Stephens & Anor v Queensland Building and Construction Commission [2018] QCAT 281
PARTIES:
BILL STEPHENS
(first applicant)
MARIA STEPHENS
(second applicant)v QUEENSLAND BUILDING AND CONSTRUCTION COMMISSION
(respondent)
APPLICATION NO/S:
GAR348-17
MATTER TYPE:
General administrative review matters
DELIVERED ON:
14 August 2018
HEARING DATE:
On the papers
HEARD AT:
Brisbane
DECISION OF:
Member Howe
ORDERS:
The application for administrative review GAR348-17 is dismissed.
CATCHWORDS:
PROFESSIONS AND TRADES – BUILDERS – STATUTORY POWER TO REQUIRE RECTIFICATION OF DEFECTIVE OR INCOMPLETE BUILDING WORK – statutory time limit – where homeowners made complaint about a builder’s work outside the statutory time limit – where the QBCC did not request the Tribunal extend the time limit – whether the Tribunal could review the decision not to seek an extension of time from the Tribunal – whether the Tribunal had power under the QCAT Act to extend the time limit set under the enabling Act – whether a new time limit arose where a builder attended voluntarily to repair – where the QBCC applied to have the application for general administrative review struck out on the grounds that neither the QBCC nor the Tribunal could extend time in the circumstances where there was no request from the QBCC to do so
Queensland Building and Construction Commission Act 1991 (Qld), s 72(2), s 72A(4), s 86(1)(e)
Queensland Civil and Administrative Tribunal Act 2009 (Qld), s 17(1), s 18(1), s 19(c), s 61(1)Bergin v Department of Housing and Public Works [2013] QCATA 190
Doolan v QBCC [2017] QCAT 58
Lowe v Aspley [2010] QCATA 59
McNab Constructions Australia Pty Ltd v QBSA [2012] QCAT 681
Plowman v Palmer (1914) 18 CLR 339
Russell v QBCC [2014] QCAT 094
Sedl v QBSA [2012] QCAT 2
Sendall v Howe & Anor [2012] QCATA 41
Smith v QBSA [2010] QCAT 448
Torea Pty Ltd v QBSA [2013] QCAT 4REPRESENTATION:
First Applicant:
Self-represented
Second Applicant:
Self-represented
Respondent:
Self-represented by E Ward
APPEARANCES:
This matter was heard and determined on the papers pursuant to s 32 of the Queensland Civil and Administrative Tribunal Act 2009 (Qld).
REASONS FOR DECISION
The applicants purchased a house in July 2011. It had been built in or about 2009. Practical completion of construction was on 25 August 2009, according to the applicants.
From about 2012 the applicant owners complained to the builder about water leaks. The builder went back and did some work on this in July 2015 and advised the applicants the leaks were fixed.
On 31 March 2017 there were more leaks and the builder was contacted by the owners. The builder claimed he had no obligation to come back again because he claimed to have fixed the leaks in 2015. He said the new leaks complained about in 2017 was the result of lack of maintenance on the part of the owners.
The owners complained to the Queensland Building and Construction Commission (‘QBCC’) on 18 May 2017 asking that the builder be directed to rectify…
Continue reading Stephens v QBCC
Sign in free to access the full text
- AGLC
- Stephens v QBCC [2018] QCAT 281
- Case
- [2018] QCAT 281
- Decision Date
CaseChat Overview and Summary
The central legal issues in this case revolved around the interpretation of the statutory time limit for issuing a direction to rectify defective building work, the procedural powers of the QBCC and the Tribunal, and the circumstances under which a new time limit might arise. Specifically, the QCAT had to decide whether section 72A(4) of the Building Act 1991, which sets out a prescriptive statutory provision for issuing a direction to rectify, could be extended or changed by the procedural power granted to the Tribunal under section 61(1) of the QCAT Act. Additionally, the court had to assess whether a new time limit arose when the builder voluntarily attended to repair the defects, referencing previous cases such as Sedl and Russell v QBCC.
The QCAT found that section 72A(4) of the Building Act 1991 is a substantive statutory provision that cannot be altered or extended by the procedural powers of the Tribunal. The court emphasised that the QBCC must first determine whether there is sufficient reason to extend the time limit and then apply to the Tribunal for an extension. Until these steps are taken, neither the QBCC nor the Tribunal has the power to issue a direction to rectify. Furthermore, the QCAT clarified that the QBCC's decision on whether to apply to the Tribunal for an extension is not a reviewable decision under section 86. The homeowners' complaint about the failure to issue a direction to rectify could not be reviewed by the Tribunal. Regarding the reset of the time limit, the QCAT held that the circumstances in Sedl were distinguishable, and the comments made in that case did not apply to the present situation. The court concluded that only work done pursuant to a direction to rectify qualified for a renewed time limit, and the voluntary repair work by the builder did not reset the statutory time limit.
In conclusion, the QCAT dismissed the application for general administrative review, affirming that neither the QBCC nor the Tribunal could extend the time limit for issuing a direction to rectify in the absence of a request from the QBCC. The court also found that the voluntary repair work by the builder did not reset the statutory time limit for issuing a direction to rectify defective building work.
Orders
Orders of the court
The application for administrative review GAR348-17 is dismissed.
Background
Background to the litigation
Full text does not contain this section.
Evidence
Evidence Before The Court
Full text does not contain this section.
Decision
Reasons for decision
Ratio Decidendi
Legal Principle Established
Full text does not contain this section.