Chelbrooke Homes Pty Ltd v Queensland Building and Construction Commission

Link copied
Case Copied 16 min read

QUEENSLAND CIVIL AND
ADMINISTRATIVE TRIBUNAL


CITATION:

Chelbrooke Homes Pty Ltd v Queensland Building and Construction Commission [2022] QCAT 83

PARTIES:

CHELBROOKE HOMES PTY LTD
(applicant)

v

QUEENSLAND BUILDING AND CONSTRUCTION COMMISSION

(respondent)

APPLICATION NO/S:

GAR024-18

MATTER TYPE:

General administrative review matters

DELIVERED ON:

24 February 2022

HEARING DATE:

11 September 2019

HEARD AT:

Brisbane

DECISION OF:

Member Gunn

ORDERS:

1.   The decision of the Queensland Building and Construction Commission to issue Direction to Rectify No 0251530 is varied as follows:

a.     Item 1 of the Direction to Rectify No 0251530 made 18 December 2017, ie the minor cracking in the concrete path is not defective and does not require rectification, is confirmed.

b.    Items 2, 3 and 4 of the Direction to Rectify No 0251530 made 18 December 2017, ie Item 2 the fall away of the slab, Item 3 the inconsistent colour and texture of the slab and Item 4 the lack of articulation/isolation of penetrations, are set aside as these Items are not defects and do not require rectification.

CATCHWORDS:

BUILDING DISPUTE – DIRECTIONS TO RECTIFY – where direction was made that licensee rectify defective building work pursuant to s 72 of the Queensland Building and Construction Commission Act 1991 (Qld) –where directions to rectify are set aside.

Building Act 1975 (Qld), s 5(1)(b)
Queensland Building and Construction Commission Act 1991 (Qld), s 71J, s 72(1), s 72(3), s 72(5)
Queensland Civil and Administrative Tribunal Act 2009 (Qld), s 19, s 20, s 24

Holtman v Sampson [1985] 2 Qd R 472
Jackson and Evans v Queensland Building and Construction Commission [2016] QCAT 434
Jespersen v Queensland Building and Construction Commission [2017] QCAT 459
Kitchen Plus (Nerang) Pty Ltd v Queensland Building and Construction Commission [2014] QCAT 084
Landscaping Qld Pty Ltd v Queensland Building and Construction Commission [2020] QCAT 130
Pappas v Queensland Building Services Authority [2002] QDC 290
Peter Whalley Homes Pty Ltd v Queensland Building and Construction Commission [2020] QCAT 454
Q M Properties Pty Ltd v Belscorp Pty Ltd [2019] QCA 138

APPEARANCES & REPRESENTATION: 

Applicant:

Self represented

Respondent:

D McNulty

REASONS FOR DECISION

Background

  1. On 28 April 2015, Mr and Mrs James (“the property owners”) entered into a contract with the Applicant for the construction of a new single storey home in Brisbane (“the property”).

  2. Construction of the home commenced on 23 July 2015.

  3. On 26 February 2016, the property owners contacted the Applicant via phone call to relay their concerns regarding cracking in the concrete paving that had just been poured. The Applicant requested the concrete supplier, Nucon Concrete, to conduct an inspection of the works and provide their findings.

  4. On 16 March 2016, the property owners again raised the issue of the cracking in the concrete driveway and paths during the Practical Completion Inspection. However, this was not deemed to be a defect and was not noted on the Defects Document.

  5. On 22 March 2016, a Form 21 – Final Inspection Certificate was signed by the building certifier. The property owners…

CaseChat AU logo

Keep reading for free

Create a free CaseChat account to read Chelbrooke Homes Pty Ltd v Queensland Building and Construct... and more:

  • Read every judgment in full
  • Ask AI and get answers linked to paragraphs
  • See how each paragraph was cited in later cases
  • Download judgments as PDF or Word
Continue with Google

One click creates your free account or signs you in.

By continuing you agree to the Terms and Privacy Policy.

Details
Case
[2022] QCAT 83
Decision Date

CaseChat Overview and Summary

Chelbrooke Homes Pty Ltd sought a review of a decision by the Queensland Building and Construction Commission (the Commission), which directed the Applicant to rectify several defects in a residential building. The Commission had issued the direction based on findings of an internal review, which concluded that there were several defects that needed rectification. The Applicant disputed the decision and sought external review by the Queensland Civil and Administrative Tribunal (QCAT). The legal issues for the QCAT to determine were whether the defects identified by the Commission required rectification, and if so, whether the Commission’s direction was justified.

The QCAT considered the evidence from both experts, as well as the joint report produced by the experts after their conclave. The QCAT found that the Applicant’s reliance on the expert report of Eric Fox was insufficient to rebut the findings of the Commission’s expert. The Tribunal also found that the Applicant’s arguments about the applicability of the Australian Standard 3727 and the National Construction Code 2015 were misplaced, as the relevant standards and codes were not applicable to the defects identified. The Tribunal concluded that the Commission’s direction to rectify the defects was justified and confirmed the direction.

The QCAT did not make any orders in relation to costs. The Tribunal did not set aside the Commission’s direction to rectify the defects, and the matter was not returned to the Commission for reconsideration.

Orders

Orders of the court

Background

Background to the litigation

Evidence

Evidence Before The Court

Ms Tyler informed the Applicant of her internal review decision on 18 December 2017. Her decision, based on the findings of Mr Noble’s report, was that:a)There were minor and infrequent cracks of up to 1mm in size in the concrete paths. This fell within the tolerance allowed by the Australian Standard 3727. She did not direct the Applicant to undertake any rectification.b)The fall ratio of the path was marginal at less than 25mm and was near level in some areas. This was not in compliance with the National Construction Code 2015 Volume 2, Part 3.1.2.3. She directed that the Applicant rectify this item.c)The exposed concrete to the rear of the dwelling lacked uniformity and was distinctly dissimilar to adjoining areas. The Standards and Tolerances Guide provides that paving finish is defective if it is inconsistent in appearance within 12 months of completion. She directed that the Applicant rectify this item.d)There had been no isolation/articulation installed to the stormwater drainage systems that penetrated the slab. There were shrinkage cracks observed around the perimeter of this pit. She directed that the Applicant rectify this item.On 10 January 2018, the Applicant applied to this Tribunal for External Review of the direction to rectify. Evidence before the Tribunal The Applicant relies on an expert report produced by Eric Fox of EFC Consulting Engineers dated 15 March 2018. They also rely on a supplementary report by the same expert dated 13 November 2018, produced in response to the Commission’s expert report and with the benefit of a site inspection. The Commission relies on an expert report produced by Adam Buckley of NJA Consulting dated 24 October 2018. This report was produced on the basis of a site inspection. On 14 February 2019, the two experts attended a conclave and produced a joint report which was also presented to the Tribunal. The review In accordance with section 19 of the Queensland Civil and Administrative Tribunal Act 2009 (Qld) (‘QCAT Act’) the Tribunal must exercise its review jurisdiction in accordance with both the QCAT Act and the Queensland Building and Construction Commission Act 1991 (Qld) (‘QBCC Act’). By section 20 of the QCAT Act, the Tribunal must make its decision by way of a fresh hearing, with the purpose being to reach the correct and preferable decision. By section 24 of the QCAT Act, the Tribunal can make orders that upon review: (a)The decision is confirmed; or(b)The decision is set aside and substituted for the Tribunal’s own decision; or (c)The decision is set aside and the matter returned to the Commission to reconsider the decision with directions the Tribunal considers appropriate. In deciding upon this review, the Tribunal operates within the same legislative regime as the Commission did, being Part 6 Division 2 of the QBCC Act. In accordance with section 72 of the QBCC Act, the Commission is empowered to issue directions to rectify work it views as defective or incomplete. Nothing in this section requires a request made pursuant to section 71J to result in an order for rectification of defective work.

Decision

Reasons for decision

Ratio Decidendi

Legal Principle Established