Tipakalippa v National Offshore Petroleum Safety and Environmental Management Authority (No 2)

Link copied
Case Copied 67 min read

FEDERAL COURT OF AUSTRALIA

Tipakalippa v National Offshore Petroleum Safety and Environmental Management Authority (No 2) [2022] FCA 1121    

File number: VID 306 of 2022
Judgment of: BROMBERG J
Date of judgment: 21 September 2022
Catchwords: ADMINISTRATIVE LAW – Administrative Decisions (Judicial Review) Act 1977 (Cth) – s 39B of the Judiciary Act 1903 (Cth) – judicial review of decision of Regulator to accept an environment plan under the Offshore Petroleum and Greenhouse Gas Storage (Environment) Regulations 2009 (Cth) – where a precondition of the valid acceptance of the environment plan is that the Regulator be reasonably satisfied that the plan meets the criteria specified in the Regulations including the criteria requiring the proponent of the plan to consult with each person whose functions, interests or activities may be affected by the activities to be conducted pursuant to the environment plan (“relevant persons”) – where applicant claims that he and other traditional owners of the Tiwi Islands were relevant persons and not consulted – whether the Regulator was lawfully satisfied that the environment plan met the criteria specified in the Regulations – applicable principles as to reasonable satisfaction as a jurisdictional precondition discussed – whether the Regulator performed the task it was required by the Regulations to perform of considering whether the environment plan demonstrated that each relevant person was consulted as required by the Regulations – whether insufficient information before the Regulator to have enabled the performance of that task – whether in the purported performance of that task the Regulator failed to consider material it was bound to consider – whether non-compliance, as an objective fact, with the consultation criteria in the Regulations could engage s 5(1)(b) of the ADJR Act or constitute a mistake of fact by the Regulator – principles relating to the admissibility of evidence on a judicial review application discussed – Regulator’s decision set aside
Legislation:

Aboriginal Land Rights (Northern Territory) Act 1976 (Cth)

Administrative Decisions (Judicial Review) Act 1977 (Cth)

Environment Protection and Biodiversity Conservation Act 1999 (Cth)

Evidence Act 1995 (Cth)

Fair Work Act 2009 (Cth)

Judiciary Act 1903 (Cth)

Offshore Petroleum and Greenhouse Gas Storage Act 2006 (Cth)

Offshore Petroleum and Greenhouse Gas Storage (Environment) Regulations 2009 (Cth)

Offshore Petroleum and Greenhouse Gas Storage (Environment) Amendment (Consultation and Transparency) Regulations 2019 (Cth)

Cases cited:

Australian Workers’ Union v Registered Organisations Commissioner (No 9) [2019] FCA 1671; 168 ALD 11

BFH16 v Minister for Immigration and Border Protection (2020) 274 FCR 532

BPV17 v Minister for Immigration, Citizenship, Migrant Services and Multicultural Affairs [2022] FCA 157

Deputy Commissioner of Taxation v Richard Walter Pty Ltd (1995) 183 CLR 168

Djokovic v Minister for Immigration, Citizenship, Migrant Services and Multicultural Affairs [2022] FCAFC 3;  (2022) 397 ALR 1

Duggan v Federal Commissioner of Taxation (1972) 129 CLR 365

Ellis v Central Land Council (2019) 267 FCR 339

Goldie v Commonwealth (2002) 117 FCR 566

Graham v Minister for Immigration and Border Protection (2017) 263 CLR 1

Holmes v Deputy Commissioner of…

CaseChat AU logo

Keep reading for free

Create a free CaseChat account to read Tipakalippa v National Offshore Petroleum Safety and Environ... and more:

  • Read every judgment in full
  • Ask AI and get answers linked to paragraphs
  • See how each paragraph was cited in later cases
  • Download judgments as PDF or Word
Continue with Google

One click creates your free account or signs you in.

By continuing you agree to the Terms and Privacy Policy.

Details

Case
[2022] FCA 1121
Decision Date

CaseChat Overview and Summary

Tipakalippa and other traditional owners of the Tiwi Islands sought judicial review of a decision by the National Offshore Petroleum Safety and Environmental Management Authority (NOPSEMA) to accept an environment plan for a drilling and completions campaign under the Offshore Petroleum and Greenhouse Gas Storage (Environment) Regulations 2009. The applicants contended that they were not consulted about the environment plan, contrary to the requirements of the Regulations. The court considered whether NOPSEMA was reasonably satisfied that the environment plan met the criteria specified in the Regulations, including the consultation criteria. The court also examined whether NOPSEMA performed the task it was required to perform of considering whether the environment plan demonstrated that each relevant person was consulted, and whether NOPSEMA failed to consider material it was bound to consider. The court found that NOPSEMA's decision to accept the environment plan was flawed and was set aside. The court held that NOPSEMA had failed to consider relevant material and had not properly considered whether the consultation criteria in the Regulations had been met. The court also held that the admissibility of evidence on a judicial review application depends on the ground of review and the circumstances of the case. The court found that the additional evidence presented by the applicants was not relevant to the legal issues that needed to be determined in the case.

The court set aside the decision of NOPSEMA to accept the environment plan and reserved costs. The order was conditional on the respondent extending an undertaking provided to the court. The court held that the application for leave to amend should be refused as the interests of justice dictated. The court found that the additional evidence presented by the applicants was not relevant to the legal issues that needed to be determined in the case. The court held that the admissibility of evidence on a judicial review application depends on the ground of review and the circumstances of the case. The court held that the meaning of "interests or activities" in reg 11A(1)(d) was not in issue in the case.

Orders

Orders of the court

1. The decision made by the First Respondent on 14 March 2022 pursuant to reg 10(1)(a) of the Offshore Petroleum and Greenhouse Gas Storage (Environment) Regulations 2009 (Cth) to accept the Barossa Development Drilling and Completions Environment Plan (Document No: BAD-200-0003 Revision 3, dated 11 February 2022) is set aside.

2. On the basis that on or before 5 pm on 22 September 2022 the Second Respondent extends to 6 October 2022 the undertaking provided to the Court and referred to at [19] and [20] of the Court’s Reasons for Judgment, order 1 shall not take effect until 6 October 2022.

3. Costs are reserved.

Note: Entry of orders is dealt with in Rule 39.32 of the Federal Court Rules 2011.

TABLE OF CONTENTS

INTRODUCTION

[1]

LEGISLATIVE/REGULATORY FRAMEWORK & APPLICABLE PRINCIPLES

[21]

The ADJR Act, the Judiciary Act and the Relief Claimed

[22]

The Act and the Regulations

[29]

THE KEY EVENTS IN THE ASSESSMENT PROCESS OF THE DRILLING EP

[54]

Reasonable Satisfaction as a Jurisdictional Precondition – Applicable Principles

[65]

The Relevant Regulatory Tasks

[79]

THE DRILLING EP

[90]

Overview of the Drilling EP

[90]

The process for acceptance of the Drilling EP

[108]

CONSIDERATION – GROUND ONE

[125]

The Methodological Flaw

[127]

The Failure to Consider Flaw

[173]

CONSIDERATION – GROUND TWO

[264]

REMAINING ISSUES

[276]

Refusal of Leave to Amend

[277]

Admissibility of Evidence

[281]

The Meaning of “interests or activities” in reg 11A(1)(d)

[289]

CONCLUSION

[290]

Background

Background to the litigation

Evidence

Evidence before the court

In the circumstances the interests of justice dictated that the application for leave to amend should be refused. Admissibility of Evidence At [180]-[185] I have broadly, but not comprehensively, identified what I have called the “additional evidence”, being the evidence adduced by the parties additional to the material that was before the delegate for the purpose of the delegate making the Decision. I have also there stated that the additional evidence was received provisionally and subject to an objection as to its admissibility made by Santos. I have left it to here to explain how I have treated the additional evidence because it is convenient to provide that explanation now that of all of the legal issues raised for determination have been detailed above. I should say at the outset, so that there is no misunderstanding, that there was nothing particularly wrong with the substance of the additional evidence. In fact much of it was given by impressive witnesses including Mr Tipakalippa, Mr Pirrawayingi Puruntatameri, Ms Paulina Jedda Puruntatameri, Ms Carol Maria Puruntatameri, Ms Connie Puruntatameri, Mr James De Santis and Mr Michael Anthony Marren. Their evidence was not relevantly challenged. The only real problem with the additional evidence is that it is not relevant to any legal issue which I have to determine in this proceeding. Overwhelmingly, the additional evidence was only relevant to the issue of whether, as an objective fact, Santos had failed to comply with its obligation under reg 11A(1) to consult each relevant person. For the reasons already given, whether as an objective fact (ie a fact that this Court rather than NOPSEMA has to be satisfied of), Santos failed to consult in accordance with reg 11A(1) is not a matter that arises for determination by this Court by reference to any issue which I have had to determine, including because some issues to which the evidence could have been relevant are unnecessary to determine because the ground in which the issues arise has been dismissed at the threshold. It is useful to note briefly some of the rules of evidence and the applicable principles. Section 55 of the Evidence Act 1995 (Cth) provides that “the evidence that is relevant in a proceeding is evidence that, if it were accepted, could rationally affect (directly or indirectly) the assessment of the probability of the existence of a fact in issue in the proceeding”. Section 56 provides that, “[e]xcept as otherwise provided by the Act, evidence that is relevant in a proceeding is admissible in the proceeding” (subject to other rules which might exclude this evidence on another basis), and “evidence that is not relevant in the proceeding is not admissible”. I sought to explain the principles applicable to the admissibility of evidence on an application for judicial review in Chandra v Webber (2010) 187 FCR 31 at [40] in a passage that was recently cited with approval by the Victorian Court of Appeal (Tate, Kyrou and Kennedy JJA) in Mackenzie v Head, Transport for Victoria and Minister for Planning [2021] VSCA 100 (emphasis added):The admissibility of evidence on an application for judicial review of an administrative decision will depend on the ground of review and the circumstances of the case: McCormack v The Commissioner of Taxation (2001) 114 FCR 574 at [38]-[40] per Sackville J. The touchstone for the determination of admissibility will usually be relevance. That is, is the evidence sought to be adduced relevant to the ground of review sought to be relied upon? Ordinarily there is no reason, in a case involving judicial review, for any evidence to be placed before the court, apart from evidence of what was before the decision-maker at the time of the decision: Australian Retailers Association v Reserve Bank of Australia (2005) 148 FCR 446 at [442] per Weinberg J. However, the admissibility of evidence not before the decision maker depends upon the grounds of review on which the application relies: Attorney-General for the Northern Territory v Minister for Aboriginal Affairs (1989) 23 FCR 536 at 539-540 per Lockhart J; Australian Retailers at [455]; Attorney-General (NT) v Hand (1988) 16 ALD 318 at 319-320 per Wilcox J; and Saint v Holmes (2008) 170 FCR 262 at [54] per Siopis J.

Decision

Reasons for decision

This is an application for judicial review of a decision (Decision) of a delegate of the first respondent, the National Offshore Petroleum Safety and Environmental Management Authority (NOPSEMA). NOPSEMA is an independent statutory authority established under s 645 of the Offshore Petroleum and Greenhouse Gas Storage Act 2006 (Cth). NOPSEMA regulates offshore petroleum activities in Australian waters and its functions relevantly include accepting an environment plan pursuant to reg 10(1)(a) of the Offshore Petroleum and Greenhouse Gas Storage (Environment) Regulations 2009 (Cth). By the Decision purportedly made under reg 10(1)(a), NOPSEMA accepted an environment plan (the Drilling EP) submitted by the second respondent, Santos NA Barossa Pty Ltd, under reg 9 of the Regulations. NOPSEMA may only accept an environment plan it if is “reasonably satisfied” that the plan meets the criteria specified in the Regulations, including that the plan demonstrates that the “titleholder” (in this case Santos) has carried out the consultations required by the Regulations and in particular reg 11A. The legal effect of NOPSEMA’s acceptance of the Drilling EP, assuming it to be valid, was that Santos was permitted to carry out the petroleum activity detailed by the Drilling EP (Activity). Without such an acceptance the carrying out of the Activity would constitute an offence of strict liability under reg 6 of the Regulations. The Activity under the Drilling EP is part of a wider project known as the “Barossa Project”, the focus of which is an offshore gas-condensate field in the Timor Sea known as the “Barossa Field”. Santos intends to exploit that field using a floating production storage and offloading (FPSO) facility, subsea production system, supporting in-field infrastructure and a gas export pipeline connected to an existing Bayu-Undan pipeline in Commonwealth waters. The Barossa Field is the subject of “Petroleum Production Licence NT/L1” held by Santos. As the holder of the Licence, Santos is a “petroleum titleholder”, and therefore a “titleholder”, within the meaning of the Regulations. The Barossa Project initially proposes to exploit an area of the Barossa Field referred to in the Drilling EP as the “Operational Area” located approximately 300 km north of Darwin and 138 km north of the Tiwi Islands. The Barossa Project aims to provide a new source of natural gas for approximately 20 years to Santos’ existing onshore Darwin Liquefied Natural Gas facility at Wickham Point. Under the Drilling EP, Santos proposes to conduct a “drilling and completions campaign”, which entails the drilling and completion of up to eight production wells using a semi‑submersible mobile offshore drilling unit (MODU). The Activity is intended to take place between 2022 and 2025, with the Drilling EP noting that drilling activities were expected to commence in the second quarter of 2022. Each well is expected to take approximately 90 days to drill. The entire drilling campaign is expected to take approximately 18 months subject to weather and operational performance. By way of an overview, the Drilling EP states that the operations or works which are to take place entirely within the Operational Area include the following:·movement of the MODU within the Operational Area (including the entry and exit of the area);·MODU and vessel commissioning and demobilising activities (eg, equipment testing, tank flushing and cleaning, inventory management, etc.);·deployment and recovery of the MODU anchors and mooring lines (including potential for pre-lay anchors);·riserless drilling;·drilling with a conventional closed-circulating fluid system and riserless mud recovery;·installation of casing strings;·drilling using water-based and non-aqueous drilling fluid systems;·installation and operation of a blow-out preventer;·cementing;·well completions, including perforating and well flowback (ie, sampling, clean up, and flaring);·installation of Christmas trees;·contingency activities such as side-track drilling, re-drilling sections, re-spud and abandonment;·well intervention;·ongoing well inspection, maintenance and management; and·general operations associated with the use of a MODU, vessels, helicopters and remotely operated vehicles within the Operational Area.

Ratio Decidendi

Legal principle established

The Barossa Project initially proposes to exploit an area of the Barossa Field referred to in the Drilling EP as the “Operational Area” located approximately 300 km north of Darwin and 138 km north of the Tiwi Islands. The Barossa Project aims to provide a new source of natural gas for approximately 20 years to Santos’ existing onshore Darwin Liquefied Natural Gas facility at Wickham Point. Under the Drilling EP, Santos proposes to conduct a “drilling and completions campaign”, which entails the drilling and completion of up to eight production wells using a semi‑submersible mobile offshore drilling unit (MODU). The Activity is intended to take place between 2022 and 2025, with the Drilling EP noting that drilling activities were expected to commence in the second quarter of 2022. Each well is expected to take approximately 90 days to drill. The entire drilling campaign is expected to take approximately 18 months subject to weather and operational performance. By way of an overview, the Drilling EP states that the operations or works which are to take place entirely within the Operational Area include the following:·movement of the MODU within the Operational Area (including the entry and exit of the area);·MODU and vessel commissioning and demobilising activities (eg, equipment testing, tank flushing and cleaning, inventory management, etc.);·deployment and recovery of the MODU anchors and mooring lines (including potential for pre-lay anchors);·riserless drilling;·drilling with a conventional closed-circulating fluid system and riserless mud recovery;·installation of casing strings;·drilling using water-based and non-aqueous drilling fluid systems;·installation and operation of a blow-out preventer;·cementing;·well completions, including perforating and well flowback (ie, sampling, clean up, and flaring);·installation of Christmas trees;·contingency activities such as side-track drilling, re-drilling sections, re-spud and abandonment;·well intervention;·ongoing well inspection, maintenance and management; and·general operations associated with the use of a MODU, vessels, helicopters and remotely operated vehicles within the Operational Area. It is intended that the drilling and completions campaign will be followed by the installation of project facilities comprising the FPSO facility, subsea production system, supporting in-field infrastructure and the gas export pipeline mentioned earlier. The intention is that the FPSO facility will store and offload condensate to vessels for transportation to market and will also treat and export dry gas through a new pipeline that is proposed to connect into the existing Bayu‑Undan to Darwin pipeline located in Commonwealth waters to the north-west of Darwin. The Tiwi Islands are located in the Timor Sea, approximately 80 km north of Darwin. The Tiwi Islands comprise two main islands, Bathurst Island and Melville Island and several smaller islands. The traditional owners of the Tiwi Islands are comprised of eight clans, one of which is the Munupi clan. The traditional land of the Munupi clan extends to the northern‑most reaches of the Tiwi Islands, located on the north-western peninsula of Melville Island and includes Seagull Island located approximately 4.4 km to the north of the northern‑most point of Melville Island, known as Imalu Point. The traditional land of the Munupi clan is the geographically closest land to the Operational Area.