accordance with the design. The court found that the evidence unequivocally demonstrated that the structure would not have collapsed if it had been erected according to Lurgi's design and within the specified tolerances. Therefore, the design itself was not inherently unsafe. The court held that the statutory duty imposed on a designer under s 24(2a)(a) relates to matters within the designer's power to control, such as the intended use and loads of the structure, and the nature of its location, rather than the procedures adopted during construction, which are outside the designer's direct management. The court agreed with the lower courts that Lurgi had not breached its duty under s 24(2a)(a).
The appeal was dismissed with costs.
Orders
Orders of the court
Appeal dismissed with costs.
Background
Background to the litigation
Decision
Reasons for decision
Ratio Decidendi
Legal principle established
Established by: GLEESON CJ, GUMMOW AND HAYNE JJ, GAUDRON J, CALLINAN J