FEDERAL COURT OF AUSTRALIA
Tipakalippa v National Offshore Petroleum Safety and Environmental Management Authority (No 2) [2022] FCA 1121
File number: VID 306 of 2022 Judgment of: BROMBERG J Date of judgment: 21 September 2022 Catchwords: ADMINISTRATIVE LAW – Administrative Decisions (Judicial Review) Act 1977 (Cth) – s 39B of the Judiciary Act 1903 (Cth) – judicial review of decision of Regulator to accept an environment plan under the Offshore Petroleum and Greenhouse Gas Storage (Environment) Regulations 2009 (Cth) – where a precondition of the valid acceptance of the environment plan is that the Regulator be reasonably satisfied that the plan meets the criteria specified in the Regulations including the criteria requiring the proponent of the plan to consult with each person whose functions, interests or activities may be affected by the activities to be conducted pursuant to the environment plan (“relevant persons”) – where applicant claims that he and other traditional owners of the Tiwi Islands were relevant persons and not consulted – whether the Regulator was lawfully satisfied that the environment plan met the criteria specified in the Regulations – applicable principles as to reasonable satisfaction as a jurisdictional precondition discussed – whether the Regulator performed the task it was required by the Regulations to perform of considering whether the environment plan demonstrated that each relevant person was consulted as required by the Regulations – whether insufficient information before the Regulator to have enabled the performance of that task – whether in the purported performance of that task the Regulator failed to consider material it was bound to consider – whether non-compliance, as an objective fact, with the consultation criteria in the Regulations could engage s 5(1)(b) of the ADJR Act or constitute a mistake of fact by the Regulator – principles relating to the admissibility of evidence on a judicial review application discussed – Regulator’s decision set aside Legislation: Aboriginal Land Rights (Northern Territory) Act 1976 (Cth)
Administrative Decisions (Judicial Review) Act 1977 (Cth)
Environment Protection and Biodiversity Conservation Act 1999 (Cth)
Evidence Act 1995 (Cth)
Fair Work Act 2009 (Cth)
Judiciary Act 1903 (Cth)
Offshore Petroleum and Greenhouse Gas Storage Act 2006 (Cth)
Offshore Petroleum and Greenhouse Gas Storage (Environment) Regulations 2009 (Cth)
Offshore Petroleum and Greenhouse Gas Storage (Environment) Amendment (Consultation and Transparency) Regulations 2019 (Cth)
Cases cited: Australian Workers’ Union v Registered Organisations Commissioner (No 9) [2019] FCA 1671; 168 ALD 11
BFH16 v Minister for Immigration and Border Protection (2020) 274 FCR 532
Deputy Commissioner of Taxation v Richard Walter Pty Ltd (1995) 183 CLR 168
Djokovic v Minister for Immigration, Citizenship, Migrant Services and Multicultural Affairs [2022] FCAFC 3; (2022) 397 ALR 1
Duggan v Federal Commissioner of Taxation (1972) 129 CLR 365
Ellis v Central Land Council (2019) 267 FCR 339
Goldie v Commonwealth (2002) 117 FCR 566
Graham v Minister for Immigration and Border Protection (2017) 263 CLR 1
Holmes v Deputy Commissioner of…
Keep reading for free
Create a free CaseChat account to read Tipakalippa v National Offshore Petroleum Safety and Environ... and more:
- Read every judgment in full
- Ask AI and get answers linked to paragraphs
- See how each paragraph was cited in later cases
- Download judgments as PDF or Word
One click creates your free account or signs you in.
By continuing you agree to the Terms and Privacy Policy.
Details
- Case
- [2022] FCA 1121
- Decision Date
CaseChat Overview and Summary
The court set aside the decision of NOPSEMA to accept the environment plan and reserved costs. The order was conditional on the respondent extending an undertaking provided to the court. The court held that the application for leave to amend should be refused as the interests of justice dictated. The court found that the additional evidence presented by the applicants was not relevant to the legal issues that needed to be determined in the case. The court held that the admissibility of evidence on a judicial review application depends on the ground of review and the circumstances of the case. The court held that the meaning of "interests or activities" in reg 11A(1)(d) was not in issue in the case.
Orders
Orders of the court
1. The decision made by the First Respondent on 14 March 2022 pursuant to reg 10(1)(a) of the Offshore Petroleum and Greenhouse Gas Storage (Environment) Regulations 2009 (Cth) to accept the Barossa Development Drilling and Completions Environment Plan (Document No: BAD-200-0003 Revision 3, dated 11 February 2022) is set aside.
2. On the basis that on or before 5 pm on 22 September 2022 the Second Respondent extends to 6 October 2022 the undertaking provided to the Court and referred to at [19] and [20] of the Court’s Reasons for Judgment, order 1 shall not take effect until 6 October 2022.
3. Costs are reserved.
Note: Entry of orders is dealt with in Rule 39.32 of the Federal Court Rules 2011.
TABLE OF CONTENTS
INTRODUCTION
[1]
LEGISLATIVE/REGULATORY FRAMEWORK & APPLICABLE PRINCIPLES
[21]
The ADJR Act, the Judiciary Act and the Relief Claimed
[22]
The Act and the Regulations
[29]
THE KEY EVENTS IN THE ASSESSMENT PROCESS OF THE DRILLING EP
[54]
Reasonable Satisfaction as a Jurisdictional Precondition – Applicable Principles
[65]
The Relevant Regulatory Tasks
[79]
THE DRILLING EP
[90]
Overview of the Drilling EP
[90]
The process for acceptance of the Drilling EP
[108]
CONSIDERATION – GROUND ONE
[125]
The Methodological Flaw
[127]
The Failure to Consider Flaw
[173]
CONSIDERATION – GROUND TWO
[264]
REMAINING ISSUES
[276]
Refusal of Leave to Amend
[277]
Admissibility of Evidence
[281]
The Meaning of “interests or activities” in reg 11A(1)(d)
[289]
CONCLUSION
[290]
Background
Background to the litigation
Evidence
Evidence before the court
Decision
Reasons for decision
Ratio Decidendi
Legal principle established
The Barossa Project initially proposes to exploit an area of the Barossa Field referred to in the Drilling EP as the “Operational Area” located approximately 300 km north of Darwin and 138 km north of the Tiwi Islands. The Barossa Project aims to provide a new source of natural gas for approximately 20 years to Santos’ existing onshore Darwin Liquefied Natural Gas facility at Wickham Point. Under the Drilling EP, Santos proposes to conduct a “drilling and completions campaign”, which entails the drilling and completion of up to eight production wells using a semi‑submersible mobile offshore drilling unit (MODU). The Activity is intended to take place between 2022 and 2025, with the Drilling EP noting that drilling activities were expected to commence in the second quarter of 2022. Each well is expected to take approximately 90 days to drill. The entire drilling campaign is expected to take approximately 18 months subject to weather and operational performance. By way of an overview, the Drilling EP states that the operations or works which are to take place entirely within the Operational Area include the following:·movement of the MODU within the Operational Area (including the entry and exit of the area);·MODU and vessel commissioning and demobilising activities (eg, equipment testing, tank flushing and cleaning, inventory management, etc.);·deployment and recovery of the MODU anchors and mooring lines (including potential for pre-lay anchors);·riserless drilling;·drilling with a conventional closed-circulating fluid system and riserless mud recovery;·installation of casing strings;·drilling using water-based and non-aqueous drilling fluid systems;·installation and operation of a blow-out preventer;·cementing;·well completions, including perforating and well flowback (ie, sampling, clean up, and flaring);·installation of Christmas trees;·contingency activities such as side-track drilling, re-drilling sections, re-spud and abandonment;·well intervention;·ongoing well inspection, maintenance and management; and·general operations associated with the use of a MODU, vessels, helicopters and remotely operated vehicles within the Operational Area. It is intended that the drilling and completions campaign will be followed by the installation of project facilities comprising the FPSO facility, subsea production system, supporting in-field infrastructure and the gas export pipeline mentioned earlier. The intention is that the FPSO facility will store and offload condensate to vessels for transportation to market and will also treat and export dry gas through a new pipeline that is proposed to connect into the existing Bayu‑Undan to Darwin pipeline located in Commonwealth waters to the north-west of Darwin. The Tiwi Islands are located in the Timor Sea, approximately 80 km north of Darwin. The Tiwi Islands comprise two main islands, Bathurst Island and Melville Island and several smaller islands. The traditional owners of the Tiwi Islands are comprised of eight clans, one of which is the Munupi clan. The traditional land of the Munupi clan extends to the northern‑most reaches of the Tiwi Islands, located on the north-western peninsula of Melville Island and includes Seagull Island located approximately 4.4 km to the north of the northern‑most point of Melville Island, known as Imalu Point. The traditional land of the Munupi clan is the geographically closest land to the Operational Area.