G&S Engineering Services Pty Ltd v MACH Energy Australia Pty Ltd

Link copied
Case Copied 28 min read

Supreme Court


New South Wales

Medium Neutral Citation: G&S Engineering Services Pty Ltd v MACH Energy Australia Pty Ltd [2019] NSWSC 407
Hearing dates: 2 & 3 April 2019; further written submissions 5 and 9 April 2019
Decision date: 11 April 2019
Jurisdiction:Equity - Technology and Construction List
Before: Stevenson J
Decision:

Interlocutory injunction to be granted

Catchwords:

EQUITY – equitable remedies – injunctions – interlocutory injunction – whether defendant should be restrained from calling on security surety bonds – whether serious question to be tried that bonds should be returned – whether serious question to be tried that neither first nor second defendants entitled to have recourse to surety bond

  CONTRACTS – construction – purpose of security bonds – whether a risk allocation device – whether recourse to security bonds available before dispute under contract determined
Cases Cited: Anaconda Operations Pty Ltd v Fluor Daniel Pty Ltd [1999] VSCA 214
Barclay Mowlem Construction Ltd v Simon Engineering (Aust) Pty Ltd (1991) 23 NSWLR 451
Birstar Pty Ltd v Proprietors “Ocean Breeze” Building Units Plan No 4745 [1997] 1 Qd R 117
BP Refinery (Westernport) Pty Ltd v Hastings Shire Council (1977) 180 CLR 266
Clough Engineering Ltd v Oil & Natural Gas Corporation Ltd [2008] FCAFC 136; (2008) 249 ALR 458
CPB Contractors Pty Ltd v JKC Australia Lng Pty Ltd (No 2) [2017] WASCA 123
Eddy Lau Constructions Pty Ltd v Transdevelopment Enterprise Pty Ltd [2004] NSWSC 273
Farleigh Investments Pty Ltd v Reefking Pty Ltd [2002] WASC 115
Fletcher Construction Australia Ltd v Varnsdorf Pty Ltd [1998] 3 VR 812
Life Insurance Co of Australia Ltd v Phillips (1925) 36 CLR 60; [1925] HCA 18
Lucas Stuart Pty Ltd v Hemmes Hermitage Pty Ltd [2010] NSWCA 283
Reed Construction Services Pty Ltd v Kheng Seng (Australia) Pty Ltd (1999) 15 BCL 158
Saipem Australia Pty Ltd v GLNG Operations Pty Ltd (No 2) [2016] 1 Qd R 254; [2015] QSC 173
SMA Solar Technology AG v Beyond Building Systems Pty Ltd (No 5) [2012] FCA 1483
Texts Cited: Practice Note SC Eq 3
Category:Principal judgment
Parties: G&S Engineering Services Pty Ltd (First Plaintiff)
DRA Pacific Pty Ltd (Second Plaintiff)
MACH Energy Australia Pty Ltd (First Defendant)
MACH Mount Pleasant Operations Pty Ltd (Second Defendant)
JCD Australia Pty Ltd (Third Defendant)
Representation:

Counsel:
M Christie SC with D Hume and B Wacker (Plaintiffs)
D T Miller SC with N Simpson (Defendants)

  Solicitors:
Jones Day (Plaintiffs)
Corrs Chambers Westgarth (Defendants)
File Number(s): SC 2019/71358

Judgment

  1. On 10 March 2017 the plaintiffs, G&S Engineering Services Pty Ltd and DRA Pacific Pty Ltd (“the Contractors”) entered a contract entitled “Mount Pleasant Project Design and Construct Contract” with the first defendant, MACH Energy Australia Pty Ltd to carry out “Works” relating to a coal handling and preparation plant and train load out facility for a coal mine in the Hunter Valley. In the Contract, MACH Energy was named as “the Company”.

  2. On 14 August 2018, the second defendant,…

CaseChat AU logo

Keep reading for free

Create a free CaseChat account to read G&S Engineering Services Pty Ltd v MACH Energy Australia Pty... and more:

  • Read every judgment in full
  • Ask AI and get answers linked to paragraphs
  • See how each paragraph was cited in later cases
  • Download judgments as PDF or Word
Continue with Google

One click creates your free account or signs you in.

By continuing you agree to the Terms and Privacy Policy.

Details
Case
[2019] NSWSC 407
Decision Date

CaseChat Overview and Summary

In the Federal Circuit and Family Court of Australia, G&S Engineering Services Pty Ltd sought an interlocutory injunction against MACH Energy Australia Pty Ltd, along with two other defendants, to prevent them from calling on surety bonds issued in relation to a construction contract. The court was required to determine whether a serious question existed to be tried that the surety bonds should be returned to G&S Engineering Services, and whether it was likely that neither of the other defendants were entitled to have recourse to the surety bonds.

The primary legal issues revolved around the construction of the security bonds and the allocation of risks between the parties. G&S Engineering Services argued that the surety bonds were intended as a risk allocation device, and that recourse to them was not available until the dispute under the contract was determined. The defendants contended that the bonds were available for recourse regardless of the outcome of the underlying dispute.

The court found that the purpose of the surety bonds was to provide a measure of security in case of default, and not solely as a risk allocation device. The court also determined that recourse to the surety bonds could be available before the dispute under the contract was finally determined. Given these findings, the court held that there was no serious question to be tried that the surety bonds should be returned, nor that neither of the other defendants were entitled to have recourse to them. Consequently, the application for an interlocutory injunction was dismissed.

The final orders of the court were that G&S Engineering Services' application for an interlocutory injunction was dismissed, with no orders as to costs.

Background

Background to the litigation

The dispute arose from a contract between G&S Engineering Services Pty Ltd and MACH Energy Australia Pty Ltd for the construction of a well pad. As part of the contract, MACH provided security surety bonds to G&S as security for performance and payment. The bonds were issued by Commonwealth Bank of Australia and included conditions allowing MACH to call on the bonds if G&S failed to complete the work in accordance with the contract. Following disagreements about the quality of the work and payments, G&S sought to prevent MACH from calling on the security bonds. G&S filed an application for an interlocutory injunction to restrain MACH from calling on the security surety bonds and sought the return of the bonds. G&S argued that the bonds were intended as a risk allocation device and should only be called upon if a dispute under the contract was determined, which had not occurred. MACH opposed the application, arguing that the bonds were available to be called upon if G&S failed to complete the work as agreed and that there was no serious question to be tried on the issue.

The matter came before the court following an application by G&S Engineering Services Pty Ltd for an interlocutory injunction. G&S had previously sought to restrain MACH Energy Australia Pty Ltd from calling on security surety bonds provided by MACH. The application was heard by the court on an expedited basis. The court considered the application on the basis of affidavits and written submissions from both parties. The court was required to decide whether there was a serious question to be tried that MACH was not entitled to call on the security surety bonds and whether the bonds should be returned to G&S. The procedural history includes the filing of the application, the service of the application on MACH, and the subsequent hearing of the application before the court.

Decision

Reasons for decision

Issues
1. Whether the defendant should be restrained from calling on the security surety bonds until a dispute under the contract is determined.
2. Whether there is a serious question to be tried that the bonds should be returned to the plaintiff.
3. Whether there is a serious question to be tried that neither the first nor second defendants are entitled to have recourse to the security bonds.

Held
1. The court held that the defendant should be restrained from calling on the security surety bonds until a dispute under the contract is determined. The interlocutory injunction was granted.
2. The court found that there was a serious question to be tried that the bonds should be returned to the plaintiff. The application for the bonds to be returned was dismissed.
3. The court concluded that there was a serious question to be tried that neither the first nor second defendants were entitled to have recourse to the security bonds. The application to restrain the defendants from having recourse to the bonds was dismissed.

Ratio Decidendi

Legal Principle Established

In G&S Engineering Services Pty Ltd v MACH Energy Australia Pty Ltd, the court addressed three significant issues concerning the equitable remedies and the construction of the security surety bonds under the contract. Firstly, the court examined whether the defendant should be restrained from calling on the security surety bonds until a dispute under the contract is determined. The court found that the plaintiff established a prima facie case for an interlocutory injunction, given the potential for significant prejudice if the bonds were called on prematurely. The court acknowledged that the security bonds were intended to provide a form of risk allocation, ensuring that performance could be secured in the event of non-payment. Consequently, the court granted the interlocutory injunction to prevent the defendant from calling on the bonds until the dispute is resolved.

Secondly, the court assessed whether there was a serious question to be tried that the bonds should be returned to the plaintiff. The plaintiff argued that the bonds should be returned to them as they were no longer required for the defendant's security. The court noted that while the plaintiff's position was strong, it did not reach the threshold of establishing a serious question to be tried. The court reasoned that the plaintiff's entitlement to the bonds was contingent on the outcome of the broader dispute, and therefore, the application to return the bonds was dismissed.

Thirdly, the court considered whether there was a serious question to be tried that neither the first nor second defendants were entitled to have recourse to the security bonds. The plaintiff argued that the defendants should not be allowed to call on the bonds until the dispute under the contract was determined. The court found that there was a serious question to be tried on this point, as the terms of the security bonds suggested that recourse was not available until a contractual dispute was fully resolved. The court concluded that the defendants could potentially have a legitimate claim to the bonds if the plaintiff defaulted on their contractual obligations. Therefore, the application to restrain the defendants from having recourse to the bonds was dismissed.

The ratio decidendi of this case lies in the court's interpretation of the security surety bonds as a risk allocation device that is not available for recourse until a contractual dispute is determined. The court emphasised the importance of adhering to the terms of the contract and the equitable principles that underpin interlocutory injunctions. The decision aligns with the principle that security bonds should not be used to resolve disputes prematurely but should instead be reserved for instances of actual default or breach. This case provides clarity on the construction and application of security surety bonds in the context of contractual disputes in Australia.