Australian Energy Regulatory v Jemena Eastern Gas Pipeline (1) Pty Ltd

Link copied
Case Copied 67 min read

FEDERAL COURT OF AUSTRALIA

Australian Energy Regulator v Jemena Eastern Gas Pipeline (1) Pty Ltd [2025] FCA 338

File number(s): VID 392 of 2023
Judgment of: ANDERSON J
Date of judgment: 10 April 2025
Catchwords: CONSUMER LAW – application for declarations of contraventions of rr 653(1)(a) and r 659(1) of the National Gas Rules – where respondents admitted contraventions of the Rules – civil penalties sought for contraventions of r 659(1) – where parties provided joint submissions as to agreed penalty amount – whether proposed penalties appropriate considering all relevant factors – orders made in the form proposed by the parties.
Legislation:

Competition and Consumer Act 2010 (Cth)

Federal Court of Australia Act 1976 (Cth)

National Gas Rules

National Gas (South Australia) Act 2008 (SA)

National Gas (Queensland) Act 2008 (Qld)

National Gas (Victoria) Act 2008 (Vic)

National Gas (New South Wales) Act 2008 (NSW)

National Gas (South Australia) Regulations (SA)

Cases cited:

Australian Building and Construction Commissioner v Construction, Forestry, Mining and Energy Union [2017] FCAFC 113; 254 FCR 68

Australian Building and Construction Commissioner v Construction, Forestry, Mining and Energy Union (2018) 262 CLR 157

Australian Building and Construction Commissioner v Pattinson (2022) 274 CLR 450; [2022] HCA 13

Australian Competition and Consumer Commission v BlueScope Steel Ltd (No 6) [2023] FCA 1029

Australian Competition and Consumer Commission v Coles Supermarkets Australia Pty Ltd (2015) 327 ALR 540; [2015] FCA 330

Australian Competition and Consumer Commission v Reckitt Benckiser (Australia) Pty Ltd [2016] FCAFC 181; 340 ALR 25

Australian Competition and Consumer Commission v Uber B.V. [2022] FCA 1466

Australian Energy Regulator v Santos Direct Pty Ltd [2024] FCA 579

Australian Securities and Investments Commission v Firstmac Limited (Penalty Hearing) [2025] FCA 12

Australian Securities and Investments Commission v MLC Nominees Pty Ltd (2020) 147 ACSR 266; [2020] FCA 1306

Australian Securities and Investment Commission v Westpac Banking Corporation (No 3) (2019) 131 ACSR 585; [2018] FCA 170

Australian Securities and Investments Commission v Westpac Banking Corp (Omnibus) (2022) 159 ACSR 381

Commonwealth v Director, Fair Work Building Industry Inspectorate (2015) 258 CLR 482; [2015] HCA 46

Markarian v The Queen (2005) 228 CLR 357; [2005] HCA 25

NW Frozen Foods Pty Ltd v Australian Competition & Consumer Commission (1996) 71 FCR 285; [1996] FCA 1134

SingTel Optus v Australian Competition and Consumer Commission (2012) 287 ALR 249; [2012] FCAFC 20

Trade Practices Commission v CSR Ltd [1991] ATPR 41-076

Volkswagen Aktiengesellschaft v Australian Competition and Consumer Commission (2021) 284 FCR 24; [2021] FCAFC 49

Division: General Division
Registry: Victoria
National Practice Area: Commercial and Corporations
Sub-area: Economic Regulator, Competition and Access
Number of paragraphs: 149
Date of hearing: 3 April 2025
Counsel for the Applicant: Mr S Parmenter KC and Ms A Mobrici
Solicitor for the Applicant: Corrs Chambers Westgarth
Counsel for the Respondents: Dr R Higgins SC and Ms A Elizabeth
Solicitor for the Respondents: Herbert Smith Freehills

ORDERS

VID 392 of 2023
BETWEEN:

AUSTRALIAN…

CaseChat AU logo

Keep reading for free

Create a free CaseChat account to read Australian Energy Regulatory v Jemena Eastern Gas Pipeline (... and more:

  • Read every judgment in full
  • Ask AI and get answers linked to paragraphs
  • See how each paragraph was cited in later cases
  • Download judgments as PDF or Word
Continue with Google

One click creates your free account or signs you in.

By continuing you agree to the Terms and Privacy Policy.

Details
Case
[2025] FCA 338
Decision Date

CaseChat Overview and Summary

The Australian Energy Regulator (AER) filed proceedings against Jemena Eastern Gas Pipeline (1) Pty Ltd (JEGP) for contraventions of the National Gas Rules (NGR). JEGP admitted to 14 categories of errors in the calculation and reporting of auction quantity limits (AQLs) over a period of time. JEGP also admitted to contraventions of rules 653(1)(a) and 659(1) of the NGR. The court was required to decide on the appropriate civil penalties for the admitted contraventions. The AER and JEGP jointly submitted that a penalty of $1,700,269 should be imposed on the first respondent, $2,285,330 on the second respondent, $1,174,347 on the third respondent, and $340,054 on the fourth respondent. The court considered the relevant factors, including the seriousness and recency of the contraventions, the respondents' cooperation with the AER, and their compliance practices and culture. The court found that the proposed penalties were appropriate and ordered the respondents to pay the penalties within 30 days. Additionally, the court ordered the respondents to engage an independent expert to conduct a risk-based compliance review and submit reports to the AER within specified timeframes. The court also ordered the respondents to contribute $300,000 towards the AER's costs.

In summary, the Federal Court found Jemena Eastern Gas Pipeline (1) Pty Ltd in breach of the National Gas Rules and imposed civil penalties on the respondents. The court took into account the respondents' cooperation with the AER, their compliance practices, and the nature of the errors committed. The court ordered the respondents to pay the penalties, engage an independent expert for a compliance review, and contribute towards the AER's costs.

Orders

Orders of the court

9. Pursuant to s 44AAG(2)(a) of the Competition and Consumer Act 2010 (Cth), within 30 days, each Respondent pay a civil penalty of the following amount in respect of that Respondent’s conduct declared to be contraventions of r 649(1) of the NGR:

(a) First Respondent: $1,700,269;

(b) Second Respondent: $2,285,330;

(c) Third Respondent: $1,174,347; and

(d) Fourth Respondent: $340,054.

10. Pursuant to s 43 of the Federal Court of Australia Act 1976 (Cth), within 30 days, the Respondents collectively pay a contribution of $300,000 towards the Australian Energy Regulator’s costs of and incidental to the proceeding.

11. Pursuant to s 44AAG(2)(c) of the Competition and Consumer Act 2010 (Cth):

(a) within 30 days of the making of this order or such other time as agreed between the AER and the Respondents, the Respondents engage an Independent Expert, with the identity of the Independent Expert to be agreed between the AER and the Respondents, or failing agreement, as proposed by each of them and determined by the Court;

(b) within 15 days of the engagement of the Independent Expert, the Respondents instruct the Independent Expert to conduct a risk-based compliance review which addresses the following matters:

(i) identification of the areas where the Respondents are at risk of breaching rr 653(1)(a) and 649(1) of the NGR;

(ii) a qualitative assessment of the likelihood of those risks occurring;

(iii) identification of any gaps in the Respondents’ existing procedures for managing those risks; and

(iv) written recommendations to the Respondents for any actions to be taken having regard to the above assessments in sub-paragraphs (i) to (iii) above;

(c) within twelve months from the date of this order, or such other time as agreed between the AER and the Respondents the Respondents are to provide to the AER:

(i) a written report, signed by the Independent Expert, that:

A. describes the expertise of the Independent Expert and confirms his or her independence;

B. states precisely how each of the steps described in subparagraphs (b)(i) to (b)(iv) above have been completed; and

C. annexes a copy of the Independent Expert’s recommendations to the Respondents;

(ii) a written report signed by the Chief Executive Officer (or equivalent) of the Respondents that:

A. states precisely what steps the Respondents have taken in response to the Independent Expert’s recommendations; and

B. states any of the Independent Expert’s recommendations that were not implemented by the Respondents, and the reasons for doing so.

12. In these orders:

(a) Independent Expert means a third party who is not a Related Body Corporate of the Respondents. The third party carrying out the Independent Review must:

(i) be able to act without bias and without any actual or potential conflicts of interests with reference to following criteria:

A. is not a present or past staff member or director of the Respondents;

B. has not acted and does not act for, and does not consult and has not consulted to, the Respondents or Related Body Corporate in any matters relating to compliance with Part 25 of the NGR or relating to systems controls, processes or training for the calculation or submission of auction quantity limits to the Australian Energy Market Operator (AEMO); and

C. has no shareholding or other interests in the Respondents’ or any of its Related Body Corporates;

(ii) have professional competence to apply established standards and techniques to carry out the compliance review to a high standard; and

(iii) have a system of quality controls to ensure the Independent Expert’s written report is of a professional standard.

(b) Independent Review means the risk-based compliance review described in paragraph 11(b) of this order.

(c) Related Body Corporate has the meaning given in s 50 of the Corporations Act 2001 (Cth).

ANNEXURE A – CATEGORIES OF ERRORS

Category of error and summary of nature of error

Affected pipeline and number of gas days during the respective Relevant Periods on which the AQLs for one or more product components were affected by the error

1. Orbost Receipt Point error

When the Orbost Receipt Point was incorporated in the PypIT system, the Longford service point was added into delivery zone EGP-DZ-01, with the consequence that the Longford service was included in two zones. This resulted in duplicated values being used in the calculations of AQLs for the Eastern Gas Pipeline, with higher maximum daily quantities and scheduled quantities in segments downstream of the zones in which the Longford service point was added (segments FS-02 to FS-07).

Eastern Gas Pipeline: 112 gas days

2. Authorised Overrun System error

An incorrect configuration in the PypIT system resulted in the inclusion of authorised overrun nominations against a gas shipper’s firm daily contractual rights.

Eastern Gas Pipeline: 804 gas days

Queensland Gas Pipeline: 825 gas days

VicHub Pipeline: 92 gas days

2A. Authorised Overrun System error

An incorrect configuration in the PypIT system resulted in the inclusion of authorised overrun nominations against a gas shipper’s firm daily contractual rights.

Gas days Authorised Overrun System error was present in the PypIT system and at least one shipper had contracted the necessary services with the relevant Respondent to participate in the capacity auction.

Eastern Gas Pipeline: 786 gas days

Queensland Gas Pipeline: 259 gas days

VicHub Pipeline: 73 gas days

Gas days Authorised Overrun System error was present in the PypIT system, at least one shipper had contracted the necessary services with the relevant Respondent to participate in the capacity auction, and a gas shipper or shippers nominated authorised overruns.

Eastern Gas Pipeline: 765 gas days

Queensland Gas Pipeline: 259 gas days

VicHub Pipeline: N/A

3. Contract Configuration Data Entry error

As a consequence of incorrect data being entered into, or data being omitted from, the PypIT system when customer contracts were established or varied, inaccurate AQLs were calculated by the PypIT system and submitted to AEMO.

Eastern Gas Pipeline: 948 gas days

Queensland Gas Pipeline: 653 gas days

Darling Downs Pipeline: 214 gas days

VicHub Pipeline: 443 gas days

4. Incorrect Calculation of Backhaul AQLs error

Modifications to the PypIT system on 24 November 2021 introduced an error which caused backhaul AQLs to be calculated incorrectly, resulting in incorrect AQL data being provided to AEMO.

Eastern Gas Pipeline: 1 gas day

Queensland Gas Pipeline: 1 gas day

VicHub Pipeline: 1 gas day

5. Incorrect Zone AQL Calculation error

An error in the PypIT system resulted in a MIN (minimum) function not being applied to the calculation of AQLs for zones, with the consequence that operational capacity constraints were not taken into account when calculating AQLs for zones and incorrect AQL data was provided to AEMO.

Eastern Gas Pipeline: 161 gas days

Darling Downs Pipeline: 161 gas days

6. Incorrect Treatment of Park Services in AQL Calculation error

A park service on the Eastern Gas Pipeline was included in the calculation of AQLs as a consequence of what the EGP has described as an incorrect interpretation of the auction requirements in relation to service types. This resulted in incorrect AQLs being provided to AEMO.

Additionally, PypIT system modifications originally implemented to (incorrectly) give effect to the inclusion of park services on the Eastern Gas Pipeline had the consequence of causing a null value within the calculation of AQLs for the Darling Downs Pipeline, resulting in incorrect AQLs for the Darling Downs Pipeline.

Eastern Gas Pipeline: 111 gas days

Darling Downs Pipeline: 70 gas days

7. Backhaul AQL Misconfiguration error

Backhaul segment calculations in PypIT initially relied on the minimum scheduled quantity in associated forward haul segments, which caused an issue for backhaul segments which had no associated forward haul segment, resulting in (incorrect) zero AQLs being provided to AEMO.

Eastern Gas Pipeline: 4 gas days

Queensland Gas Pipeline: 4 gas days

VicHub Pipeline: 4 gas days

8. Transitional Firm Services Included in MDQ error

An error in the PypIT system incorrectly resulted in the inclusion of MDQ for transitional firm services in the calculation of AQLs, with the consequence that incorrect AQLs were provided to AEMO.

Eastern Gas Pipeline: 18 gas days

9. Incorrect Rounding of Physical Capacity error

The physical quantities in the AQL calculations performed by the PypIT system used capacities stored in terajoules (TJ) to three decimal places, however the variables used to store the capacity were only accurate to zero decimal places, resulting in the capacities being rounded where the base number was not a whole number of TJ. This resulted in inaccurate AQLs being provided to AEMO.

Eastern Gas Pipeline: 4 gas days

Queensland Gas Pipeline: 4 gas days

10. Capacity Constraint Not Respected error

As a consequence of the way the Transportation Services Point Register was defined in the PypIT system, capacity constraints entered against a segment were not correctly taken into account in some circumstances when calculating AQLs. This issue impacted segments which receipted from and delivered to multiple zones and which had a capacity constraint against them.

Eastern Gas Pipeline: up to 15 gas days

11. Inadvertent Application of Pipeline Capacity Assessment Tool Under Development error

A coding error in the PypIT system resulted in incorrect capacity values being applied in the calculation of AQLs provided to AEMO.

Queensland Gas Pipeline: 81 gas days

12. Incorrect Calculation of Pipeline Capacity Coding error

An error in the PypIT system, whereby boundary conditions were not included in the lookup used to determine capacity, resulted in incorrect capacity for the Queensland Gas Pipeline being read into the AQL calculation.

Queensland Gas Pipeline: 826 gas days

13. Incorrect Handling of Segments with Multiple Receipt / Delivery Zones error

Services delivering to QGP-DZ-01 were incorrectly excluded from the QGP-FS-03 calculation, and services receipting from QGP-RS-04 were incorrectly excluded from the QGP-FS-04 calculation. This resulted in incorrect AQLs being calculated and provided to AEMO.

Queensland Gas Pipeline: 536 gas days

14. Backhaul Service Point Record error

For a service point on the QGP (ID 1490035), the PypIT system incorrectly retrieved a nameplate capacity value that should not have been used for AQL calculation purposes, which resulted in incorrect AQLs being provided to AEMO.

For two service points on the VicHub pipeline (IDs 1313214 and 1313216), the PypIT system incorrectly retrieved a nameplate capacity value that should not have been used for AQL calculation purposes, which resulted in incorrect AQLs being provided to AEMO.

Queensland Gas Pipeline: 470 gas days

VicHub Pipeline: 470 gas days

ANNEXURE B – EXTRACTS OF AMENDED STATEMENT OF AGREED FACTS REGARDING LIABILITY (SoAF)

1. (Paragraph 62, SoAF) The applicable time periods for each of the 14 categories of error were as follows:

(a) the Orbost Receipt Point error commenced on 13 August 2020, was identified on 1December 2020, and was rectified on 2 December 2020;

(b) the Authorised Overrun System error commenced on 2 March 2019, was identified on 19 May 2021, manually rectified on 20 May 2021, and permanently rectified on 3 June 2021;

(c) the Contract Configuration Data Entry error commenced on 2 March 2019, and was identified on 15 March 2019, with each individual error requiring manual rectification in PypIT as each error was identified through periodic contract configuration data audits and day-to-day service priority checks;

(d) the Incorrect Calculation of Backhaul AQLs error was identified on 24 November 2021 and rectified on the same day, but impacted services on only the 25 November 2021 gas day;

(e) the Incorrect Zone AQL Calculation error commenced on 8 March 2019, was identified on 29 July 2019, and was rectified on 14 August 2019;

(f) the Incorrect Treatment of Park Services in AQL Calculation error commenced on 7 March 2019, was identified around May 2019, and was rectified by way of updates to the PypIT algorithm on each of 15 May 2019 and 25 June 2019;

(g) the Backhaul AQL Misconfiguration error first impacted the 2 March 2019 gas day, was identified on 1 March 2019, and was rectified on 4 and 5 March 2019 with a further rectification update made on 22 March 2019;

(h) the Transitional Firm Services Included in MDQ error commenced on 2 March 2019, was identified on 18 March 2019, and was rectified on 19 March 2019;

(i) the Incorrect Rounding of Physical Capacity error commenced on 2 March 2019, and was identified on 5 March 2019, after an update to the PypIT algorithm on 4 March 2019 which rectified this error;

(j) the Capacity Constraint Not Respected error commenced on 12 March 2019, was identified on 23 March 2022 and was rectified on 25 November 2021, noting that the system change on this date was not designed to rectify this error;

(k) the Inadvertent Application of Pipeline Capacity Assessment Tool Under Development error commenced on 24 November 2019, was identified on 23 March 2022 and was rectified on the same day;

(l) the Incorrect Calculation of Pipeline Capacity Coding error commenced on 2 March 2019, was identified on 4 June 2021 and was rectified on the same day;

(m) the Incorrect Handling of Segments with Multiple Receipt/Delivery Zones error commenced on 2 March 2019, was identified on 17 August 2020 and rectified on 19 August 2020; and

(n) the Backhaul Service Point Record error commenced on 14 August 2020, was rectified on 25 November 2021 (noting that the system change on this date was not designed to rectify this error), and was identified on 20 April 2022.

2. (Paragraph 67, SoAF) The Respondents’ practices, methods and acts relating to the calculation of the AQLs, and making the record or preparing and submitting the AQLs to AEMO during the Relevant Periods were the following categories of practices, methods and acts:

(a) AQL spot checks: Spot checks were undertaken by the Respondents’ Commercial Operations team (who are responsible for scheduling) approximately quarterly since the commencement of the capacity auction on random gas days to check: (1) AQL calculations for service points, zones and segments; and (2) that firm services were included in AQL calculations. The following spot checks commenced following the identification of the Authorised Overrun System error on 19 May 2021 until the Authorised Overrun System error was permanently rectified on 3 June 2021: (3) that lower tier services were not included in AQL calculations; and (4) that overruns were not included against firm services. The Respondents did not maintain records of the exact dates these spot checks were undertaken.

(b) AQL limit checks: From 17 December 2020, a daily AQL review process was implemented whereby AQLs for zones, segments and service points were emailed to members of the Commercial Operations team as part of the capacity auction process. The purpose of this email was to flag instances where data exceeded certain parameters, namely where any of the following circumstances existed: (1) on the Eastern Gas Pipeline, the calculated AQL was below 30 TJ; (2) the contractual maximum daily quantity for “firm” services (MDQ) exceeded throughput (operational) capacity; or (3) the scheduled quantity exceeded throughput (operational) capacity or MDQ. Where any one or more of these conditions were triggered, a manual check of AQLs was undertaken by the Commercial Operations team to assess the issue and rectify any error that existed in the calculation.

(c) PypIT system audits: An audit was performed for the First Respondent, Second Respondent and Third Respondent (but not the Fourth Respondent) over the period December 2020 to April 2021. The audit involved reviewing contract and service configuration data contained in the PypIT system (entered during the contract setup process) against gas transportation agreements (GTAs) to ensure the information matched. The items cross-checked included, but were not limited to: (1) service start and end dates; (2) MDQs for services; (3) MDQ start and end dates (contracts for some services specify different MDQs which apply during different periods of time); and (4) “GMRG Flag” (explained below) selection. The primary focus of these audits was on ensuring that shipper service configuration in the PypIT system was aligned with GTAs.

(d) Part 25 compliance reviews: The Respondents undertook compliance reviews which considered Part 25 of the NGR in June 2020 and February 2021. The process varied according to each rule, but relevantly, in relation to AQLs, involved developing a model which allowed for sample testing of a selected day of data within the PypIT system. The following areas were considered as part of these reviews: (1) the setup of all receipt and delivery service points, and the zone and segments against AEMO’s Transportation Service Point Register; (2) the consistency of AQL calculations for zones, service points and segments with the Capacity Transfer and Auction Procedures (CTA Procedures); (3) that all firm services were included in AQL calculations; (4) that no lower tier services were included in AQL calculations.

(e) Contract configuration data audit: The Respondents undertook an audit in February 2021 which focussed solely on the configuration data associated with firm services to ensure “GMRG Flags” were correctly applied. GMRG Flags were used in the PypIT system to identify whether a service was a firm service for the purposes of calculating AQLs. The audit involved manual checks of contract data in the PypIT system to ensure that the GMRG Flags were present for firm services.

(f) Internal Audit review of pipelines gas market reform management: In August 2019, as part of the “CY19 SGSPAA Internal Audit Plan”, the Respondents’ Internal Audit team undertook a review of the design and operating effectiveness of key controls relating to new regulatory obligations introduced through the Gas Market Reform process, including the capacity auction. Insofar as it related to the calculation of AQLs, this review included an assessment of the processes and controls relating to the calculation and provision of AQLs to AEMO, as well as some sample testing of AQL data.

(g) Review of contract handover process: A new procedure incorporating a data review step in the Respondents’ contract setup process was established from 21 May 2021. The Respondents’ contract handover process refers to the steps involved in the handover of a new (or amended) GTA or other customer contract from the Commercial team, which is responsible for negotiating and executing agreements with customers, to the Commercial Operations team. This process occurred each time a contract was executed. As part of this process, the Commercial Operations team is responsible for “setting up” (establishing and configuring) each new or amended contract/service in the PypIT system. The Respondents undertook a review of its contract handover process in May 2021 to ensure that process documentation incorporated checks required to improve the accuracy of data entry when setting up GTAs in the PypIT system, particularly in relation to data which was used in the calculation of AQLs. This review resulted in the inclusion of a checklist item relating to the GMRG Flag field (which, as noted above, is used in the PypIT system to determine whether a service should be included in AQL calculations).

(h) Service priority checks supported by dashboard: Since 23 September 2021, the Commercial Operations team has undertaken daily monitoring of key indicators to monitor for potential issues with the calculation of AQLs in relation to service priorities. This is supported by a dashboard on which data is refreshed every 35 minutes, designed to highlight any of the following conditions: (1) firm services not included in AQL calculation (no GMRG Flag on service); (2) a firm service was active in the PypIT system but there were issues with its setup within the system (e.g., firm service start and end dates do not match the GMRG Flag start and end dates); and (3) lower tier services being included in AQL calculations.

3. (Paragraph 68, SoAF) The Respondents’ policies, procedures and training for staff that applied during the Relevant Periods were:

Item

Timeframe in effect and any changes made

Description

GMR ComOps

Manual

Manual in effect from

01/03/2019

Version updated on 17/12/2019 to ensure consistency with Gas Day Harmonisation

This procedural document was created for the Commercial Operations team and introduced around the time the capacity auction commenced.

The manual outlines the capacity auction related rules and requirements (including those of the CTA Procedures) which are applicable to the Commercial Operations team’s work and details the daily and other procedural tasks required as a result of the introduction of the capacity auction, including those which relate to the calculation and reporting of AQLs.

Staff Training – National Gas Rules Part 24 & 25

Not delivered during the Relevant Periods, as superseded by specialised training session held July 2021

As part of a broader training program for staff in the Gas Markets business unit, materials for a training session on NGR Parts 24 and 25 were developed over 2020 and 2021.

Other modules of this program (focussed on other NGR parts) were delivered to members of the Gas Markets Commercial and Operations team (including the Commercial Operations team) during the Relevant Periods, and the Parts 24 and 25 module in the form referred to here was planned to be delivered to staff in mid 2021.

However, this module was not delivered to staff, as it was superseded by a more detailed training session focussing on AQLs in August 2021 following identification of the Authorised Overrun System error.

Time constraint impacts on pipeline scheduling – Protocol

Effective from 01/03/2019

Reviewed and updated on 14/04/2021 for the purposes of incorporating VicHub scheduling guidelines due to the addition of capacity auction shippers on this pipeline

A protocol document circulated to members of the Commercial Operations team and the Control room staff, which details additional timing constraints to be applied to team members’ activities when undertaking pipeline scheduling activities, including in relation to the calculation and reporting of AQLs. This document is stored in a shared file library accessible by Commercial Operations team members.

Staff training - Regulatory obligations for outages and capacity

10/11/2020

Training materials presented to staff involved in maintenance and outage planning activities, which included regulatory obligations relevant to those activities, including the provision of AQLs to AEMO.

Daily cadence

Effective from 1/03/2019, and updated for Gas Day Harmonisation from 9/10/2019

A document which sets out the key activity steps and timings associated with the capacity auction (and capacity trading), including the calculation and submission of AQLs. This document was available as reference material for Commercial Operations team members.

Standard

operating procedure for setting up new contracts and services for clients

Document effective from 21/05/2021

A manual created for the Commercial Operations team outlining the process of how to set up contracts and services in the PypIT system.

As part of this process a checklist needed to be completed which outlined processes to ensure correct services are included in relation to the AQL calculation.

Note: Entry of orders is dealt with in Rule 39.32 of the Federal Court Rules 2011.

Background

Background to the litigation

Evidence

Evidence Before The Court

Decision

Reasons for decision

Ratio Decidendi

Legal Principle Established

There was no other automated error reporting in place during the relevant period that would have identified the admitted errors other than by way of the “AQL limit check”, from 17 December 2020 and the “Service priority checks supported by dashboard” from 23 September 2021. This is because the errors were latent and generally only identifiable by a review of the system design and inputs. These checks formed part of the respondents’ practices and methods relating to the calculation of the AQLs during the Relevant Periods and are outlined in further detail in paragraph 2 of Annexure B to the orders.Cooperation with the AER (additional factor) The respondents voluntarily self-reported conduct to the AER and have cooperated with the AER during the course of the AER’s investigation and this proceeding. The respondents’ engagement with the AER in the course of this proceeding, and during the AER’s earlier investigations comprises:(a)initiating discussions with the AER in relation to AQL reporting errors in December 2020 and self-reporting on four occasions throughout 2021, including voluntarily providing information in respect of these self-reports;(b)providing fulsome information and documents to the AER in response to compulsory information gathering notices issued under s 42(1) of the NGL on two occasions;(c)responding fulsomely and in good faith to the AER’s requests for information;(d)attending mediation before the AER filed any lay or expert evidence;(e)engaging meaningfully with the AER in respect of negotiating and filing a detailed joint SoAF containing concessions; and(f)agreeing to resolve proceedings before the AER filed lay or expert evidence.Compliance practices and culture During the Relevant Periods, the respondents’ compliance practices relating to the calculation of AQLs, which are outlined in detail at paragraph 67 of the Amended SoAF (and extracted in paragraph 2 of Annexure B to the orders), were:(a)AQL spot checks;(b)AQL limit checks;(c)PypIT system audits;(d)Part 25 compliance reviews;(e)contract configuration data audit;(f)Internal Audit review of pipelines gas market reform management;(g)review of the contract handover process; and(h)service priority check supported by dashboard. During the Relevant Periods, the respondents’ policies, procedures and training for staff, which are outlined in detail at paragraph 68 of the Amended SoAF (and extracted in paragraph 3 of Annexure B to the orders), were:(a)the performance of daily and other procedural tasks required as a result of the capacity auction as set out in the GMR ComOps Manual;(b)staff training regarding Parts 24 and 25 of the NGR (although, ultimately, the training module was not delivered to staff as it was superseded by a more detailed training session focussing on AQLs in August 2021 following the identification of the Authorised Overrun System error);(c)protocols regarding additional time constraints to be applied to team members’ activities when undertaking pipeline scheduling activities, including in relation to the calculation and reporting of AQLs;(d)staff training regarding regulatory obligations for outages and capacity;(e)providing staff with the Daily Cadence document which set out key activity steps and timing associated with the capacity auction, including the calculation and submission of AQLs; and(f)a standard operating procedure for setting up new contracts and services for clients in the PypIT system, which included a checklist to ensure correct services were included in relation to the AQL calculation.