IN THE HIGH COURT OF NEW ZEALAND CHRISTCHURCH REGISTRY
CIV-2013-409-1775 [2017] NZHC 2136
BETWEEN XIAOMING HE
Plaintiff
AND
THE EARTHQUAKE COMMISSION First Defendant
AND
CERTAIN SYNDICATES OF LLOYDʼS OF LONDON SEVERALLY SUBSCRIBED TO COVERHOLDER CONTRACT B0429CNG90466
First Second Defendant
AND
CERTAIN SYNDICATES OF LLOYDʼS OF LONDON SEVERALLY SUBSCRIBED TO COVERHOLDER CONTRACT B0429CNG110466
Second Second Defendant
Hearing: 12-16, 21-23 June and 3-4 July 2017 Appearances:
P A Cowey and A J Summerlee for Plaintiff
B A Scott and G M Scott-Jones for First Defendant
R M Flinn and A W Moore for Second DefendantJudgment:
4 September 2017
JUDGMENT OF DUNNINGHAM J
HE v THE EARTHQUAKE COMMISSION [2017] NZHC 2136 [4 September 2017]
Table of Contents
Introduction ............................................................................................................[1] The property at 377 Selwyn Street .........................................................................[7] Background to the claim ......................................................................................[15] Cover under the EQC Act ....................................................................................[31] Cover under the insurance policies ......................................................................[38] Case management of these proceedings...............................................................[45] The plaintiff’s evolving case ................................................................................[51] The relevant law ...................................................................................................[55] Burden of proof [55] What is damage? [60]
What was the condition of the property prior to the Canterbury earthquake sequence? .............................................................................................................[69]
Evidence of Mr He [72] Evidence of Ms Ye [74] Evidence of Mr Loh [76] Photographic evidence [85] Physical evidence relating to the structure itself [90] What damage was suffered in the 4 September 2010 earthquake? ......................[93] What damage was claimed? [93] What damage occurred? [97] Has EQC met its obligations in respect of the September damage? [98] What damage was suffered in the 22 February 2011 earthquake? .....................[122] What damage was claimed? [124] What is the expert evidence in relation to these claims? [125] Were the wall linings damaged? [159] Was there damage to the exterior weatherboards? [162] Did the earthquake damage walls and veranda posts through “racking”? [167] Was there damage to the perimeter foundation? [172] What damage was suffered in the 13 June 2011 earthquake? ............................[192] What damage is claimed? [192] Was there damage to the concrete hardstand or other hard-landscaping? [197] Was there damage to the garages? [199]
Outcome on the plaintiff’s claims for earthquake damage ................................[213] Interest ................................................................................................................[215] Costs ...................................................................................................................[217]
Introduction
[1] Mr He, the plaintiff, owns a property on a street corner at 377 Selwyn Street, Addington. The property comprises a house, of indeterminate age, but likely to be at least 80 years old, which has a shop attached to the front of it opening on to Selwyn Street. The shop is run as a dairy and Mr He rents the house and shop to a tenant.
[2] Mr He’s property was insured during the Canterbury earthquakes in 2010 and
2011 with the second defendants. The second defendants accept that, in the event of damage to the property by the earthquake, they would provide earthquake insurance cover for loss or damage not covered by the first defendant, the Earthquake Commission (EQC), in accordance with the terms of the respective insurance policies.
[3] To date, EQC has paid approximately $16,000 to Mr He for repairs to the house. However, Mr He claims EQC should have paid him the…
Continue reading He v Earthquake Commission
Sign in free to access the full text
- AGLC
- He v Earthquake Commission [2017] NZHC 2136
- Case
- [2017] NZHC 2136
- Decision Date
CaseChat Overview and Summary
Orders
Orders of the court
Full text does not contain this section.
Background
Background to the litigation
Full text does not contain this section.
Evidence
Evidence Before The Court
Full text does not contain this section.
Decision
Reasons for decision
Full text does not contain this section.
Ratio Decidendi
Legal Principle Established
Full text does not contain this section.