QUEENSLAND CIVIL AND
ADMINISTRATIVE TRIBUNAL
CITATION:
Zhang v Todd [2019] QCAT 208
PARTIES:
KATHERINE (QIYUN) ZHANG
(applicant)v SIMON JAMES TODD
(respondent)
APPLICATION NO:
BDL039-18
MATTER TYPE:
Building matters
DELIVERED ON:
6 August 2019
HEARING DATE:
On the papers
HEARD AT:
Brisbane
DECISION OF:
Senior Member Brown
ORDERS:
1. Simon James Todd must pay Katherine (Qiyun) Zhang FOUR THOUSAND AND EIGHTY-TWO DOLLARS ($4,082.00) by 4:00pm on 3 September 2019.
2. Simon James Todd must pay Katherine (Qiyun) Zhang’s costs fixed in the amount of THREE HUNDRED AND TWENTY-SIX DOLLARS AND EIGHTY CENTS ($326.80) by 4:00pm on 3 September 2019.
CATCHWORDS:
CONTRACTS – BUILDING, ENGINEERING AND RELATED CONTRACTS – THE CONTRACT – LEGALITY - where domestic building contract does not comply with Schedule 1B of The Queensland Building and Construction Commission Act 1991 (Qld) – whether a breach of contract can be established
TORTS – NEGLIGENCE – ESSENTIALS OF ACTION FOR NEGLIGENCE – DUTY OF CARE – SPECIAL RELATIONSHIPS AND DUTIES – OTHERS – where homeowner vulnerable – whether builder owed duty of care to homeowner – damages payable where work is defective
Queensland Building and Construction Commission Act 1991 (Qld) s 77, sch 1B s 13(2), s 13(5) , Part 3, sch 2
Queensland Civil and Administrative Tribunal Act 2009 (Qld), s 28(3)(c), s 48
Basscorp Pty Ltd v Kosik [2007] CCT B411-05
Bellgrove v Eldridge (1954) 90 CLR 613Chad Roberts Constructions Pty Ltd v Johnson Tiles Pty Ltd [1993] ABT BC9302692;
Cook's Construction P/L v SFS 007.298.633 P/L (formerly trading as Stork Food Systems Australasia P/L) [2009] QCA 75
Overseas Tankship (UK) Ltd v Morts Dock & Engineering Co Ltd (The Wagon Mound) [1961] AC 388
Perre v Apand (1999) 198 CLR 180
Robinson v Harman (1848) 1 Ex 850; 154 ER 363
Sablewell Pty Ltd V Kirstborough Pty Ltd and Ors QBT BC9505897
Woolcock Street Investments Pty Ltd v CDG Pty Ltd (2004) 216 CLR 515REPRESENTATION:
Applicant:
Self-represented
Respondent:
No appearance
APPEARANCES:
This matter was heard and determined on the papers pursuant to s 32 of the Queensland Civil and Administrative Tribunal Act 2009 (Qld).
REASONS FOR DECISION
Ms Zhang entered into an agreement with Mr Todd for the performance of building work at her residential property (‘the building work’). The building work consisted of the construction of a colorbond fence, the installation of an automatic sliding gate, the removal of an existing driveway, the construction of a new concrete driveway and related site work.
On 31 May 2017 Mr Todd provided to Ms Zhang a quote in respect of the building work. The total cost of the building work was $4,850. Ms Zhang accepted the quote. Mr Todd subsequently advised Ms Zhang that the cost to complete the building works would be an additional $1,750. Ms Zhang agreed to the total cost of the building work being increased to $6,600.
Mr Todd commence the building work on 20 June 2017. On 29 June 2017 Mr Todd requested a progress payment of $3,000. Despite not being…
Continue reading Zhang v Todd
Sign in free to access the full text
- AGLC
- Zhang v Todd [2019] QCAT 208
- Case
- [2019] QCAT 208
- Decision Date
CaseChat Overview and Summary
The tribunal found that the contract between Zhang and Todd did not comply with the requirements of Schedule 1B of the Queensland Building and Construction Commission Act 1991 (Qld). Despite this non-compliance, the tribunal ruled that it did not preclude the establishment of a breach of contract. It was determined that Zhang had suffered losses due to Todd's failure to complete the building works to the required standard. The tribunal also found that Todd owed Zhang a duty of care, given her vulnerability as a homeowner. Consequently, Todd was held liable for damages resulting from the defective work.
In summary, the tribunal ordered Todd to pay Zhang $4,082 by 4:00pm on 3 September 2019. Additionally, Todd was required to pay Zhang's costs, fixed at $326.80, by the same date.
Orders
Orders of the court
1. Simon James Todd must pay Katherine (Qiyun) Zhang FOUR THOUSAND AND EIGHTY-TWO DOLLARS ($4,082.00) by 4:00pm on 3 September 2019.
2. Simon James Todd must pay Katherine (Qiyun) Zhang’s costs fixed in the amount of THREE HUNDRED AND TWENTY-SIX DOLLARS AND EIGHTY CENTS ($326.80) by 4:00pm on 3 September 2019.
Background
Background to the litigation
Full text does not contain this section.
Evidence
Evidence Before The Court
Full text does not contain this section.
Decision
Reasons for decision
Full text does not contain this section.
Ratio Decidendi
Legal Principle Established
Full text does not contain this section.