QUEENSLAND CIVIL AND
ADMINISTRATIVE TRIBUNAL
CITATION:
Knox v Bellamy [2021] QCAT 192
PARTIES: GRAEME KNOX (applicant)
v
DEREK BELLAMY (respondent)
APPLICATION NO/S:
BDL007-19
MATTER TYPE:
Building matters
DELIVERED ON:
26 May 2021
HEARING DATE:
19 March 2020
HEARD AT:
Brisbane
DECISION OF:
Member Fitzpatrick
ORDERS: It is ordered, on an interim basis, that:
1. A copy of these Orders and Reasons are to be given to the Queensland Building and Construction Commission (QBCC) marked to the attention of the Assistant Commissioner (Services and Trades) by the Principal Registrar of the Tribunal.
2. The Assistant Commissioner (Services and Trades) must appoint a senior plumbing inspector to liaise with Graeme Knox and Derek Bellamy in relation to rectification of the wastewater system at the Knox property at Brookfield (the land).
3. Graeme Knox, Derek Bellamy and the inspector appointed by the QBCC must attend at the land within 21 days of the date of this Order for the purpose of determining the scope of works necessary to rectify and complete the installation of an operational wastewater system on the land.
4. Graeme Knox and Derek Bellamy must co-operate with the QBCC inspector by provision of relevant documents and granting access to any experts engaged by the QBCC.
5. Graeme Knox must obtain engineering evidence as to the fitness for purpose of the current evaporation trenches, if rectified, and the rectification works required. Alternatively, Graeme Knox must obtain engineering evidence as to the location of new trenches, the style of new trenches and the cost of installing those trenches. That evidence must be provided to Derek Bellamy and to the QBCC plumbing inspector as part of the parties’ collaboration in determining the scope of rectification work.
6. Derek Bellamy must attend to rectification of the wastewater tanks, pipework and evaporation trenches necessary to repair and complete installation of the wastewater system on the land, so that it is fully operational.
7. Derek Bellamy must obtain certification of the wastewater system by the Brisbane City Council.
8. In the event of disagreement as to whether rectification work falls within the ambit of the original agreement for installation of a wastewater system on the land, for example, the re-siting of the evaporation trenches and/or the supply of materials; and if the parties cannot resolve the matter themselves, the parties will participate in a dispute resolution process as administered by the QBCC.
9. In the event agreement cannot be reached in relation to the matters set out in Order number 8, Graeme Knox must notify the Tribunal in writing that agreement cannot be reached, whereupon the parties will attend a Directions Hearing on a date and time to be advised, and the matter will be listed for determination by the Tribunal.
10. Graeme Knox must co-operate with Derek Bellamy in the completion of the works and must ensure extra work outside the ambit of the original agreement for the installation of a wastewater system on the land is either contracted to Derek Bellamy or another appropriate…
Continue reading Knox v Bellamy
Sign in free to access the full text
- AGLC
- Knox v Bellamy [2021] QCAT 192
- Case
- [2021] QCAT 192
- Decision Date
CaseChat Overview and Summary
Orders
Orders of the court
Full text does not contain this section.
Background
Background to the litigation
Full text does not contain this section.
Evidence
Evidence Before The Court
Full text does not contain this section.
Decision
Reasons for decision
Full text does not contain this section.
Ratio Decidendi
Legal Principle Established
Full text does not contain this section.