IN THE HIGH COURT OF NEW ZEALAND AUCKLAND REGISTRY
CIV-2012-404-6290 [2017] NZHC 511
BETWEEN BODY CORPORATE 346799
First Plaintiff
HA THI HOANG & ORS Second Plaintiffs
AND
KNZ INTERNATIONAL CO LIMITED First Defendant
BROOKFIELD MULTIPLEX CONSTRUCTIONS (NZ) LIMITED (IN LIQUIDATION)
Second Defendant
… continued
Hearing:
Further submissions:
12-14, 17-21 and 25 October 2016, 5 and 14 December 2016
1, 15, 19 and 21 December 2016
Counsel:
G B Lewis and L M Deane for Plaintiffs
D T Broadmore for Second Defendant
S A Thodey and L J Douglas for Fifth DefendantInterim Judgment:
7 March 2017
Final Judgment:
22 March 2017
JUDGMENT OF THOMAS J
This judgment was delivered by me on 22 March 2017 at 3.00 pm pursuant to Rule 11.5 of the High Court Rules.
Registrar/Deputy Registrar
Date:………………………….
BODY CORPORATE 346799 v KNZ INTERNATIONAL CO LIMITED [2017] NZHC 511 [7 March 2017]
FAÇADE DESIGN SERVICES LIMITED Third Defendant
PBS CONTRACTING LIMITED (IN LIQUIDATION)
Fourth Defendant (Discontinued)
AUCKLAND CITY COUNCIL Fifth Defendant
BOSTIK NEW ZEALAND LIMITED Sixth Defendant (Discontinued)
STEPHEN MITCHELL ENGINEERS LIMITED
First Third Party (Discontinued)
STEPHEN MITCHELL
Second Third Party (Discontinued)
CITY DESIGN LIMITED
Third Third Party (Discontinued)
DAVID LEE
Fourth Third Party (Discontinued)
DAVID JAMES FORSTER
Fifth Third Party (Discontinued)
TRISTAN D’ARCY HARVEY-SMITH Sixth Third Party (Discontinued)
WILLIS NEW ZEALAND LIMITED Seventh Third Party (Discontinued)
RONALD CHARLES HANLEY Eighth Third Party
Introduction ............................................................................................................. [1] Background.............................................................................................................. [7] Plaintiffs .............................................................................................................. [19] Additional assignees............................................................................................ [21] First defendant .................................................................................................... [23] Second defendant................................................................................................ [25] Evidence ................................................................................................................. [30] DEFECTS .............................................................................................................. [32] Cracked cladding sheets on Eterpanel system ................................................... [32] Balcony waterproofing defects ............................................................................. [38] Construction ........................................................................................................ [38]
Failure of membrane ........................................................................................... [41] Cause of membrane failure ................................................................................. [43] Internal damage .................................................................................................. [44] Building Code breaches ...................................................................................... [45] Podium ................................................................................................................... [48] Fire defects ............................................................................................................. [51] CLAIM AGAINST KNZ INTERNATIONAL CO LTD.................................... [54] Nature of duty of care ........................................................................................... [54] Breach..................................................................................................................... [62] Cracking to Eterpanel cladding system .............................................................. [63] Balconies ............................................................................................................. [66] Podium ................................................................................................................ [70] Fire defects .......................................................................................................... [73] Affirmative defences ............................................................................................. [75] CLAIM AGAINST MULTIPLEX ....................................................................... [77] Nature of duty of care ........................................................................................... [77] Responsibilities ................................................................................................... [83] Breach..................................................................................................................... [91] Cracking to Eterpanel cladding system .............................................................. [91] Balconies ............................................................................................................. [93] Podium ................................................................................................................ [96] Fire defects .......................................................................................................... [98] QUANTUM.......................................................................................................... [100] Claim for remedial work costs ........................................................................... [100] Consequential losses............................................................................................ [102] General damages ................................................................................................. [104] Approach ........................................................................................................... [104] Quantum ............................................................................................................ [112] GST....................................................................................................................... [128] Unit owners ....................................................................................................... [129] Body Corporate ................................................................................................. [130] Interest ................................................................................................................. [133] Award to Body Corporate .................................................................................. [134] Award to unit owners .......................................................................................... [136] Settlement............................................................................................................. [137] Costs ..................................................................................................................... [139] Legal costs......................................................................................................... [139] Disbursements ................................................................................................... [144] CROSS CLAIMS ................................................................................................ [145] Issues .................................................................................................................... [145] Liability ................................................................................................................ [147] Apportionment .................................................................................................... [155] Law .................................................................................................................... [155] Weathertight Homes Tribunal ........................................................................... [162] Application ........................................................................................................ [165] Conclusion......................................................................................................... [168] Amount................................................................................................................. [169] Reasonableness of the Settlement...................................................................... [169] Effect of the Settlement ...................................................................................... [173] Law .................................................................................................................... [179]
Analysis ............................................................................................................. [185] Orders sought ...................................................................................................... [193] Costs ..................................................................................................................... [194]
Introduction
[1] This claim concerns building defects at the Victopia Apartments (the Building),…
Keep reading for free
Create a free CaseChat account to read Body Corporate 346799 v KNZ International Co Ltd and more:
- Read every judgment in full
- Ask AI and get answers linked to paragraphs
- See how each paragraph was cited in later cases
- Download judgments as PDF or Word
One click creates your free account or signs you in.
By continuing you agree to the Terms and Privacy Policy.
- Case
- [2017] NZHC 511
- Decision Date
CaseChat Overview and Summary
The court found that KNZ and Multiplex were both liable for the defects. KNZ, as the developer, had a non-delegable duty of care to ensure the building was constructed in accordance with the Building Code. KNZ failed to ensure the Eterpanel cladding system would comply with the Code, failed to ensure the balcony waterproofing products were in accordance with the building consent, and failed to ensure the podium waterproofing was installed properly. Multiplex, as the head contractor, had a non-delegable duty of care and was also liable for the defects. Multiplex failed to properly review the Eterpanel cladding system design, failed to ensure the balcony waterproofing products were in accordance with the building consent, failed to properly install the podium waterproofing, and failed to properly undertake the fire stopping works.
The court awarded the plaintiffs $54,393,481 in damages for the cost of repairing the defects and consequential losses. The court also awarded general damages of $3,320,000 for stress and anxiety caused by the defects. The court awarded interest on expenditure of $106,189 and costs of $283,096.
The Auckland City Council cross-claimed against KNZ and Multiplex for contribution from them to the settlement it had made with the plaintiffs. The court found KNZ and Multiplex liable for 85% of the Council's liability and awarded the Council 85% of the settlement amount together with interest.
Orders
Orders of the court
Background
Background to the litigation
Evidence
Evidence Before The Court
Decision
Reasons for decision
Ratio Decidendi