FEDERAL COURT OF AUSTRALIA
Australian Energy Regulator v Callide Power Trading Pty Ltd [2025] FCA 32
File number: QUD 61 of 2024 Judgment of: DERRINGTON J Date of judgment: 4 February 2025 Catchwords: ENERGY AND RESOURCES – electricity – contraventions of r 4.15(a)(1) and cl 5.2.5(a)(1) of the National Electricity Rules (NER) – where respondent is a “Scheduled Generator” and “Registered Participant” under Ch 2 of the NER in respect of the Callide C Power Station – where respondent failed to ensure that Callide C4 generating unit met or exceeded the applicable performance standards – where respondent failed to ensure that Callide C4 generating unit was planned, designed and operated to comply with the performance standards – where contraventions resulted in catastrophic failure and destruction of Callide C4 generating unit – where failure had major impact on power system in Queensland and northern New South Wales
CONSUMER LAW – action commenced by regulator for declarations of contravention of NER and imposition of civil penalties pursuant to s 44AAG of the Competition and Consumer Act 2010 (Cth) – where contraventions admitted by respondent – determination of relief only – where parties submitted agreed proposed orders including penalty – orders made
Legislation: Competition and Consumer Act 2010 (Cth)
Evidence Act 1995 (Cth)
Federal Court of Australia Act 1976 (Cth)
Electricity—National Scheme (Queensland) Act 1997 (Qld)
National Electricity (South Australia) Act 1996 (SA)
National Electricity (South Australia) Regulations (SA)
Cases cited: Ainsworth v Criminal Justice Commission (1992) 175 CLR 564
Australian Building and Construction Commissioner v Pattinson (2022) 274 CLR 450
Australian Competition and Consumer Commission v ABB Transmission and Distribution Ltd [2001] ATPR ¶41-815
Australian Competition and Consumer Commission v Lactalis Australia Pty Ltd (No 2) [2023] FCA 839
Australian Competition and Consumer Commissioner v MSY Technology Pty Ltd (2012) 201 FCR 378
Australian Energy Regulator v AGL Loy Yang Marketing Pty Ltd [2023] FCA 1299
Australian Energy Regulator v Pacific Hydro Clements Gap Pty Ltd [2021] FCA 733
Australian Securities and Investments Commission v General Commercial Group Pty Ltd [2023] FCA 24
Clean Energy Regulator v E Connect Solar & Electrical Pty Ltd [2023] FCA 1082
Commonwealth v Director, Fair Work Building Industry Inspectorate (2015) 258 CLR 482
Forster v Jododex Australia Pty Ltd (1972) 127 CLR 421
Minister for Industry, Tourism and Resources v Mobil Oil Australia Pty Ltd [2004] ATPR ¶41-993
NW Frozen Foods Pty Ltd v Australian Consumer and Competition Commission (1996) 71 FCR 285
Origin Energy Limited v Commissioner of Taxation (No 2) [2020] FCA 409
Keep reading for free
Create a free CaseChat account to read Australian Energy Regulator v Callide Power Trading Pty Ltd and more:
- Read every judgment in full
- Ask AI and get answers linked to paragraphs
- See how each paragraph was cited in later cases
- Download judgments as PDF or Word
One click creates your free account or signs you in.
By continuing you agree to the Terms and Privacy Policy.
- Case
- [2025] FCA 32
- Decision Date
CaseChat Overview and Summary
The court needed to determine whether CPT had contravened r 4.15(a)(1) and cl 5.2.5(a)(1) of the NER, and if so, whether the contraventions warranted the imposition of civil penalties. The primary focus was on whether CPT ensured the Callide C4 generating unit met the required performance standards, which was a critical aspect of both rules. The court had to assess whether the failure to meet these standards resulted in the catastrophic failure of the generating unit and the subsequent major impact on the power system.
The court found that CPT did contravene r 4.15(a)(1) and cl 5.2.5(a)(1) of the NER by failing to ensure that the Callide C4 generating unit met or exceeded the applicable performance standards. The court accepted that the contraventions were not deliberate and that CPT did not benefit from them. Given the significant impact of the failure, the court imposed a civil penalty of $9,000,000 and ordered CPT to pay the AER's costs of $150,000. The court also granted liberty to the parties to apply for further orders if necessary.
The final orders of the court included the declaration of contraventions, the imposition of a civil penalty of $9,000,000, and the payment of costs by CPT. The court's decision underscored the importance of compliance with performance standards in the electricity sector and the significant consequences of non-compliance.
Orders
Orders of the court
3. Pursuant to s 44AAG(2)(a) of the Competition and Consumer Act 2010 (Cth), within 28 days of the making of this Order, the respondent pay to the Commonwealth of Australia a civil penalty in the amount of $9,000,000 in respect of the respondent’s contraventions of r 4.15(a)(1) and cl 5.2.5(a)(1) of the NER.
4. Pursuant to s 43 of the Federal Court of Australia Act 1976 (Cth), within 28 days of the making of this Order, the respondent pay the applicant’s costs of, and incidental to, this proceeding, agreed in the amount of $150,000.
5. There be liberty to the parties to apply.
Note: Entry of orders is dealt with in Rule 39.32 of the Federal Court Rules 2011.
Background
Background to the litigation
Decision
Reasons for decision
1. Whether CPT contravened r 4.15(a)(1) of the NER by failing to ensure that the Callide C4 generating unit met or exceeded cl 3.6 of the applicable performance standards dated 29 August 2008.
2. Whether CPT contravened cl 5.2.5(a)(1) of the NER by failing to ensure that the Callide C4 generating unit was planned, designed, and operated to comply with the performance standards.
Held
1. The court held that CPT contravened r 4.15(a)(1) of the NER by failing to ensure that the Callide C4 generating unit met or exceeded cl 3.6 of the applicable performance standards dated 29 August 2008.
2. The court held that CPT contravened cl 5.2.5(a)(1) of the NER by failing to ensure that the Callide C4 generating unit was planned, designed, and operated to comply with the performance standards.
Ratio Decidendi
Legal Principle Established
Before turning to the relief sought by the AER, it is important to note that CPT denies, and the AER no longer presses, the balance of allegations made in its concise statement. For the avoidance of doubt, this includes the allegation that CPT failed to comply with cl 3.7 of the Callide Standards concerning asynchronous operation. Further, it was agreed that the contraventions were not deliberate, and that CPT did not obtain any benefit from them. THE DECLARATIONS SOUGHT The AER seeks two declarations, each relating to a contravention of a particular clause of the NER. CPT agrees to the making of the declarations in the terms proposed. The first provides as follows:1.[T]he respondent contravened r 4.15(a)(1) of the National Electricity Rules (NER) by failing to ensure that the Callide C4 generating unit met or exceeded cl 3.6 of the applicable performance standards dated 29 August 2008 (performance standards), in that, on 25 May 2021:(a)the protection systems for the Callide C4 generating unit (Callide C4 protection systems) included:(i) the 19.5kV and 6.6kV plant protection system;(ii)the X generator transformer differential protection system; and(iii) the Y overall differential protection system;(b)the operator of Callide C4 undertook a planned battery charger replacement procedure at Callide C Power Station, during the course of which:(i)it continued to operate the generating unit throughout;(ii) it disconnected the C4 battery charger and battery; and(iii)the generating unit obtained its DC power supply from the Station battery charger and battery;(c)at approximately 13:33, in the course of that battery charger replacement procedure:(i)the Callide C4 battery charger was reconnected;(ii)the Station battery charger and battery were disconnected;(iii)the new Callide C4 battery charger failed to respond quickly enough to maintain the required DC voltage as intended; and(iv)where the C4 battery had not yet been reconnected, the DC power supply to the Callide C4 protection systems went out of service; (d) subsequently:(i)immediately after the events referred to in (c), an element within the protection zones of the Callide C4 protection systems, namely the generating unit, experienced faults when it (among other things) (1) lost excitation; and (2) experienced a reverse power flow, where the generating unit began motoring asynchronously instead of generating; and(ii)at approximately 14:06, among other things, at Callide C4 there was (1) a two-phase short circuit fault at the generating unit; (2) a three-phase short circuit fault at the generator stator; and (3) a single phase-to-ground short circuit fault, followed by a double phase-to-ground short circuit fault, both within the 275kV system, each being elements within the protection zones of the Callide C4 protection systems;(e)because the Callide C4 battery was disconnected, the Callide C4 protection systems, a purpose of which was to operate in respect of such faults:(i)lacked an alternative (redundant) DC power supply (DC power supply redundancy); and(ii)did not have sufficient redundancy to ensure that the faulted elements were disconnected from the power system within the applicable fault clearance times, as necessary to prevent plant damage and meet stability requirements; and(f)in the circumstances, the Callide C4 protection systems failed to disconnect the faulted elements from the power system. (Emphasis in original).