Peter Whalley Homes Pty Ltd v Queensland Building and Construction Commission

Link copied
Case Copied 43 min read

QUEENSLAND CIVIL AND
ADMINISTRATIVE TRIBUNAL


CITATION:

Peter Whalley Homes Pty Ltd v Queensland Building and Construction Commission [2020] QCAT 454

PARTIES:

PETER WHALLEY HOMES PTY LTD
(applicant)

v

QUEENSLAND BUILDING AND CONSTRUCTION COMMISSION

(respondent)

APPLICATION NO:

GAR112-16

MATTER TYPE:

Building matters

DELIVERED ON:

16 November 2020

HEARING DATE:

25 September 2019

HEARD AT:

Townsville

DECISION OF:

Member Pennell

ORDER:

The decision of the Queensland Building and Construction Commission dated 8 April 2016 to issue Peter Whalley Homes Pty Ltd with a Direction to Rectify No. 42267 to rectify building work said to be defective or incomplete is set aside and substituted with the decision that in the circumstances it would be unfair to give that direction.   

CATCHWORDS:

PROFESSIONS AND TRADES – BUILDERS – STATUTORY POWER TO REQUIRE RECTIFICATION OF DEFECTIVE OR INCOMPLETE BUILDING WORK – where applicant constructed a kit home – complaints of defective building work – investigation by regulator – applicant directed to rectify building work – direction to rectify withdrawn and converted to request to rectify defects – re-inspection of dwelling showed no further action required by regulator – internal review by home owners – direction to rectify reinstated – internal review identified a Category 1 defect in the dwelling – applicant issued with a direction to rectify – whether building work was defective – whether it would be unfair to direct the applicant to rectify building defects     

PRACTICE AND PROCEDURE – EVIDENCE – EXPERT EVIDENCE – joint expert report – where competing opinions and assessments expressed by each expert – competing expert evidence – whether an examination is required of the substance of opinions expressed – primary duty of the Tribunal – Tribunal not bound by the rules of evidence – whether a discretion should be exercised to accept hearsay evidence which unnecessarily disadvantages a party            

Queensland Building and Construction Commission Act (1991 (Qld), s 3(a)(ii), s 3(b), s 72, s 72(5), s 87 and Schedule 2.

Queensland Civil and Administrative Tribunal Act 2009 (Qld), s 18, s 19, s 20, s 20(1), s 20(2), s 21, s 24(1), s 28(2), s 28(3)(a), s 28(3)(b), s 28(3)(c), s 32

Alsco Pty Ltd v VICA Mircevic [2013] VSCA 229
Boland v Yates Property Corporation Pty Ltd (1999) 74 ALJR 209
Drake v Minister for Immigration and Ethnic Affairs (1979) 24 ALR 577
G & A Lanteri Nominees Pty Ltd v Fishers Stores Consolidated Pty Ltd [2007] VSCA 4
Holtman  v Sampson [1985] 2 Qd R 472
Kehl v Board of Professional Engineers of Queensland [2010] QCATA 58
Kioa v West (1985) 159 CLR 550
Makita (Aust) Pty Ltd v Sprowles (2001) 52 NSWLR 705, 743.
McNab Constructions Australia Pty Ltd v Queensland Building Services Authority [2010] QCA 380

Pappas v Queensland Building Services Authority [2002] QDC 290

Q M Properties Pty Ltd v Belscorp Pty Ltd [2019] QCA 138
Queensland Building and Construction Commission v Whalley [2018] QCATA 38
Shi v Migration Agents Registration Authority (2008) 235 CLR 286
Spencer v The Commonwealth (1907) 5 CLR…

CaseChat AU logo

Keep reading for free

Create a free CaseChat account to read Peter Whalley Homes Pty Ltd v Queensland Building and Constr... and more:

  • Read every judgment in full
  • Ask AI and get answers linked to paragraphs
  • See how each paragraph was cited in later cases
  • Download judgments as PDF or Word
Continue with Google

One click creates your free account or signs you in.

By continuing you agree to the Terms and Privacy Policy.

Details
Case
[2020] QCAT 454
Decision Date

CaseChat Overview and Summary

Peter Whalley Homes Pty Ltd, a home builder, challenged a decision by the Queensland Building and Construction Commission (QBCC) to direct them to rectify certain defects in a kit home they had constructed. The QBCC had received complaints from the home owners, which led to an investigation and a subsequent direction for the builder to rectify the defects. The builder contested the decision, arguing that the defects did not exist or were not as severe as alleged, and that issuing a direction to rectify would be unfair. The case was heard by the Queensland Civil and Administrative Tribunal (QCAT), which had the authority to confirm, amend, set aside, or return the QBCC’s decision with directions. The primary issue before the Tribunal was whether the building work was defective to the extent that it would be unfair to direct the builder to rectify it. The Tribunal also needed to determine whether it should accept hearsay evidence that was not bound by the usual rules of evidence.

The Tribunal reviewed the evidence, including the joint expert report, which contained competing opinions and assessments. The primary duty of the Tribunal was to make the correct and preferable decision, not necessarily to be bound by the rules of evidence. The Tribunal considered the substance of the opinions expressed by the experts and exercised its discretion in deciding which evidence to accept. The Tribunal found that the defects identified by the QBCC did not warrant a direction to rectify, as they did not adversely affect the structural performance, health and safety, functional use, or allow water penetration into the building. Furthermore, the alternative solution provided by the builder's engineer was found to comply with the performance provisions of the building code.

The Tribunal set aside the QBCC's decision to issue a Direction to Rectify and substituted it with a decision that, in the circumstances, it would be unfair to give that direction. The Tribunal concluded that the defects identified by the QBCC did not meet the criteria for Category 1 or Category 2 defective building work and that issuing a direction to rectify would be an unfair outcome. The Tribunal also considered the builder's argument that accepting hearsay evidence would disadvantage them and exercised its discretion to accept such evidence where appropriate.

Orders

Orders of the court

The decision of the Queensland Building and Construction Commission dated 8 April 2016 to issue Peter Whalley Homes Pty Ltd with a Direction to Rectify No. 42267 to rectify building work said to be defective or incomplete is set aside and substituted with the decision that in the circumstances it would be unfair to give that direction.

Background

Background to the litigation

In arriving at a conclusion of what is the correct and preferable decision, there is a discretionary authority for the Tribunal to either confirm or amend the QBCC’s decision; or set aside the QBCC’s decision and substitute that decision with its own decision; or set aside the QBCC’s decision and return the matter for consideration to the QBCC with directions the Tribunal considers appropriate.[23] [23]Queensland Civil and Administrative Tribunal Act 2009 (Qld), s 24(1).Background The applicant constructed a kit home for the owners at their property. Because the owners were dissatisfied with some of the workmanship undertaken by the applicant on their house, they complained to the QBCC. Thirteen items were identified in their complaint. The QBCC advised the applicant of the circumstances of the owners’ complaint.[24] The applicant responded and in doing so, addressed each of the thirteen items of complaint. At that stage, the house had not been handed over to the owners as they still owed money to the applicant and other contractors who undertook work on the house.[24]By email on 24/06/2014. At a subsequent time,[25] the QBCC received an additional complaint from the owners relating to an alleged defect to the painting of the internal and external doors of the house. The applicant was advised of the additional complaint.[25]On 11/07/2014. The QBCC undertook an investigation. Mr Kevin Cameron (‘Mr Cameron’), who is the QBCC’s Building Inspector carried out an inspection at the house.[26] At the conclusion of his investigation, Mr Cameron completed an Initial Inspection Report outlining his findings and observations.[27][26]The inspection was carried out on 21/07/2014.[27]QBCC’s SOR-10, pages 94 – 113. Sometime later, the QBCC arrived at a position that the applicant should rectify the identified defects discovered at the owners’ house. Correspondence was sent to the applicant attaching a Direction to Rectify and/or Complete No. 40354 (‘first direction’).[28] The first direction related to the identification of two specific Category 1 defects and a single Category 2 defect.[29] They were – (a) The kitchen server window and a number of the external windows were not externally weather sealed;[30](b) The barge capping located at the rear verandah required flashing;[31] and(c) The rear door jamb was not square which prohibited the installation of a security door.[32] [28]First Direction to Rectify issued 15/08/2014.[29]QBCC’s SOR-11, pages 119 – 123.[30]Items 2 and 3 on the owners’ QBCC complaint form; QBCC’s Initial Inspection Report / Statement of Reasons dated 21/07/2014: QBCC’s SOR-10, pages 96 – 99. [31]Item 4 on the owners’ QBCC complaint form; QBCC’s Initial Inspection Report / Statement of Reasons dated 21/07/2014: QBCC’s SOR-10, page 100.[32]Item 6 on the owners’ QBCC complaint form; QBCC’s Initial Inspection Report / Statement of Reasons dated 21/07/2014: QBCC’s SOR-10, page 103. Following a meeting between the applicant, Mr Cameron and the Building Certifier, Mr Milton Stennett (‘Mr Stennett’), it was determined that the first direction would be withdrawn and replaced with a Request to Rectify. Correspondence was sent to both the applicant and the owners attaching a copy of the Request to Rectify.[33][33]QBCC’s SOR-12 pages 119 – 123.

Evidence

Evidence Before The Court

Decision

Reasons for decision

At a later time, the Tribunal gave directions relating to the completion of a Joint Expert’s Report.[62] That report was later competed by Mr McKenzie and Darren McDonald (‘Mr McDonald’).[63] [62]Tribunal’s Directions dated 08/05/2019.[63]An engineer engaged by the QBCC.QBCC’s Reasons for Decision By way of some additional background information, when providing his reasons for making the decision to issue the notice to the applicant, Mr Ferguson succinctly outlined the legislative framework. That is, defective building work includes work that is faulty or unsatisfactory.[64] For work that involves the use of a manufactured product, that work may be defective if the product has been used, constructed or installed in a way that does not comply with the product manufacturer’s instructions.[64]Queensland Building and Construction Commission Act (1991 (Qld), Schedule 2. Mr Ferguson then went on to differentiate what comprises Category 1 and Category 2 defective building work. Category 1 defective building work means defective building work that is faulty or unsatisfactory because it does one or more of the following – (a) adversely affects the structural performance of a building.(b) adversely affects the health and safety of persons residing in or occupying a building.(c) adversely affects the functional use of a building.(d) allows water penetration into the building. Category 2 defective building work does not include defective building work other than structural defective building work, or Category 1 defective building work or residential construction causing subsidence. However, it does include defective building work that is faulty or unsatisfactory because – (a) it does not meet a reasonable standard of construction or finish expected of a competent holder of a contractor’s licence of the relevant class; or(b) it has caused a settling in period defect in a new building. In undertaking a site inspection, Mr Ferguson found that the wall openings for windows and doors on the house had not been provided with head flashings within the external cladding and on top of the windows and doors. This resulted in the applicant being directed to rectify the defective building works, namely the flashings. The applicant’s engineer then provided an alternative solution indicating the installation method was an alternative provision under the building code and therefore complied with the performance provisions of the building code. In submissions to the QBCC, the applicant’s certifier said – that as the dwelling is in a ‘C3’ wind code the deemed to satisfy provision of the BCA are not appropriate in this instance and the engineers design provided compliance under the performance provisions.[65] [65]QBCC’s SOR-25, page 235. The term BCA is a reference to the Building Code of Australia. Mr Ferguson’s reasons went on to say that it was noted that the engineer’s details were not provided as part of the decision notice and approved plans that the certifier lodged to the local authority.[66] Acknowledged by Mr Ferguson was an earlier decision by Bill Piper (‘Mr Piper’) that the works complied with the building code and therefore the direction had been satisfied. Mr Piper was the Manager of the QBCC’s Service Centre at Townsville. [66]The local authority is the Townsville City Council.

Ratio Decidendi

Legal Principle Established