Clough Engineering Ltd v Oil & Natural Gas Corporation Ltd

Link copied
Case Copied 33 min read

FEDERAL COURT OF AUSTRALIA

Clough Engineering Ltd v Oil & Natural Gas Corporation Ltd [2007] FCA 881  

INJUNCTION – interim interlocutory injunction – whether serious issues to be tried – whether applicant contractor may enjoin respondent principal from taking further steps to demand or obtain payment under performance guarantees issued by respondent banks – whether applicant contractor guilty of unconscionable conduct in contravention of Trade Practices Act 1974 (Cth) s 51AA.

PRACTICE AND PROCEDURE – leave to serve proceeding in India – Federal Court Rules O 8 – whether proceeding of kind(s) mentioned in O 8 r 2 – whether prima facie case of contravention of s 51AA if the Trade Practices Act 1974 (Cth) by calling on performance guarantees by respondent banks when no contractual entitlement to do so.

Trade Practices Act 1974 (Cth), ss 2, 4(1), 51AA, 80(1), 82, 86(1), 87
Judiciary Act 1903 (Cth), s 39B(1A)(c)

ACCC v Samton Holdings Pty Ltd (2002) 117 FCR 301

ACCC v CG Berbatis Holdings Pty Ltd (2003) 214 CLR 51

Akai Pty Ltd v People Insurance Co Ltd (1996) 188 CLR 418

Australian Broadcasting Corp v O'Neill (2006) 229 ALR 457,

Australian Competition and Consumer Commission v Samton Holdings Pty Ltd (2002) 117 FCR 301

Australian Winch and Haulage Company Pty Ltd (admin appt) v Walter Construction Group Ltd [2002] FCA 1181

Bolivinter Oil SA v Chase Manhattan Bank NA [1984] 1 WLR 392

Boral Formwork v Action Makers (2003) ATPR 41-953

Bray v F Hoffmann-La Roche Ltd (2003) 130 FCR 317
Burgundy Royale Investments v Westpac Banking Corporation (1987) 18 FCR 212
Clark Equipment Australia Ltd v Covcat Pty Ltd (1987) 71 ALR 367
Commonwealth Bank of Australia v White [1999] 2 VR 681
Darlington Futures Ltd v Delco Australia Pty Ltd (1986) 161 CLR 500
Dunlop Rubber Co Ltd v Dunlop [1921] 1 AC 367
Edward Owen Engineering Ltd v Barclays Bank International Ltd [1978] 1 QB 159

Entores Ltd v Miles Far East Corporation [1955] 2 QB 327

Esal (Commodities) Ltd v Oriental Credit Ltd [1985] 2 Lloyd's Rep 546
Eurogold Ltd v Oxus Holdings (Malta) Ltd [2007] FCA 811
Fletcher Construction Australia Ltd v Varnsdorf Pty Ltd [1998] 3 VR 812
Foran v Wight (1989) 168 CLR 385

Henjo Investments Pty Ltd v Collins Marrickville Pty Ltd (No 1) (1988) 39 FCR 546

Hi-Fert Pty Ltd v Kukiang Maritime Carrier Inc (1998) 90 FCR 1

Hortico (Aust) Pty Ltd v Energy Equipment Co (Aust) Pty Ltd[1985] 1 NSWLR 545

Houghton v Arms (2006) 231 ALR 534

Hume Computers Pty Ltd v Exact International BV [2006] FCA 1440
IE Contractors Ltd v Lloyds Bank plc [1990] 2 Lloyd's Rep 496

IOOF Australia Trustees (NSW) Ltd v Tantipech (1998) 156 ALR 470

Leigh-Mardon Pty Ltd v PRC Inc (1993) 44 FCR 88
Mackay v Dick (1881) 6 App Cas 251

Merpro Montassa Ltd v Conoco Specialty Products Inc (1991) 28 FCR 387

Neilson v Overseas Projects Corp of Victoria Ltd (2005) 223 CLR 331
Newcombe…

CaseChat AU logo

Keep reading for free

Create a free CaseChat account to read Clough Engineering Ltd v Oil & Natural Gas Corporation Ltd and more:

  • Read every judgment in full
  • Ask AI and get answers linked to paragraphs
  • See how each paragraph was cited in later cases
  • Download judgments as PDF or Word
Continue with Google

One click creates your free account or signs you in.

By continuing you agree to the Terms and Privacy Policy.

Details
Case
[2007] FCA 881
Decision Date

CaseChat Overview and Summary

Clough Engineering Ltd v Oil & Natural Gas Corporation Ltd involved a dispute between Clough Engineering Ltd and Oil & Natural Gas Corporation Ltd (ONGC) regarding the enforcement of performance guarantees. The case was heard in the Federal Court of Australia. Clough had been awarded a contract by ONGC for the development of oil/gas fields in India, and performance guarantees were provided by third-party banks. ONGC sought to call on these guarantees due to alleged breaches by Clough, but Clough contested ONGC's entitlement to do so.

The primary legal issues addressed by the court were whether ONGC was legally entitled to demand payment from the banks under the performance guarantees and if Clough's alleged breaches justified such a demand. The court had to examine the contractual obligations, the nature of the guarantees, and the conditions under which they could be called upon. It was also necessary to determine whether the alleged breaches by Clough warranted ONGC's action to demand payment.

The Federal Court found that there were serious questions to be tried regarding ONGC's entitlement to call on the performance guarantees. The court noted that the contract between Clough and ONGC was binding upon receipt of the notification of award by Clough. However, the court concluded that there were unresolved issues regarding the extent of Clough's obligations and whether the alleged breaches were material enough to justify ONGC's action. The court granted an injunction restraining ONGC from taking any further steps to demand or obtain payment from the banks under the performance guarantees until further order.

The court's decision hinged on the unresolved issues about the contractual entitlements and obligations of the parties. It was not prepared to grant the relief sought by ONGC without first determining these issues in a full trial. The court considered that the case involved complex contractual arrangements and significant amounts of money, which warranted a cautious approach before allowing ONGC to proceed with demanding payment from the banks. The court's injunction effectively put a temporary halt to ONGC's attempt to enforce the guarantees, pending the resolution of the underlying contractual disputes.

Orders

Orders of the court

1. The Applicant have leave to amend its Application in terms of the minute of Amended Application.

2. Leave is granted to serve the Amended Application outside the Commonwealth of Australia, namely, in India, on the First Respondent at Jeevan Bharati, Tower-II, 124 Indira Chowk, New Delhi – 110 001, with the service of the Amended Application to be accompanied by a copy of the Affidavits Kulasegaram Siritharan sworn on 25 May 2007, Affidavit of Malcolm Rutter 5 June 2007, Affidavits of Jae-Ho Choe sworn on 5 June 2007, Affidavit of Richard Francis Simons sworn on 28 May 2007, and any further affidavits filed in support of the Amended Application.

3. Upon the Applicant providing an undertaking as to damages, the First Respondent be restrained and an injunction is hereby granted, until 4.15 pm on 12 June 2007 or further order, restrained the First Respondent from:

(a) taking any further step to demand or to obtain payment; or

(b) renewing or claiming to renew a demand for payment,

from any one or more of the Second, Third or Fourth Defendant under the performance guarantees granted by the Second, Third and Fourth Respondents dated 14 January, 19 January and 13 January 2005 respectively.

4. There be liberty to apply.

5. These proceedings be adjourned until 10.15 am 12 June 2007.

6. Costs be reserved.

Background

Background to the litigation

In granting those orders I concluded that there were serious questions to be tried whether ONGC was entitled under the contract to call on the Banks to make payment under the performance guarantees. The reasons here should be read in conjunction with the reasons I gave ex tempore for making those orders. I am indebted to counsel for the applicant for the considerable assistance provided to the Court in their very detailed written submissions, in respect of what is a relatively complex matter. I have drawn heavily upon these in compiling these reasons. BACKGROUND In August 2004, Clough tendered for an engineering, procurement, installation and commissioning contract with ONGC for the development of certain oil/ gas fields in the Krishna Godavari basin off the coast of the state of Andhra Pradesh, India. By facsimile of 30 November 2004 from ONGC to Clough, received by Clough in Perth, ONGC notified Clough that it had been successful in being awarded the contract for execution of certain works. The facsimile stated that ‘This Notification of Award shall constitute binding Contract between CLOUGH and ONGC, and shall be subject to all terms and conditions of the Bidding Documents and other documents mentioned in Para 1.0 above.’ On receipt of the facsimile, ONGC and Clough had entered into a binding agreement. The parties had agreed to be bound immediately even though there would be a more formal agreement subsequently executed. By para 8.0 of the facsimile, Clough was required to sign a formal contract with ONGC. On 6 January 2005, a formal agreement was made between ONGC and Clough under which it was recited that ONGC had awarded to Clough the contract at a negotiated lump sum of US$215,351,156.33 by its facsimile of 30 November 2004 on the terms and conditions as agreed to by the parties as of the date of the facsimile and as outlined in the formal agreement. The formal agreement made on 6 January 2005 incorporated annexure A (General Conditions of Contract), annexure B (bidding documents, including the facsimile of 30 November 2004), annexure C (Contract price schedule and Rental Rate Schedule), annexure D (Construction schedule/ Project Key Dates), annexure E (Project Instructions) and annexure F (Milestone payment formula giving break-up of the negotiated lump sum prices). The overall project to which the contract relates involves three main elements, namely the construction of (i) an onshore gas processing plant, (ii) a shallow water field and (iii) a deep water field. Clough’s scope of work under the contract was essentially to:(a)design and build an onshore gas processing plant; (b)design, supply and install one wellhead platform for the shallow water field; (c)design and modify an existing wellhead platform in the shallow water field; (d)design, supply and install a sub sea production system in the deep water field; (e)supply and lay the pipeline network; and(f)undertake commissioning. The overall project also included certain drilling and well-completion work, both in the shallow water field and in the deep water field. This work was not part of Clough’s scope of work under the contract. ONGC was to carry out the drilling and well-completion work itself. This work had to be carried out before Clough could complete its offshore scope of work. ONGC has not effected well-completion. That has delayed the project’s completion. This is because the offshore work, namely the shallow water work and the deep water work, was contractually agreed to be done together with one mobilisation and de-mobilisation of the required spread, in the same campaign. The deep water work cannot be completed because it is directly dependent on well-completion. Moreover, the onshore work cannot be completed and the onshore plant commissioned, until there is a flow of hydrocarbons from the deep water wells. 95% of the hydrocarbons for the plant was to come from the deep water wells.

Evidence

Evidence Before The Court

Decision

Reasons for decision

GILMOUR J

Ratio Decidendi

Legal Principle Established

Established by: GILMOUR J