SUPREME COURT OF QUEENSLAND
CITATION:
Royal and Sun Alliance Insurance Plc v DMS Maritime Pty Limited [2019] QCA 264
PARTIES:
ROYAL AND SUN ALLIANCE INSURANCE PLC
ARBN 153 863 006
(appellant)
v
DMS MARITIME PTY LIMITED
ACN 078 359 065
(respondent)FILE NO/S:
Appeal No 530 of 2019
SC No 6807 of 2016DIVISION:
Court of Appeal
PROCEEDING:
General Civil Appeal
ORIGINATING COURT:
Supreme Court at Brisbane – [2018] QSC 303 (Bond J)DELIVERED ON:
22 November 2019
DELIVERED AT:
Brisbane
HEARING DATE:
13 June 2019
JUDGES:
Fraser and McMurdo JJA and Boddice J
ORDERS:
The appeal be dismissed, with costs.
CATCHWORDS:
CONTRACTS – GENERAL CONTRACTUAL PRINCIPLES – CONSTRUCTION AND INTERPRETATION OF CONTRACTS – INTERPRETATION OF MISCELLANEOUS CONTRACTS AND OTHER MATTERS – where the respondent and the Commonwealth entered into a contract for the design, manufacture and supply of Armidale Class Patrol Boats – where one such boat was in dry dock, in the respondent’s possession, whilst the respondent undertook routine scheduled repairs and maintenance, in accordance with its contract with the Commonwealth – where an employee of one of the respondent’s subcontractors caused a fire destroying the vessel completely – where the primary judge found the appellant was obliged to indemnify the respondent, under contracts of insurance, in respect of a sum the respondent had become liable to pay to the Commonwealth under a deed of settlement – where declaratory and other orders were made in accordance with that finding – where the appellant appeals those orders – whether the primary judge erred in reaching the proper construction of the contract between the respondent and the Commonwealth, the proper construction of the deed of settlement between the respondent and the Commonwealth, the proper construction of the insurance contract between the appellant and the respondent and the quantification of any loss to be indemnified by the appellant
British Westinghouse Electric and Manufacturing Company Limited v Underground Electric Railways Company of London Limited [1912] AC 673, cited
Delta Pty Ltd v Mechanical and Construction Insurance Pty Ltd[2019] QCA 62, cited
Distillers Co Bio-Chemicals (Aust) Pty Ltd v Ajax Insurance Co Ltd (1974) 130 CLR 1; [1974] HCA 3, cited
Drayton v Martin (1996) 67 FCR 1; (1996) 137 ALR 145; [1996] FCA 1504, cited
Hurlock v Council of the Shire of Johnstone[2002] QCA 256, cited
Mount Bruce Mining Pty Ltd v Wright Prospecting Pty Ltd (2015) 256 CLR 104; [2015] HCA 37, cited
Post Office v Norwich Union Fire Insurance Society Ltd [1967] 2 QB 363, cited
Royal Insurance Fire & General (NZ) Limited v Mainfreight Transport Limited (1993) 7 ANZ Insurance Cases 61-172, cited
Unity Insurance Brokers Pty Ltd v Rocco Pezzano Pty Ltd (1998) 192 CLR 603; [1998] HCA 38, cited
Vero Insurance Ltd v Baycorp Advantage Ltd (2005) 13 ANZ Insurance Cases 61-630; [2004] NSWCA 390, cited
Victoria v Tatts Group Ltd (2016) 90 ALJR 392; (2016) 328 ALR 564;
Keep reading for free
Create a free CaseChat account to read Royal and Sun Alliance Insurance Plc v DMS Maritime Pty Limi... and more:
- Read every judgment in full
- Ask AI and get answers linked to paragraphs
- See how each paragraph was cited in later cases
- Download judgments as PDF or Word
One click creates your free account or signs you in.
By continuing you agree to the Terms and Privacy Policy.
- Case
- [2019] QCA 264
- Decision Date
CaseChat Overview and Summary
The court had to address whether the primary judge erred in his interpretation of these contracts and the quantification of any loss to be indemnified. The court noted that the construction of contractual terms should not be done in isolation but must consider the entire context and purpose of the contract. The court upheld the primary judge's interpretation that the contract required the respondent to either replace the destroyed vessel or make equivalent recompense to the Commonwealth. The court rejected the appellant's argument that the Commonwealth's damages should be calculated based on the cost of purchasing a replacement vessel, emphasizing that the contract's context and purpose supported the primary judge's finding.
The appeal was ultimately dismissed by the court, which found no grounds to interfere with the primary judge's reasons or orders. The court ordered that the appeal be dismissed with costs, adhering to the principle that commercial contracts should be construed to avoid making commercial nonsense or working commercial inconvenience.
Orders
Orders of the court
The appeal be dismissed, with costs.
Background
Background to the litigation
Evidence
Evidence Before The Court
Decision
Reasons for decision
Ratio Decidendi
Legal Principle Established
The appellant submits that basis for the judgment ought to be rejected as the notice of contention depends upon, as a starting point, acceptance of the erroneous proposition that the Commonwealth’s damages fell to be calculated by reference to the cost of purchase of the replacement vessel.ConsiderationContract Construction of contractual terms is not to be undertaken in isolation. In Victoria v Tatts Group Limited[24] the plurality approved the enunciation of these relevant principles by French CJ, Nettle and Gordon JJ in Mount Bruce Mining Pty Ltd v Wright Prospecting Pty Ltd:“[46] The rights and liabilities of parties under a provision of a contract are determined objectively, by reference to its text, context (the entire text of the contract as well as any contract, document or statutory provision referred to in the text of the contract) and purpose.[47]In determining the meaning of the terms of a commercial contract, it is necessary to ask what a reasonable businessperson would have understood those terms to mean. That enquiry will require consideration of the language used by the parties in the contract, the circumstances addressed by the contract and the commercial purpose or objects to be secured by the contract.…[51]Other principles are relevant in the construction of commercial contracts. Unless a contrary intention is indicated in the contract, a court is entitled to approach the task of giving a commercial contract an interpretation on the assumption “that the parties … intended to produce a commercial result”. Put another way, a commercial contract should be construed so as to avoid it “making commercial nonsense or working commercial inconvenience”. (citations omitted)”[25][24](2016) 328 ALR 564.[25](2015) 256 CLR 104 at [46] – [51]. These principles render significant the observations of the primary judge as to the context within which clause 8.3.1 appeared and as to its likely purpose.[26] Those observations included the fact that the contract was not only for the design, manufacture, production and delivery of patrol boats to be owned by the Commonwealth and the provision of integrated support services over a contractual service life of at least 15 years, but a requirement that those patrol boats have a capability of performing specified functional and operational requirements for an average service life in excess of 20 years from the date they were commissioned. Further, at the end of the contractual service life it was contemplated that the Commonwealth would still own the patrol boats.[26]ARB 27 at [74]. As the primary judge correctly observed, the addition of the word “otherwise” suggests a link between the concepts of “replace” and “make good”. That link, in the context of a contractual requirement for a lengthy average service life with the Commonwealth to retain ownership of the patrol boats, amptly supported the primary judge’s conclusion that the proper construction of the obligation in clause 8.3.1 was, in the event of destruction of one of the relevant patrol vessels, a requirement that the respondent either provide a substitute equivalent vessel or in some other equivalent way make recompense to the Commonwealth for that loss.