Royal and Sun Alliance Insurance Plc v DMS Maritime Pty Limited

Link copied
Case Copied 46 min read

SUPREME COURT OF QUEENSLAND

CITATION:

Royal and Sun Alliance Insurance Plc v DMS Maritime Pty Limited [2019] QCA 264

PARTIES:

ROYAL AND SUN ALLIANCE INSURANCE PLC
ARBN 153 863 006
(appellant)
v
DMS MARITIME PTY LIMITED

ACN 078 359 065
(respondent)

FILE NO/S:

Appeal No 530 of 2019
SC No 6807 of 2016

DIVISION:

Court of Appeal

PROCEEDING:

General Civil Appeal

ORIGINATING COURT:


Supreme Court at Brisbane – [2018] QSC 303 (Bond J)

DELIVERED ON:

22 November 2019

DELIVERED AT:

Brisbane

HEARING DATE:

13 June 2019

JUDGES:

Fraser and McMurdo JJA and Boddice J

ORDERS:

The appeal be dismissed, with costs.

CATCHWORDS:

CONTRACTS – GENERAL CONTRACTUAL PRINCIPLES – CONSTRUCTION AND INTERPRETATION OF CONTRACTS – INTERPRETATION OF MISCELLANEOUS CONTRACTS AND OTHER MATTERS – where the respondent and the Commonwealth entered into a contract for the design, manufacture and supply of Armidale Class Patrol Boats – where one such boat was in dry dock, in the respondent’s possession, whilst the respondent undertook routine scheduled repairs and maintenance, in accordance with its contract with the Commonwealth – where an employee of one of the respondent’s subcontractors caused a fire destroying the vessel completely – where the primary judge found the appellant was obliged to indemnify the respondent, under contracts of insurance, in respect of a sum the respondent had become liable to pay to the Commonwealth under a deed of settlement – where declaratory and other orders were made in accordance with that finding – where the appellant appeals those orders – whether the primary judge erred in reaching the proper construction of the contract between the respondent and the Commonwealth, the proper construction of the deed of settlement between the respondent and the Commonwealth, the proper construction of the insurance contract between the appellant and the respondent and the quantification of any loss to be indemnified by the appellant

British Westinghouse Electric and Manufacturing Company Limited v Underground Electric Railways Company of London Limited [1912] AC 673, cited
Delta Pty Ltd v Mechanical and Construction Insurance Pty Ltd[2019] QCA 62, cited
Distillers Co Bio-Chemicals (Aust) Pty Ltd v Ajax Insurance Co Ltd (1974) 130 CLR 1; [1974] HCA 3, cited
Drayton v Martin (1996) 67 FCR 1; (1996) 137 ALR 145; [1996] FCA 1504, cited
Hurlock v Council of the Shire of Johnstone[2002] QCA 256, cited
Mount Bruce Mining Pty Ltd v Wright Prospecting Pty Ltd (2015) 256 CLR 104; [2015] HCA 37, cited
Post Office v Norwich Union Fire Insurance Society Ltd [1967] 2 QB 363, cited
Royal Insurance Fire & General (NZ) Limited v Mainfreight Transport Limited (1993) 7 ANZ Insurance Cases 61-172, cited
Unity Insurance Brokers Pty Ltd v Rocco Pezzano Pty Ltd (1998) 192 CLR 603; [1998] HCA 38, cited
Vero Insurance Ltd v Baycorp Advantage Ltd (2005) 13 ANZ Insurance Cases 61-630; [2004] NSWCA 390, cited
Victoria v Tatts Group Ltd (2016) 90 ALJR 392; (2016) 328 ALR 564;

CaseChat AU logo

Keep reading for free

Create a free CaseChat account to read Royal and Sun Alliance Insurance Plc v DMS Maritime Pty Limi... and more:

  • Read every judgment in full
  • Ask AI and get answers linked to paragraphs
  • See how each paragraph was cited in later cases
  • Download judgments as PDF or Word
Continue with Google

One click creates your free account or signs you in.

By continuing you agree to the Terms and Privacy Policy.

Details
Case
[2019] QCA 264
Decision Date

CaseChat Overview and Summary

In the case of Royal and Sun Alliance Insurance Plc v DMS Maritime Pty Limited, the appeal by the appellant, Royal and Sun Alliance Insurance Plc, was directed at the orders made by the primary judge, which found the appellant was obliged to indemnify the respondent, DMS Maritime Pty Limited, in respect of a sum the respondent had become liable to pay to the Commonwealth under a deed of settlement. The central dispute arose from a contract between the respondent and the Commonwealth for the design, manufacture, and supply of Armidale Class Patrol Boats. During routine repairs and maintenance carried out by the respondent, a fire caused by an employee of a subcontractor destroyed one of the vessels, the HMAS Bundaberg. The primary judge's ruling that the appellant should indemnify the respondent for the loss was challenged by the appellant on the grounds of misinterpretation of the contracts between the respondent and the Commonwealth, the deed of settlement, and the insurance contract between the appellant and the respondent.

The court had to address whether the primary judge erred in his interpretation of these contracts and the quantification of any loss to be indemnified. The court noted that the construction of contractual terms should not be done in isolation but must consider the entire context and purpose of the contract. The court upheld the primary judge's interpretation that the contract required the respondent to either replace the destroyed vessel or make equivalent recompense to the Commonwealth. The court rejected the appellant's argument that the Commonwealth's damages should be calculated based on the cost of purchasing a replacement vessel, emphasizing that the contract's context and purpose supported the primary judge's finding.

The appeal was ultimately dismissed by the court, which found no grounds to interfere with the primary judge's reasons or orders. The court ordered that the appeal be dismissed with costs, adhering to the principle that commercial contracts should be construed to avoid making commercial nonsense or working commercial inconvenience.

Orders

Orders of the court

The appeal be dismissed, with costs.

Background

Background to the litigation

The appellant appeals those orders. At issue is the proper construction of a contract entered into between the respondent and the Commonwealth, the proper construction of the deed of settlement entered into between the respondent and the Commonwealth, the proper construction of the insurance contract entered into between the appellant and the respondent and the quantification of any loss to be indemnified by the appellant.Background In 2003, the respondent and the Commonwealth entered into a contract for the design, manufacture and supply of Armidale class patrol boats. Pursuant to that contract, the respondent designed, manufactured and supplied a number of Armidale Class Patrol Boats over several years. One such boat was the HMAS Bundaberg. On 11 August 2014, the HMAS Bundaberg was in dry dock, in the possession of the respondent, whilst the respondent undertook routine scheduled repairs and maintenance, in accordance with its contract with the Commonwealth. Whilst doing so, an employee of one of the respondent’s subcontractors caused a fire which spread quickly through the vessel, destroying it completely. It was common ground at trial that the circumstance of that loss meant the respondent became liable to indemnify the Commonwealth against “any loss or damage” to the vessel pursuant to clause 6.8.1.1 of its contract and, further, that the respondent became liable to the Commonwealth to “promptly replace or otherwise make good any loss of” the vessel pursuant to clause 8.3.1 of that contract. The calculation of that loss required consideration of the terms of the contract entered into between the respondent and the Commonwealth. One of the respondent’s obligations under that contract was to provide integrated support services in respect of all vessels supplied pursuant to the contract, for the period of the contract. Those support services include ensuring the vessels were available for specified service hours per annum. At the time of the destruction of the HMAS Bundaberg, the respondent had valid, current policies of insurance, insuring the respondent for its contractual liability to the Commonwealth under the contract. Relevantly, for present purposes, by those contracts the appellant (and other insurers) agreed to indemnify the respondent “for all sums which [the respondent] shall become liable to pay by reason of the legal liability of [the respondent] as shiprepairers for … (i) loss of or damage to any vessel or craft which is in the care, custody or control of [the respondent] for the purpose of being worked upon …”. On 10 June 2016, the Commonwealth and the respondent entered into a deed of settlement in respect of the Commonwealth’s claimed losses under the contract as a consequence of the destruction of the HMAS Bundaberg. The terms of that settlement deed provided for the respondent to pay the Commonwealth a settlement sum of $31.5 million. That figure was reached on the basis that the loss of the HMAS Bundaberg necessitated its replacement by the Commonwealth purchasing a new Cape Class Patrol Boat.Trial

Evidence

Evidence Before The Court

Decision

Reasons for decision

On the basis of that concession, it is unnecessary to consider grounds 7, 12, 13 and 14. They, as a consequence of the conclusions in respect of those other grounds, must fail.Conclusions The appellant has failed to establish any ground of appeal warranting interference with the reasons or orders of the primary judge. It is therefore unnecessary to consider the Notice of Contention.Orders I would order that the appeal be dismissed, with costs.

Ratio Decidendi

Legal Principle Established

The appellant submits that basis for the judgment ought to be rejected as the notice of contention depends upon, as a starting point, acceptance of the erroneous proposition that the Commonwealth’s damages fell to be calculated by reference to the cost of purchase of the replacement vessel.ConsiderationContract Construction of contractual terms is not to be undertaken in isolation. In Victoria v Tatts Group Limited[24] the plurality approved the enunciation of these relevant principles by French CJ, Nettle and Gordon JJ in Mount Bruce Mining Pty Ltd v Wright Prospecting Pty Ltd:“[46] The rights and liabilities of parties under a provision of a contract are determined objectively, by reference to its text, context (the entire text of the contract as well as any contract, document or statutory provision referred to in the text of the contract) and purpose.[47]In determining the meaning of the terms of a commercial contract, it is necessary to ask what a reasonable businessperson would have understood those terms to mean. That enquiry will require consideration of the language used by the parties in the contract, the circumstances addressed by the contract and the commercial purpose or objects to be secured by the contract.…[51]Other principles are relevant in the construction of commercial contracts. Unless a contrary intention is indicated in the contract, a court is entitled to approach the task of giving a commercial contract an interpretation on the assumption “that the parties … intended to produce a commercial result”. Put another way, a commercial contract should be construed so as to avoid it “making commercial nonsense or working commercial inconvenience”. (citations omitted)”[25][24](2016) 328 ALR 564.[25](2015) 256 CLR 104 at [46] – [51]. These principles render significant the observations of the primary judge as to the context within which clause 8.3.1 appeared and as to its likely purpose.[26] Those observations included the fact that the contract was not only for the design, manufacture, production and delivery of patrol boats to be owned by the Commonwealth and the provision of integrated support services over a contractual service life of at least 15 years, but a requirement that those patrol boats have a capability of performing specified functional and operational requirements for an average service life in excess of 20 years from the date they were commissioned. Further, at the end of the contractual service life it was contemplated that the Commonwealth would still own the patrol boats.[26]ARB 27 at [74]. As the primary judge correctly observed, the addition of the word “otherwise” suggests a link between the concepts of “replace” and “make good”. That link, in the context of a contractual requirement for a lengthy average service life with the Commonwealth to retain ownership of the patrol boats, amptly supported the primary judge’s conclusion that the proper construction of the obligation in clause 8.3.1 was, in the event of destruction of one of the relevant patrol vessels, a requirement that the respondent either provide a substitute equivalent vessel or in some other equivalent way make recompense to the Commonwealth for that loss.