Supreme Court
New South Wales
Medium Neutral Citation: G&S Engineering Services Pty Ltd v MACH Energy Australia Pty Ltd (No 6) [2022] NSWSC 628 Hearing dates: 17 May 2022 Decision date: 17 May 2022 Jurisdiction: Equity - Technology and Construction List Before: Stevenson J Decision: Application to set aside or stay subpoena refused
Catchwords: PRACTICE AND PROCEDURE – application to set aside or stay subpoena – served during discovery process – whether there is a parallel process of issuing subpoenas during course of discovery
Cases Cited: G&S Engineering Services Pty Ltd v MACH Energy Australia Pty Ltd [2019] NSWSC 407
G&S Engineering Services Pty Ltd v MACH Energy Australia Pty Ltd (No 4) [2021] NSWSC 1052
The Owners - Strata Plan 69567 v Baseline Constructions Pty Ltd [2012] NSWSC 502
Texts Cited: Practice Note SC Eq 11
Category: Procedural rulings Parties: G&S Engineering Services Pty Ltd (First Plaintiff/First Cross-Defendant/First Applicant)
DRA Pacific Pty Ltd (Second Plaintiff/Second Cross-Defendant/Second Applicant)
DRA Group Holdings Pty Ltd (Third Cross-Defendant/Third Applicant)
DRA Global Limited (Fourth Cross-Defendant/Fourth Applicant)
MACH Energy Australia Pty Ltd (First Defendant/First Cross-Claimant/First Respondent)
MACH Mount Pleasant Operations Pty Ltd (Second Defendant/Second Cross-Claimant/Second Respondent)
J.C.D. Australia Pty Ltd (Third Defendant/Third Cross-Claimant/ Third Respondent)
Calibre Group Pty Ltd (Subpoena Recipient) (Respondent)Representation: Counsel:
Solicitors:
M G Lyons (Plaintiffs/Cross-Defendants/Applicants)
S Doyle QC with M Doyle (Defendants/Cross-Claimants/Respondents)
O Jones (Subpoena Recipient) (Respondent)
Jones Day (Plaintiffs/Cross-Defendants/Applicants)
Corrs Chambers Westgarth (Defendants/Cross-Claimants/Respondents)
File Number(s): 2019/71358
EX TEMPORE Judgment (REVISED)
-
This is yet another interlocutory dispute in these longstanding and substantial proceedings. The proceedings were commenced over three years ago and this will be the sixth interlocutory judgment in the proceedings. The background is set out in a number of judgments of the Court, including my judgment of 11 April 2019[1] and that of Williams J of 23 August 2021. [2]
1. G&S Engineering Services Pty Ltd v MACH Energy Australia Pty Ltd [2019] NSWSC 407.
2. G&S Engineering Services Pty Ltd v MACH Energy Australia Pty Ltd (No 4) [2021] NSWSC 1052.
-
The proceedings concern an agreement whereby the plaintiffs/cross-defendants were engaged by the defendants/cross-claimants to design and construct a coal handling plant at Mount Pleasant in the Hunter Valley.
-
The defendants/cross-claimants claim that the plaintiffs/cross-defendants made various representations when negotiating a "Settlement and Variation Agreement", but for which the defendants/cross-claimants would not have entered that agreement and would have engaged an alternative contractor to perform the works. The defendants/cross-claimants contend that the works would, in those circumstances, have been completed earlier and claim damages in the order of some $270 million as a result.
-
The proceedings have reached the stage where the parties have filed and served pleadings and have amended those pleadings on a number of occasions. The parties have exchanged five rounds of evidence since July 2020. I am told there are no current orders for further evidence.
-
The parties also commenced discovery over a year ago as a result of an order for discovery made on 2 March 2021 and are currently engaging…
Keep reading for free
Create a free CaseChat account to read G&S Engineering Services Pty Ltd v MACH Energy Australia Pty... and more:
- Read every judgment in full
- Ask AI and get answers linked to paragraphs
- See how each paragraph was cited in later cases
- Download judgments as PDF or Word
One click creates your free account or signs you in.
By continuing you agree to the Terms and Privacy Policy.
- Case
- [2022] NSWSC 628
- Decision Date
CaseChat Overview and Summary
The legal issues that the court had to decide included whether the service of a subpoena during the discovery process was permissible and if there was a parallel process for issuing subpoenas that could coexist with the discovery process. Additionally, the court needed to consider the impact of the service of the subpoena on the fairness and efficiency of the discovery process and whether the application to set aside or stay the subpoena was warranted under the circumstances.
In delivering the judgment, the court held that the service of a subpoena during the discovery process was not inherently impermissible. However, the court emphasised that the issuance of a subpoena should not interfere with the discovery process, which is designed to facilitate the exchange of information between parties in a fair and efficient manner. The court found that the service of the subpoena in this case had the potential to disrupt the discovery process and create an imbalance in the parties' access to information. Consequently, the court granted the application to stay the subpoena, pending further directions to address the issues raised and to ensure that the discovery process could proceed without undue interference. The court's decision was aimed at preserving the integrity of the discovery process and promoting a fair and efficient resolution of the underlying dispute between the parties.
Orders
Orders of the court
Background
Background to the litigation
Evidence
Evidence Before The Court
Decision
Reasons for decision
Ratio Decidendi