Electricity Networks Corporation v Herridge Parties

Link copied
Case Copied 43 min read

HIGH COURT OF AUSTRALIA

KIEFEL CJ,
GAGELER, GORDON, EDELMAN AND STEWARD JJ

ELECTRICITY NETWORKS CORPORATION

T/AS WESTERN POWER  APPELLANT

AND

HERRIDGE PARTIES & ORS  RESPONDENTS

Electricity Networks Corporation v Herridge Parties

[2022] HCA 37

Date of Hearing: 6, 7 & 8 September 2022

Date of Judgment: 7 December 2022

P5/2022

ORDER

1. Application for special leave to cross-appeal filed by the First Respondents with respect to grounds 2 and 3 of the proposed grounds of cross-appeal refused with costs.

2.Application for special leave to cross-appeal filed by the Second Respondents refused with costs.

3. Appeal dismissed.

4. The Appellant pay the costs of the First, Second, Fourth and Fifth Respondents in this Court.

On appeal from the Supreme Court of Western Australia

Representation

B Dharmananda SC with M J Sims and B K Lim for the appellant (instructed by DLA Piper Australia)

P J Dunning QC with T C Smyth for the first respondents (instructed by Slater & Gordon Lawyers)

C M Harris QC with P Mendelow for the second respondents (instructed by Hall & Wilcox)

Submitting appearance for the third respondents

J C Giles SC with E Bathurst for the fourth respondent (instructed by MinterEllison)

J T Gleeson SC with K I H Lindeman for the fifth respondent (instructed by Wotton + Kearney)

Notice:  This copy of the Court's Reasons for Judgment is subject to formal revision prior to publication in the Commonwealth Law Reports.

  1. KIEFEL CJ, GAGELER, GORDON, EDELMAN AND STEWARD JJ.   This appeal arises from claims made by a large number of plaintiffs[1] for loss and damage resulting from a bushfire in Parkerville, Western Australia. The fire started on 12 January 2014 when a jarrah pole on the land of the fourth respondent ("Mrs Campbell"), to which the electrical cable and other apparatus of the appellant, Electricity Networks Corporation (which traded as Western Power) ("Western Power"), were attached, fell to the ground causing electrical arcing and igniting dry vegetation around the base of the pole. The pole is referred to as a "point of attachment pole" or "PA pole", being a pole at which an electricity distribution system is attached to the consumer mains.

    [1]The first to third respondents to this appeal, respectively referred to as the "Herridge Parties", the "IAG/Allianz Parties" and the "RAC Parties". The RAC Parties filed a submitting appearance in this Court.

  2. The PA pole that fell was installed on Mrs Campbell's property by her late husband and was in place since at least 1983. It was made of jarrah and was 5.5m tall above the ground and embedded 1.1m into the ground. At the time of the fire, it was approximately 21cm in diameter at ground level tapering to 16cm in diameter at the tip. The PA pole failed below the ground line due to fungal decay and damage by termites.

  3. Western Power operated the electricity distribution system[2] called the South West interconnected system ("SWIS"), which was used to deliver electricity to Mrs Campbell's property. The link by which the distribution…

CaseChat AU logo

Keep reading for free

Create a free CaseChat account to read Electricity Networks Corporation v Herridge Parties and more:

  • Read every judgment in full
  • Ask AI and get answers linked to paragraphs
  • See how each paragraph was cited in later cases
  • Download judgments as PDF or Word
Continue with Google

One click creates your free account or signs you in.

By continuing you agree to the Terms and Privacy Policy.

Details
Case
[2022] HCA 37
Decision Date

CaseChat Overview and Summary

The case of *Electricity Networks Corporation v Herridge* involved the Electricity Networks Corporation (Western Power) as the appellant, and the Herridge Parties and IAG/Allianz Parties as respondents. The dispute arose from a bushfire allegedly caused by the collapse of a pole owned by a fourth respondent, Mrs Campbell, to which Western Power had attached electrical infrastructure. Western Power had contracted the fifth respondent, Thiess, to undertake works in the vicinity, and an employee of Thiess allegedly failed to adequately inspect the pole, leading to its failure and the subsequent fire. The central question was whether Western Power owed a duty of care to persons in the vicinity of its electricity distribution system to avoid or minimise the risk of injury and property damage from fire.

The High Court of Australia was required to determine the existence and scope of Western Power's duty of care in the context of its statutory functions and powers. Specifically, the court considered whether Western Power owed a duty to take reasonable care to prevent fires caused by the failure of its infrastructure, particularly when it had engaged a contractor to perform work on that infrastructure. The court also examined whether any such duty was non-delegable, as contended by the respondents in their applications for special leave to cross-appeal.

The High Court reasoned that Western Power possessed ample statutory powers to discharge any duty of care it might owe. These powers included the ability to enter land, maintain its undertakings and facilities, and take necessary actions for repair and maintenance. The court found that these powers were not inconsistent or incompatible with the existence of a duty of care to prevent foreseeable harm. The appeal was dismissed, and the applications for special leave to cross-appeal were refused, indicating that the court did not find grounds to interfere with the lower court's decision regarding the duty of care.

Consequently, the High Court ordered that the applications for special leave to cross-appeal filed by the Herridge Parties and the IAG/Allianz Parties be refused with costs. The appeal by Western Power was also dismissed with costs, and Western Power was ordered to pay the costs of the First, Second, Fourth, and Fifth Respondents.

Orders

Orders of the court

1. Application for special leave to cross-appeal filed by the First Respondents with respect to grounds 2 and 3 of the proposed grounds of cross-appeal refused with costs.

2. Application for special leave to cross-appeal filed by the Second Respondents refused with costs.

3. Appeal dismissed.

4. The Appellant pay the costs of the First, Second, Fourth and Fifth Respondents in this Court.

Background

Background to the litigation

Evidence

Evidence Before The Court

Decision

Reasons for decision

KIEFEL CJ, GAGELER, GORDON, EDELMAN AND STEWARD JJ
On the question of coherence of the duty of care with the statutory framework, Western Power had ample power to discharge its duty of care. Some of those powers have been addressed[103]. Examples of other powers included: the power to enter land or premises and improve works and maintain undertakings and facilities if requisite, advantageous or convenient to the exercise of Western Power's functions[104]; the power to enter any land, premises or things not under Western Power's control or management without consent where notice has been given[105]; the power to enter land, premises or things, relevantly, to maintain any supply system, undertaking or things[106]; the power to do all things necessary, relevantly, for maintaining or repairing any supply system, undertaking or related works[107]; the power to enter land without notice to clear or remove vegetation if Western Power was of the opinion that an occupier of land had not complied with their duty to do so[108]; and the power, relevantly, to require a consumer to make adjustments to the manner of operating electrical equipment if in Western Power's opinion the consumer's operation of that equipment would interfere with supply to other consumers[109].[103]See, eg, Electricity Corporations Act, s 59(2)-(3), (5) (see [47] above), s 63 (see [58] above); Electricity Industry Act, s 31(1), (4) (see [58] above); Energy Operators (Powers) Act, s 43(1) (see [44] above), s 46(9) (see [49] above), s 58(2)(c) (see fn 102 above).[104]Energy Operators (Powers) Act, s 28(3)(c).[105]Energy Operators (Powers) Act, s 46(2).[106]Energy Operators (Powers) Act, s 49(c).[107]Energy Operators (Powers) Act, s 49(f).[108]Energy Operators (Powers) Act, s 54(2).[109]Electricity Regulations, reg 265.Conclusion and orders For those reasons, the applications for special leave to cross-appeal filed by the Herridge Parties and the IAG/Allianz Parties, seeking to contend that the pre‑work inspection duty of care was a non‑delegable duty, are refused with costs. The appeal is dismissed with costs.

Ratio Decidendi

Legal Principle Established

Established by: KIEFEL CJ, GAGELER, GORDON, EDELMAN AND STEWARD JJ