Courts v Essential Energy (aka Country Energy)

Link copied
Case Copied 72 min read

Supreme Court


New South Wales

Medium Neutral Citation: Courts v Essential Energy (aka Country Energy) [2014] NSWSC 1483
Hearing dates:7, 8, 9, 10, 13 and 14 October 2014
Decision date: 29 October 2014
Before: Adamson J
Decision:

1. Judgment for the plaintiff against the defendants in the sum of $656,542 (the judgment sum).

2. Declare that liability for the judgment sum be apportioned such that the first defendant is liable for two-thirds of the judgment sum and the second defendant is liable for one-third of the judgment sum and determine the cross-claims between them accordingly.

3. Reserve the question of the costs of the proceedings and of the cross-claims and direct that any applications for costs be made in writing to my Associate within seven (7) days hereof, together with an indication whether the relevant party consents to the application being dealt with on the papers, or whether the matter ought be listed for oral argument.

Catchwords:

TORTS - negligence - joint tortfeasors - plaintiff independent contractor suffered an electric shock after coming into contact with an uninsulated high voltage power line while unloading sheep from a trailer - duty of electricity authority to take reasonable care with respect to construction of power lines to achieve appropriate ground clearance having regard to its design, applicable guidelines and the known and expected use of the land - risk of significant harm from contact with power lines - electricity authority did not construct line in accordance with Guidelines or its own design - duty of occupier of property to take reasonable care not to expose entrant to an unreasonable risk of injury - duty extends to considering the possibility that some entrants may be careless for their own safety - occupier ought to have controlled the plaintiff's selection of location to unload away from the area under the power line -

CONTRIBUTORY NEGLIGENCE - contributory negligence of plaintiff considerable in selection of location in which to unload - failed to take reasonable care for his own safety- reduction of 40%

DAMAGES - joint expert report on past economic loss not accepted due to unproved assumptions - buffer warranted - future economic loss based on plaintiff's need to obtain assistance from others and cost of such assistance -
Legislation Cited: Civil Liability Act 2002 (NSW), ss 5B, 5C, 5F, 5G, 5H, 5R, 13, 16
Electricity Supply Act 1995 (NSW), s 191
Electricity Supply (Safety Plans) Regulation 1997 (NSW), cl 6
Cases Cited: Allianz Australia Insurance Limited v Cervantes [2012] NSWCA 244
Bankstown Foundry Pty Limited v Braistina (1986) 160 CLR 301
Brodie v Singleton Shire Council; Ghantous v Hawkesbury City Council [2001] HCA 29; 206 CLR 512
Bus v Sydney City Council (1989) 167 CLR 78
Chapman v Hearse [1961] HCA 46; 106 CLR 112
Crimmins v Stevedoring Committee [1999] HCA 59; 200 CLR 1
Graham v Baker [1961] HCA 48; 106 CLR 340
Husher v Husher [1999] HCA 47; 197 CLR 138
Jones v Dunkel [1959]…
CaseChat AU logo

Keep reading for free

Create a free CaseChat account to read Courts v Essential Energy (aka Country Energy) and more:

  • Read every judgment in full
  • Ask AI and get answers linked to paragraphs
  • See how each paragraph was cited in later cases
  • Download judgments as PDF or Word
Continue with Google

One click creates your free account or signs you in.

By continuing you agree to the Terms and Privacy Policy.

Details
Case
[2014] NSWSC 1483
Decision Date

CaseChat Overview and Summary

In the case of Courts v Essential Energy, the plaintiff, an independent contractor, claimed damages for injuries sustained from an electric shock after coming into contact with an uninsulated high voltage power line while unloading sheep from a trailer. The dispute was heard in the Court of Appeal. The key issues were whether Essential Energy, as the electricity authority, owed a duty of care in constructing the power line to achieve appropriate ground clearance and whether the occupier of the property had a duty to prevent the plaintiff from exposing himself to an unreasonable risk of injury. Additionally, the court examined the plaintiff's contributory negligence and the appropriate assessment of damages.

The court concluded that Essential Energy had failed to construct the power line in accordance with the relevant guidelines and its own design, thereby breaching its duty of care. The occupier of the property, while not strictly liable, had a duty to consider the safety of entrants and should have controlled the plaintiff's selection of location to avoid the area under the power line. The plaintiff's contributory negligence was considerable, particularly in his selection of the unloading location, resulting in a reduction of 40% in damages. Regarding damages, the court did not accept the joint expert report on past economic loss due to unproven assumptions, but accepted the basis for calculating future economic loss, which was premised on the plaintiff's need to obtain assistance from others and the cost of such assistance.

The court's decision upheld the primary judgment, with the exception of the reduction in damages for contributory negligence, which was increased from 25% to 40%. The plaintiff's damages were assessed based on the court's findings, reflecting the adjustments for contributory negligence and the approved method for calculating future economic loss.

Orders

Orders of the court

Background

Background to the litigation

Evidence

Evidence Before The Court

Decision

Reasons for decision

Ratio Decidendi

Legal Principle Established