FEDERAL COURT OF AUSTRALIA
Linkhill Pty Ltd v Director of Fair Work Building Industry Inspectorate [2013] FCA 389
Citation: Linkhill Pty Ltd v Director of Fair Work Building Industry Inspectorate [2013] FCA 389 Parties: LINKHILL PTY LTD (ACN 006 166 070) v DIRECTOR OF FAIR WORK BUILDING INDUSTRY INSPECTORATE File number: VID 205 of 2013 Judge: MURPHY J Date of judgment: 29 April 2013 Catchwords: PRACTICE AND PROCEDURE – application for leave to appeal from Federal Magistrates Court – seeking a stay of substantive proceeding – leave required under s 24(1A) of the Federal Court of Australia Act 1976 (Cth) – primary judge exercising discretion regarding leave to withdraw admissions – application refused Legislation: Building and Construction Improvement Act 2005 (Cth)
Workplace Relations Act 1996 (Cth)Cases cited: Adam P Brown Male Fashions Pty Ltd v Phillip Morris Inc (1981) 148 CLR 170
AonRisk Services Australia Ltd v Australian National University (2009) 239 CLR 175
Bufalo v Official Trustee in Bankruptcy [2011] FCAFC 111
Celestino v Celestino [1990] FCA 299
Cement Australia Pty Ltd v ACCC (2010) 187 FCR 261
Coopers Brewery Ltd v Panfida Foods Ltd [1992] 26 NSWLR 738
Deangrove Pty Ltd (Receivers and Managers Appointed) v Commonwealth Bank of Australia [2003] FCA 268
Décor Corporation Pty Ltd v Dart Industries Inc (1991) 33 FCR 397
Drabsch v Switzerland General Insurance Co Ltd (unreported, 16 October 1996, Supreme Court of NSW)
Energex Ltd v Alstrom Australia Ltd [2005] FCAFC 215
Finance Sector Union v Commonwealth Bank of Australia [2005] FCA 1847
H Clark (Doncaster) Ltd v Wilkinson [1965] Ch 694
Hanave Pty Ltd v LFOT Pty Ltd [1997] FCA 218
Hogan v Australian Crime Commission (2010)240 CLR 651
House v The King (1936) 55 CLR 499
In re the Will of F.B. Gilbert (dec.) (1946) 46 SR (NSW) 318
Murran Investments Pty Ltd v Aromatic Beauty Products Pty Ltd [2000] FCA 1732
Oswal v Burrup Fertilisers Pty Ltd [2011] FCAFC 117
Pampered Paws Connection Pty Ltd v Pets Paradise Franchising (Qld) Pty Ltd (No 8) [2010] FCA 682
Queensland v JL Holdings Pty Ltd (1997) 189 CLR 146
Rawson Finances Pty Limited v Commissioner of Taxation [2010] FCAFC 139
Re CSR Ltd (2010) 265 ALR 703
Ridolfi v Rigato Farms Pty Ltd [2000] 2 Qd R 455
Rivera v United States of America [2004] FCAFC 154
The Director of Fair Work Building Industry Inspectorate v Linkhill Pty Ltd (No 3) [2013] FMCA 165Date of hearing: 19 April 2013 Place: Melbourne Division: FAIR WORK DIVISION Category: Catchwords Number of paragraphs: 51 Counsel for the Applicant: Mr M McDonald and Ms S Bingham Solicitor for the Applicant: At Work Law Counsel for the Respondent: Mr S Moore Solicitor for the Respondent: Clayton Utz
IN THE FEDERAL COURT OF AUSTRALIA
VICTORIA DISTRICT REGISTRY
FAIR WORK DIVISION
VID 205 of 2013
BETWEEN: LINKHILL PTY LTD (ACN 006 166 070)
ApplicantAND: DIRECTOR OF FAIR WORK BUILDING INDUSTRY INSPECTORATE
Respondent
JUDGE:
MURPHY J
DATE OF ORDER:
29 APRIL 2013
WHERE…
Keep reading for free
Create a free CaseChat account to read Linkhill Pty Ltd v Director of Fair Work Building Industry I... and more:
- Read every judgment in full
- Ask AI and get answers linked to paragraphs
- See how each paragraph was cited in later cases
- Download judgments as PDF or Word
One click creates your free account or signs you in.
By continuing you agree to the Terms and Privacy Policy.
Details
- Case
- [2013] FCA 389
- Decision Date
CaseChat Overview and Summary
The central legal issue was whether Linkhill had met the burden of demonstrating that the Director's refusal to grant leave to appeal was unjust or otherwise an improper exercise of discretion. Additionally, the court had to consider whether the Director had breached any duty of probity and fairness by not making the same concessions in the trial as it had done before the court. Linkhill argued that the Director should have allowed it to withdraw the admissions, which it claimed were necessary for the court to consider the real issues between the parties.
The court found that Linkhill had not met the heavy burden of demonstrating that the Director's refusal to grant leave to appeal was unjust. It observed that the decision under review was made in the course of a trial, and the court is generally reluctant to grant leave to appeal from decisions relating to issues of practice or procedure made during a trial. The court also rejected Linkhill's argument that the Director had failed to act with probity and fairness. The court held that the Director's stance in the trial was understandable, given the late timing of the application and the significant progress made in the trial.
The application for leave to appeal was refused, and Linkhill was ordered to pay the respondent's costs of the application.
Orders
Orders of the court
Background
Background to the litigation
Evidence
Evidence before the court
Decision
Reasons for decision
Ratio Decidendi
Legal principle established
In the present case the burden may also be seen as heavy because the decision under review was made in the course of a trial. As Lander J observed in Pampered Paws Connection Pty Ltd v Pets Paradise Franchising (Qld) Pty Ltd (No 8) [2010] FCA 682 at [22], the Court will be reluctant to grant leave to appeal from a decision relating to issues of practice or procedure made when a trial is running.CONSIDERATION In the judgment below the learned Federal Magistrate dealt with Linkhill’s application primarily by reference to its application to withdraw the admissions in its Amended Defence. Linkhill did not contend that his Honour was in error in taking this approach. It is not in dispute that in Linkhill’s Defence filed in December 2011, and its Amended Defence filed in December 2012, it admitted:(a)in paragraph 2(g) - that at all relevant times it operated a business from its premises at 401 Collins Street, Melbourne, which included, from November 2006, the renovation and refurbishment of a property at 346-348 Flinders Lane, Melbourne (“the Flinders Lane property”) , defined as “the Renovation Works”;(b)in paragraph 3(a) - that the workers were engaged by it to perform, and did perform, the Renovation Works at the Flinders Lane property; and(c)in paragraph 3(b) - that the work performed by the workers was “building work” within the meaning of s 5(1) of the Building and Construction Improvement Act 2005 (Cth) (“BCII Act”). It is not necessary to detail the text of each of the amendments in Linkhill’s proposed Further Amended Defence. For the present it suffices to note that Linkhill accepted that the proposed amendments increased the issues of controversy between the parties and conceded that its application was of “weighty importance”. It submitted:The amendments proposed have the following effects on the respondent’ defence and the issues which the Court should determine, for example:(a)the timeframe in which the “renovation work” at Flinders Lane was undertaken, the extent to which the respondent can be held liable for such breaches, and the consequential quantum if the allegations are proven;(b)the nature of the work performed at Flinders Lane between 2006 and 2010 and whether it falls within the application of the relevant awards and whether that work was engaged in on a full-time basis. This will also have an effect on the quantum extent of the respondents’ liability if the allegations are proven;(c)whether the renovation work performed was for the benefit of Linkhill or Ms Levine;(d)whether the true nature of the engagement of the workers at Flinders Lane was a contract for services due to the use of Linkhill as the entity to supply Ms Levine with the resources that she required to undertake the renovation work. While Linkhill argued that it had flagged a change in its position in Mr Morgan's affidavit of 5 February 2013, it accepted that it had not elucidated the change. It contended that the admissions were not being withdrawn but rather qualified, noting that it still conceded that renovation works occurred at the Flinders Lane property. It noted that the proposed amendments were consistent with its defence that the workers had always been engaged as contractors rather than employees. It sought withdrawal of the admissions on the basis that it was necessary if the court was to look at the real issues between the parties.