Watson v Kriticos (Further Discovery and Adjournment)

Link copied
Case Copied 30 min read

FEDERAL COURT OF AUSTRALIA

Watson v Kriticos (Further Discovery and Adjournment) [2023] FCA 793  

File number: NSD 970 of 2019
Judgment of: PERRAM J
Date of judgment: 14 July 2023
Catchwords: PRACTICE AND PROCEDURE – application for further discovery and adjournment of trial – whether reasonable grounds for being fairly certain that documents disclosing energy recycling mechanism in Second Respondent’s surf machines exist
Legislation:

Federal Court Rules 1979 (Cth) (repealed) O 15 r 8

Federal Court Rules 2011 (Cth) rr 1.40(a), 14.1, 20.21

Cases cited:

Basetec Services Pty Ltd v Leighton Contractors Pty Ltd (No 3) [2015] FCA 767

Beecham Group Ltd v Bristol Myers Co [1979] VR 273

British Association of Glass Bottle Manufacturers Ltd v Nettlefold [1912] AC 709

Edwards v Nine Network Australia Pty Ltd (No 2) [2022] FCA 1332

Fig Tree Developments Ltd v Australian Property Custodian Holdings Ltd [2008] FCA 1041

Guy Carpenter & Company Pty Ltd v Grove (No 2) [2011] FCA 1190

Metcash Trading Limited v Bunn [2010] FCA 8; 263 ALR 132

Norm Engineering Pty Ltd v Digga Australia Pty Ltd [2005] FCA 1378

Orient Overseas Container Line Ltd v ANL Singapore Pte Ltd [2020] FCA 921

Procter v Kalivis [2009] FCA 1518; 263 ALR 461

Shoreform (Qld) Pty Ltd v Millenium Coal Pty Ltd [2013] FCA 645

Voxson Pty Ltd v Telstra Corporation Limited (No 7) [2017] FCA 267

Voxson Pty Ltd v Telstra Corporation Limited (No 10) [2018] FCA 376; 134 IPR 99

Watson v Kriticos (Summary Judgment) [2021] FCA 261

Division: General Division
Registry: New South Wales
National Practice Area: Intellectual Property
Sub-area: Patents and associated Statutes
Number of paragraphs: 66
Date of hearing: 10 July 2023
Counsel for the Applicant: Mr G Campbell (direct access)
Counsel for the First Respondent: Mr D Ananian-Cooper
Solicitor for the First Respondent: Plastiras Lawyers
Counsel for the Second Respondent: Mr V Bedrossian SC
Solicitor for the Second Respondent: MinterEllison

ORDERS

NSD 970 of 2019
BETWEEN:

DALE CAMERON WATSON

Applicant

AND:

STEPHEN CON KRITICOS

First Respondent

WHITEWATER WEST INDUSTRIES LTD.

Second Respondent

ORDER MADE BY:

PERRAM J

DATE OF ORDER:

14 JULY 2023

THE COURT ORDERS THAT:

1.The trial due to commence on 11 September 2023 be vacated.

2.Prayer 1(c) of Mr Watson’s interlocutory application dated 4 July 2023 be stood over generally with an entitlement to all parties to have it relisted for directions on 7 days’ notice. 

3.By 4.00 pm on 21 July 2023, the parties provide a form of orders providing for further discovery in relation to the FlowSurf machine and inspection of the other machines.

4.In the event that agreement cannot be reached, the parties provide their competing orders by 4.00 pm on 21 July 2023.

5.The parties provide short written submissions of no more than three pages dealing with the form of the orders by 4.00 pm on 28 July 2023.

6.That question be dealt with on the papers.

7.Costs be reserved.

Note:   Entry of orders is dealt with in Rule 39.32 of the Federal…

CaseChat AU logo

Keep reading for free

Create a free CaseChat account to read Watson v Kriticos (Further Discovery and Adjournment) and more:

  • Read every judgment in full
  • Ask AI and get answers linked to paragraphs
  • See how each paragraph was cited in later cases
  • Download judgments as PDF or Word
Continue with Google

One click creates your free account or signs you in.

By continuing you agree to the Terms and Privacy Policy.

Details
Case
[2023] FCA 793
Decision Date

CaseChat Overview and Summary

The case of Watson v Kriticos (Further Discovery and Adjournment) involved a dispute between the applicant, Mr Watson, and the respondents, Mr Kriticos and his company, Whitewater. The primary issue at hand was whether there were reasonable grounds for being fairly certain that documents existed disclosing an energy recycling mechanism in the respondents' surf machines. This case was heard in the Federal Court of Australia.

The legal issues the court needed to decide included whether the applicant had a sufficient basis for his belief that undisclosed documents existed, and if so, whether this justified granting an application for further discovery and an adjournment of the trial. The applicant's case was based on several pieces of evidence, including a patent, email communications, and website printouts. The court had to assess the strength of this evidence in determining whether the applicant's application should proceed.

The court found that there were reasonable grounds for being fairly certain that relevant documents existed. This conclusion was based on the applicant's evidence, particularly the United States Patent 9,878,255 B2, which suggested the existence of an energy recycling mechanism. The court emphasised the importance of ensuring all relevant evidence is considered before a trial proceeds. Consequently, the court granted the application for further discovery and adjourned the trial to allow for the inspection of the surf machines and the production of any relevant documents. The parties were directed to provide further orders, written submissions, and to pay costs as reserved.

In summary, the court's decision hinged on the reasonable grounds for suspecting the existence of undisclosed documents and the necessity for these documents to be inspected before proceeding with the trial. The adjournment and further discovery were deemed necessary to ensure a fair trial.

Orders

Orders of the court

1. The trial due to commence on 11 September 2023 be vacated.

2. Prayer 1(c) of Mr Watson’s interlocutory application dated 4 July 2023 be stood over generally with an entitlement to all parties to have it relisted for directions on 7 days’ notice.

3. By 4.00 pm on 21 July 2023, the parties provide a form of orders providing for further discovery in relation to the FlowSurf machine and inspection of the other machines.

4. In the event that agreement cannot be reached, the parties provide their competing orders by 4.00 pm on 21 July 2023.

5. The parties provide short written submissions of no more than three pages dealing with the form of the orders by 4.00 pm on 28 July 2023.

6. That question be dealt with on the papers.

7. Costs be reserved.

Note: Entry of orders is dealt with in Rule 39.32 of the Federal Court Rules 2011.

Background

Background to the litigation

Full text does not contain this section.

Evidence

Evidence Before The Court

It follows that the standard to be applied is whether there are reasonable grounds for being fairly certain that there are other relevant documents.Evidence As finally advanced during the hearing, Mr Watson’s case about this was based on eight items of evidence:(a)United States Patent 9,878,255 B2 (‘the 255 Patent’);(b)A four email chain commencing on 3 May 2018 between Mr Marshall Myrman (the President of Whitewater), Mr Erikson Squier (Senior Counsel at Buchalter) and Mr Kriticos;(c)A printout from Whitewater’s website dated 10 July 2023 which, without objection, was Exhibit One;(d)Another printout from Whitewater’s website dated 28 October 2021; and(e)Paragraph [29] of Mr Myrman’s affidavit dated 14 June 2023. It is necessary to consider these separately.The 255 Patent Amongst other allegations, Mr Kriticos alleges that the 255 Patent obtained by Whitewater includes Mr Kriticos’s inventive concept. As the argument was developed on the hearing of the application, Mr Watson sought to define Mr Kriticos’s inventive concept by reference to this patent and, in particular, by reference to the concept of an energy recycling mechanism which he alleges it embodies. The 255 Patent is entitled ‘Surfing Device and Method’. The background to the patent describes the invention as relating ‘to the water sports of surfing and skiing and in particular to surfing or skiing simulation.’ The summary to the 255 Patent says this:The present invention is related to water surfing or skiing simulation. In one embodiment, a surfing device may comprise at least one energy projecting means for projecting energy on a surface, at least one energy recycling means for recycling at least some energy of the projected energy, and at least one corresponding energy projecting structure. The patent has two independent claims, claims 1 and 8. Claim 8 is as follows:8. A surfing device comprising: a support structure comprising a front end and a rear end, a ride surface comprising a first end and a second end, at least one energy projector configured to adjustably project a first energy on the ride surface wherein the energy provides a surfing surface located at a distance from the ride surface, at least one energy recycling mechanism configured to adjustably project a second energy on the ride surface wherein the second energy comprising at least a portion of the first energy, an energy relief mechanism configured to adjustably remove the first energy and/or second energy from the ride surface, and a planar object for surfing comprising an upper surface, an underneath surface, a data receiving terminal, and a data emitting terminal; the data receiving terminal is configured to receive a plurality of data comprising the planar object's location and/or spatial orientation; the data emitting termination is configured to emit the plurality of data for adjusting the at least one energy projector, the at least one energy recycling mechanism, and/or the energy relief mechanism; the ride surface being supported by connecting the first end to the front end of the support structure and connecting the second end to the rear end of the support structure;the at least one energy projector being located substantially flush with the ride surface, and being configured to project the first energy at an angle relative to the ride surface;the at least one energy recycling mechanism is located proximal to the front end of the support structure and/or proximal to the at least one energy projector, wherein the second energy interacts with the first energy.

Decision

Reasons for decision

Full text does not contain this section.

Ratio Decidendi

Legal Principle Established

Full text does not contain this section.