Australian Energy Regulator v Callide Power Trading Pty Ltd

Link copied
Case Copied 61 min read

FEDERAL COURT OF AUSTRALIA

Australian Energy Regulator v Callide Power Trading Pty Ltd [2025] FCA 32

File number: QUD 61 of 2024
Judgment of: DERRINGTON J
Date of judgment: 4 February 2025
Catchwords:

ENERGY AND RESOURCES – electricity – contraventions of r 4.15(a)(1) and cl 5.2.5(a)(1) of the National Electricity Rules (NER) – where respondent is a “Scheduled Generator” and “Registered Participant” under Ch 2 of the NER in respect of the Callide C Power Station – where respondent failed to ensure that Callide C4 generating unit met or exceeded the applicable performance standards – where respondent failed to ensure that Callide C4 generating unit was planned, designed and operated to comply with the performance standards – where contraventions resulted in catastrophic failure and destruction of Callide C4 generating unit – where failure had major impact on power system in Queensland and northern New South Wales

CONSUMER LAW – action commenced by regulator for declarations of contravention of NER and imposition of civil penalties pursuant to s 44AAG of the Competition and Consumer Act 2010 (Cth) – where contraventions admitted by respondent – determination of relief only – where parties submitted agreed proposed orders including penalty – orders made

Legislation:

Competition and Consumer Act 2010 (Cth)

Evidence Act 1995 (Cth)

Federal Court of Australia Act 1976 (Cth)

Electricity—National Scheme (Queensland) Act 1997 (Qld)

National Electricity (South Australia) Act 1996 (SA)

National Electricity (South Australia) Regulations (SA)

Cases cited:

Ainsworth v Criminal Justice Commission (1992) 175 CLR 564

Australian Building and Construction Commissioner v Pattinson (2022) 274 CLR 450

Australian Competition and Consumer Commission v ABB Transmission and Distribution Ltd [2001] ATPR ¶41-815

Australian Competition and Consumer Commission v Coles Supermarkets Australia Pty Ltd [2014] FCA 1405

Australian Competition and Consumer Commission v Coles Supermarkets Australia Pty Ltd (2015) 327 ALR 540

Australian Competition and Consumer Commission v Lactalis Australia Pty Ltd (No 2) [2023] FCA 839

Australian Competition and Consumer Commissioner v MSY Technology Pty Ltd (2012) 201 FCR 378

Australian Energy Regulator v AGL Loy Yang Marketing Pty Ltd [2023] FCA 1299

Australian Energy Regulator v Pacific Hydro Clements Gap Pty Ltd [2021] FCA 733

Australian Securities and Investments Commission v Axis International Management Pty Ltd (2009) 178 FCR 485

Australian Securities and Investments Commission v Colonial First State Investments Limited [2021] FCA 1268

Australian Securities and Investments Commission v General Commercial Group Pty Ltd [2023] FCA 24

Clean Energy Regulator v E Connect Solar & Electrical Pty Ltd [2023] FCA 1082

Commonwealth v Director, Fair Work Building Industry Inspectorate (2015) 258 CLR 482

Forster v Jododex Australia Pty Ltd (1972) 127 CLR 421

Minister for Industry, Tourism and Resources v Mobil Oil Australia Pty Ltd [2004] ATPR ¶41-993

NW Frozen Foods Pty Ltd v Australian Consumer and Competition Commission (1996) 71 FCR 285

Origin Energy Limited v Commissioner of Taxation (No 2) [2020] FCA 409

Schneider Electric (Australia) Pty Ltd v Australian Competition and Consumer Commission (2003) 127 FCR 170

Trade Practices Commission v Allied Mills Industries Pty…

CaseChat AU logo

Keep reading for free

Create a free CaseChat account to read Australian Energy Regulator v Callide Power Trading Pty Ltd and more:

  • Read every judgment in full
  • Ask AI and get answers linked to paragraphs
  • See how each paragraph was cited in later cases
  • Download judgments as PDF or Word
Continue with Google

One click creates your free account or signs you in.

By continuing you agree to the Terms and Privacy Policy.

Details
Case
[2025] FCA 32
Decision Date

CaseChat Overview and Summary

In the case of Australian Energy Regulator v Callide Power Trading Pty Ltd, the Australian Energy Regulator (AER) brought an action against Callide Power Trading Pty Ltd (CPT) for contraventions of rules 4.15(a)(1) and 5.2.5(a)(1) of the National Electricity Rules (NER). CPT, a Scheduled Generator and Registered Participant under the NER, was found to have failed to ensure that the Callide C4 generating unit met or exceeded the applicable performance standards and was planned, designed, and operated to comply with those standards. These failures resulted in the catastrophic failure and destruction of the Callide C4 generating unit, causing a major impact on the power system in Queensland and northern New South Wales. The AER sought declarations of contravention and the imposition of civil penalties under the Competition and Consumer Act 2010 (Cth). CPT admitted to the contraventions and the parties agreed on the proposed orders, including the penalty.

The court needed to determine whether CPT had contravened r 4.15(a)(1) and cl 5.2.5(a)(1) of the NER, and if so, whether the contraventions warranted the imposition of civil penalties. The primary focus was on whether CPT ensured the Callide C4 generating unit met the required performance standards, which was a critical aspect of both rules. The court had to assess whether the failure to meet these standards resulted in the catastrophic failure of the generating unit and the subsequent major impact on the power system.

The court found that CPT did contravene r 4.15(a)(1) and cl 5.2.5(a)(1) of the NER by failing to ensure that the Callide C4 generating unit met or exceeded the applicable performance standards. The court accepted that the contraventions were not deliberate and that CPT did not benefit from them. Given the significant impact of the failure, the court imposed a civil penalty of $9,000,000 and ordered CPT to pay the AER's costs of $150,000. The court also granted liberty to the parties to apply for further orders if necessary.

The final orders of the court included the declaration of contraventions, the imposition of a civil penalty of $9,000,000, and the payment of costs by CPT. The court's decision underscored the importance of compliance with performance standards in the electricity sector and the significant consequences of non-compliance.

Orders

Orders of the court

3. Pursuant to s 44AAG(2)(a) of the Competition and Consumer Act 2010 (Cth), within 28 days of the making of this Order, the respondent pay to the Commonwealth of Australia a civil penalty in the amount of $9,000,000 in respect of the respondent’s contraventions of r 4.15(a)(1) and cl 5.2.5(a)(1) of the NER.

4. Pursuant to s 43 of the Federal Court of Australia Act 1976 (Cth), within 28 days of the making of this Order, the respondent pay the applicant’s costs of, and incidental to, this proceeding, agreed in the amount of $150,000.

5. There be liberty to the parties to apply.

Note: Entry of orders is dealt with in Rule 39.32 of the Federal Court Rules 2011.

Background

Background to the litigation

There is clearly some significant overlap between each of r 4.15(a)(1) and cl 5.2.5(a)(1). In each case, the critical issue is whether the relevant performance standard has been complied with. Depending on the circumstances, it may be that one or all of the separate obligations under r 4.15(a)(1) and cl 5.2.5(a)(1) are breached in connection with any given event.THE AGREED FACTS The following facts are taken from the joint statement of agreed facts and admissions. The ownership and management of the Callide C Power Station As mentioned above, CPT does not own or operate the Callide C Power Station. At all relevant times, both:(a)the shares in CPT; and(b)the Callide C Power Station itself,were owned 50-50 by Callide Energy Pty Ltd (CEPL) and IG Power (Callide) Ltd (administrators appointed) (IGPC) under a joint venture structure (the Callide Joint Venture). The ultimate owner of CEPL is CSEL, and the ultimate holding company of IGPC is OzGen (UK) Limited. The Callide Joint Venture was established under a Joint Venture Agreement dated 11 May 1998 (as subsequently amended) between CEPL and IGPC as “Participants” on the one hand, and Callide Power Management Pty Ltd (CPM) as the “Manager” on the other. Under a “Management Agreement” and the “Shareholder Agreement” in respect of CPM, the Callide Joint Venture appointed CPM as the manager of the Callide C4 generating unit. CPM, as agent for CEPL and IGPC, separately appointed CSEL to act as the operator of Callide C4 under an Operation and Maintenance Agreement dated 11 May 1998 (as subsequently amended) and a Station Services Agreement dated 11 May 1998 (as subsequently amended). As operator, CSEL is responsible for all necessary operation and maintenance of Callide C4. Pursuant to two separate Market Trader Agreements dated 11 May 1998 (both as subsequently amended), which CPT executed respectively with IGPC and CEPL, CPT is responsible for trading electricity produced by the Callide C4 generating unit into the NEM. Under a Deed of Service dated 17 January 2018, CSEL provides certain services to assist CPT to perform its obligations under the Market Trader Agreements and the NER, and to ensure services are provided in compliance with all aspects of the applicable performance standards and as required by the NER. The services provided by CSEL under the Deed of Service include, inter alia:(a)developing, maintaining and implementing a Generator performance standards compliance program (as contemplated by r 4.15(b) of the NER);(b)ensuring that the plant was operated to comply with the applicable performance standards;(c)monitoring the plant and performing relevant testing, and taking action where possible to remedy any shortfalls; and(d)notifying CPT of any breaches of the applicable performance standards and the program to remedy those breaches.CPT’s obligations under the NER At all relevant times CPT was registered as a Scheduled Generator and a Registered Participant under Ch 2 of the NER. Further, pursuant to cl 2.9.3 of the NER, it was an intermediary registered by AEMO as a Generator on behalf of the parties to the Callide Joint Venture — that is, CEPL and IGPC. The parties submitted that CPT was therefore regulated by the NER in two respects: as a Generator and as a Registered Participant.

Decision

Reasons for decision

Issues
1. Whether CPT contravened r 4.15(a)(1) of the NER by failing to ensure that the Callide C4 generating unit met or exceeded cl 3.6 of the applicable performance standards dated 29 August 2008.
2. Whether CPT contravened cl 5.2.5(a)(1) of the NER by failing to ensure that the Callide C4 generating unit was planned, designed, and operated to comply with the performance standards.

Held
1. The court held that CPT contravened r 4.15(a)(1) of the NER by failing to ensure that the Callide C4 generating unit met or exceeded cl 3.6 of the applicable performance standards dated 29 August 2008.
2. The court held that CPT contravened cl 5.2.5(a)(1) of the NER by failing to ensure that the Callide C4 generating unit was planned, designed, and operated to comply with the performance standards.

Ratio Decidendi

Legal Principle Established

Before turning to the relief sought by the AER, it is important to note that CPT denies, and the AER no longer presses, the balance of allegations made in its concise statement. For the avoidance of doubt, this includes the allegation that CPT failed to comply with cl 3.7 of the Callide Standards concerning asynchronous operation. Further, it was agreed that the contraventions were not deliberate, and that CPT did not obtain any benefit from them. THE DECLARATIONS SOUGHT The AER seeks two declarations, each relating to a contravention of a particular clause of the NER. CPT agrees to the making of the declarations in the terms proposed. The first provides as follows:1.[T]he respondent contravened r 4.15(a)(1) of the National Electricity Rules (NER) by failing to ensure that the Callide C4 generating unit met or exceeded cl 3.6 of the applicable performance standards dated 29 August 2008 (performance standards), in that, on 25 May 2021:(a)the protection systems for the Callide C4 generating unit (Callide C4 protection systems) included:(i) the 19.5kV and 6.6kV plant protection system;(ii)the X generator transformer differential protection system; and(iii) the Y overall differential protection system;(b)the operator of Callide C4 undertook a planned battery charger replacement procedure at Callide C Power Station, during the course of which:(i)it continued to operate the generating unit throughout;(ii) it disconnected the C4 battery charger and battery; and(iii)the generating unit obtained its DC power supply from the Station battery charger and battery;(c)at approximately 13:33, in the course of that battery charger replacement procedure:(i)the Callide C4 battery charger was reconnected;(ii)the Station battery charger and battery were disconnected;(iii)the new Callide C4 battery charger failed to respond quickly enough to maintain the required DC voltage as intended; and(iv)where the C4 battery had not yet been reconnected, the DC power supply to the Callide C4 protection systems went out of service; (d) subsequently:(i)immediately after the events referred to in (c), an element within the protection zones of the Callide C4 protection systems, namely the generating unit, experienced faults when it (among other things) (1) lost excitation; and (2) experienced a reverse power flow, where the generating unit began motoring asynchronously instead of generating; and(ii)at approximately 14:06, among other things, at Callide C4 there was (1) a two-phase short circuit fault at the generating unit; (2) a three-phase short circuit fault at the generator stator; and (3) a single phase-to-ground short circuit fault, followed by a double phase-to-ground short circuit fault, both within the 275kV system, each being elements within the protection zones of the Callide C4 protection systems;(e)because the Callide C4 battery was disconnected, the Callide C4 protection systems, a purpose of which was to operate in respect of such faults:(i)lacked an alternative (redundant) DC power supply (DC power supply redundancy); and(ii)did not have sufficient redundancy to ensure that the faulted elements were disconnected from the power system within the applicable fault clearance times, as necessary to prevent plant damage and meet stability requirements; and(f)in the circumstances, the Callide C4 protection systems failed to disconnect the faulted elements from the power system. (Emphasis in original).