Director, Fair Work Building Industry Inspectorate v Construction, Forestry, Mining and Energy Union

Link copied
Case Copied 45 min read

FEDERAL COURT OF AUSTRALIA

Director, Fair Work Building Industry Inspectorate v Construction, Forestry, Mining and Energy Union [2016] FCA 1225

File number: QUD 755 of 2016
Judge: COLLIER J
Date of judgment: 14 October 2016
Catchwords: PRACTICE AND PROCEDURE – scope of interlocutory injunctive relief in contention – respondents concede interlocutory orders appropriate – orthodox approach to confine injunction to necessary orders – standard of evidence in interlocutory hearings – substantive claims of coercion under Fair Work Act 2009 (Cth) – balancing rights and interests of parties and third parties – whether carve out for protected industrial action under s 408 appropriate
Legislation:

Evidence Act 1995 (Cth) s 75

Fair Work Act 2009 (Cth) ss 3, 19(2), 343, 343(1)(a), 343(1)(b), 346(b), 346(c), 348, 355(b), 408, 409, 410, 411, 417, 494(3), 512

Fair Work (Registered Organisations) Act 2009 (Cth)

Fair Work Regulations 2009 (Cth) r 3.25

Cases cited:

Australian Broadcasting Corporation v O’Neill (2006) 227 CLR 57

Director of the Fair Work Building Industry Inspectorate v Construction, Forestry, Mining and Energy Union (No 2) [2016] FCA 436

JJ Richards & Sons Pty Ltd v Fair Work Australia [2012] FCAFC 53

Laing O’Rourke Australia Pty Ltd v Construction, Forestry, Mining and Energy Union [2013] FCA 133

Optus Networks Pty Ltd v City of Boroondara (1997) 2 VR 318

Tobacco Institute of Australia Limited v Australian Federation of Consumer Organisations Inc (1992) 38 FCR 1

Victorian Egg Marketing Board v Parkwood Eggs Pty Ltd (1978) 20 ALR 129

Date of hearing: 12 October 2016
Registry: Queensland
Division: Fair Work Division
National Practice Area: Employment & Industrial Relations
Category: Catchwords
Number of paragraphs: 102
Counsel for the Applicant: Mr J Bourke QC with Ms R Sweet
Solicitor for the Applicant: Clayton Utz
Counsel for the First, Second, Third, Fourth, Fifth, Sixth, Seventh and Eighth Respondents: Mr WL Friend QC with Mr CA Massy
Solicitor for the First, Second, Third, Fourth, Fifth, Sixth, Seventh and Eighth Respondents: Hall Payne Lawyers

ORDERS

QUD 755 of 2016
BETWEEN:

DIRECTOR, FAIR WORK BUILDING INDUSTRY INSPECTORATE

Applicant

AND:

CONSTRUCTION, FORESTRY, MINING AND ENERGY UNION

First Respondent

MATTHEW PARFITT

Second Respondent

JUSTIN STEELE (and others named in the Schedule)

Third Respondent

JUDGE:

COLLIER J

DATE OF ORDER:

14 OCTOBER 2016

THE COURT ORDERS THAT:

1.Until the hearing and final determination of the proceeding or further order, the first respondent (whether by its officers, delegates, employees or agents, or howsoever otherwise) and the second to eighth respondents be restrained from organising, encouraging, directing, counselling, procuring, aiding or assisting in any stoppage, cessation, disruption or interference of paid work at any building site occupied and/or in the control or responsibility (in whole or in part) of J Hutchinson Pty Ltd T/A Hutchinson Builders (Hutchinson sites).

2.Without limiting the effect of paragraph 1 of this order, until the hearing and final determination of the proceeding or further order, the first respondent (whether by its officers, delegates, employees or agents, or howsoever otherwise) and the second to eighth respondents be restrained from:

(a)convening, organising…

CaseChat AU logo

Keep reading for free

Create a free CaseChat account to read Director, Fair Work Building Industry Inspectorate v Constru... and more:

  • Read every judgment in full
  • Ask AI and get answers linked to paragraphs
  • See how each paragraph was cited in later cases
  • Download judgments as PDF or Word
Continue with Google

One click creates your free account or signs you in.

By continuing you agree to the Terms and Privacy Policy.

Details
Case
[2016] FCA 1225
Decision Date

CaseChat Overview and Summary

In the case of Director, Fair Work Building Industry Inspectorate v Construction, Forestry, Mining and Energy Union, the Fair Work Building Industry Inspectorate sought interlocutory injunctive relief against the Construction, Forestry, Mining and Energy Union and several of its members. The dispute centred around allegations of coercion and disruption of work at multiple building sites operated by J Hutchinson Pty Ltd T/A Hutchinson Builders. The Inspectorate claimed that the Union was engaging in activities that amounted to unlawful industrial action, while the Union argued that its actions were protected and lawful under the Fair Work Act 2009 (Cth).

The legal issues before the court were whether the interlocutory injunctive relief sought by the Inspectorate was appropriate and necessary, given the specific circumstances of the case. The court had to consider the balance between the rights of the parties involved and the interests of the employees, who were not parties to the proceeding. Furthermore, the court needed to determine the standard of evidence required for interlocutory hearings and whether a carve-out for protected industrial action under section 408 of the Fair Work Act was appropriate.

The court held that the interlocutory injunctive relief sought by the Inspectorate was appropriate and necessary to protect the rights of the parties and the interests of the employees. The court emphasised that interlocutory injunctive relief should be tailored to the specific circumstances of the case and should not be wider in ambit than necessary. The court found that the Inspectorate had provided sufficient evidence to support the grant of interlocutory relief, and that the proposed orders adequately balanced the rights of the parties and the interests of the employees. The court also found that a carve-out for protected industrial action under section 408 of the Fair Work Act was appropriate in this case.

The court granted the interlocutory injunctive relief sought by the Inspectorate, with some modifications. The orders restrained the Union and its members from organising, encouraging, directing, counselling, procuring, aiding, or assisting in any stoppage, cessation, disruption, or interference of paid work at any Hutchinson site. The orders also placed restrictions on the number and frequency of meetings organised by the Union at Hutchinson sites, requiring 48 hours' written notice to be given to J Hutchinson Pty Ltd and any employer of workers anticipated to attend the meeting. The orders did not apply to any bona fide exercise of a right under any State or Territory Occupational Health and Safety law or any bona fide advice provided to a person working on a Hutchinson site regarding occupational health and safety issues.

In conclusion, the court found that the interlocutory injunctive relief sought by the Inspectorate was appropriate and necessary in this case. The court granted the relief with some modifications to balance the rights of the parties and the interests of the employees. The court's decision provides guidance on the appropriate scope of interlocutory injunctive relief in cases involving competing rights and interests, as well as the standard of evidence required for interlocutory hearings.

Orders

Orders of the court

1. Until the hearing and final determination of the proceeding or further order, the first respondent (whether by its officers, delegates, employees or agents, or howsoever otherwise) and the second to eighth respondents be restrained from organising, encouraging, directing, counselling, procuring, aiding or assisting in any stoppage, cessation, disruption or interference of paid work at any building site occupied and/or in the control or responsibility (in whole or in part) of J Hutchinson Pty Ltd T/A Hutchinson Builders (Hutchinson sites).

2. Without limiting the effect of paragraph 1 of this order, until the hearing and final determination of the proceeding or further order, the first respondent (whether by its officers, delegates, employees or agents, or howsoever otherwise) and the second to eighth respondents be restrained from:

(a) convening, organising or conducting more than one meeting of workers at the same Hutchinson site within any 7 day period; and

(b) convening, organising or conducting the meeting referred to in (a) without first giving 48 hours written notice to J Hutchinson Pty Ltd T/A Hutchinson Builders and any employer of any workers that are anticipated to attend the meeting, such notice to include a brief statement of the purpose of the meeting and the precise time, date, location and expected duration of the meeting.

3. For the avoidance of doubt, paragraphs 1 and 2 of this order do not apply to:

(a) any bona fide exercise of a right under any State or Territory OHS law as that expression is defined in s 494(3) of the Fair Work Act 2009 (Cth) (FW Act) and r 3.25 of the Fair Work Regulations 2009 (Cth) where such right is exercised by a person holding an entry permit issued pursuant to s 512 of the FW Act; or

(b) any bona fide advice provided to a person working on a Hutchinson site as to that person's rights in respect of any occupational health and safety issue, including any advice as to when it may be appropriate for a person to cease working because of a reasonable concern of an imminent risk to the person's health or safety.

4. Within 24 hours of this order being issued, the first respondent post a copy of this order on its website.

5. Personal service of this order be permitted to be effected on all respondents by a copy of this order being served by email to Luke Tiley of Hall Payne Lawyers at luket@hallpayne.com.au.

6. Costs be reserved.

7. Liberty to apply reserved on 24 hours’ notice.

Note: Entry of orders is dealt with in Rule 39.32 of the Federal Court Rules 2011.

Background

Background to the litigation

In analysing the competing forms of interlocutory injunctive relief advanced by the parties it is appropriate to briefly examine the background facts to the current proceeding. Those background facts are clearly relevant to the proper framing of interlocutory injunctive relief pending the final hearing of this matter.1. BACKGROUND FACTS Direct evidence before the Court in this proceeding is relatively sparse. A detailed affidavit filed on behalf of the Director was sworn by Mr Wayne Jenkinson, a lawyer employed by the Director, on 27 September 2016. A much briefer affidavit on behalf of the respondents was affirmed on 7 October 2016 by Mr Michael Ravbar, the Divisional Branch Secretary of the Queensland and Northern Territory Divisional Branch of the Construction, Forestry, Mining and Energy Union (CFMEU).Evidence of Mr Jenkinson Despite the length of the bundle annexed to his affidavit, Mr Jenkinson’s evidence primarily consists of a summary of various statements made by individuals in respect of activities of the respondents on Hutchinson sites. Relevantly, those statements were:·in respect of the 38 Wharf Street Project – a statement of Mr Andrew Bruce Morgan, Site Manager employed by Hutchinson Builders, provided to Mr Jenkinson on 15 September 2016;·in respect of the Ivy Apartments Project – statements of Mr Mitchel Anthony Smith, Site Manager employed by Hutchinson Builders, provided on 15 September 2016 and 26 September 2016 to Mr Ken Fitzjohn, an Inspector with the Fair Work Building Inspectorate;·in respect of the Opera Apartments Project – statements of Mr Stephen James Rushton, a Site Manager employed by Hutchinson Builders, provided on 15 September 2016 and 23 September 2016 to Mr Fitzjohn;·in respect of the Hercules Project – statements of Mr Bryce Ward, a Site Manager employed by Hutchinson Builders, provided on 15 September 2016 and 23 September 2016 to Mr Neale Smith, an Inspector with the Fair Work Building Inspectorate;·in respect of the Newstead Central Project – statements of Mr Wayne Raymond Sengelman, a Site Manager employed by Hutchinson Builders, provided on 15 September 2016 to Ms Kaz Kelly, an Inspector with the Fair Work Building Inspectorate, and on 23 September 2016 to Mr Graeme Hogan, an Inspector with the Fair Work Building Inspectorate. Mr Jenkinson also gave evidence as to a recording Mr Sengelman made on 23 September 2016;·in respect of the Skytower Project – a statement of Mr Peter Owen Haidley, a Site Manager employed by Hutchinson Builders, provided to Mr Jenkinson on 23 September 2016;·in respect of the Spire Apartments Project – a statement of Mr Terence David Bowden, a Site Manager employed by Hutchinson Builders, provided to Mr Graeme Hogan on 26 September 2016;·in respect of the Illumina Apartments Project – a statement of Mr Gavin Grosse, a Structural Foreman and Acting Site Manager employed by Hutchinson Builders, provided to Mr Jenkinson on 27 September 2016;·in respect of the South Point A Project – a statement of Mr Henk Nicholaas Throne, a Site Manager employed by Hutchinson Builders, provided to Mr Graeme Hogan on 27 September 2016.

Evidence

Evidence Before The Court

A conversation then occurred between Mr Thone and Mr Davis to the following effect:Mr Davis: “They have voted to work an 8 hour day today.”Mr Thone: “Well, if I’m pouring concrete on a Friday and it happens to fall on a Friday, how do I go via that.”Mr Davis: “If you’re pouring concrete and you pour the concrete and it takes longer than 8 hours that’s fine, but you’re [sic] only got a few men on site.”Mr Thone: “I’ve got to have crane operations on, I’ve got to have hoist operation and safety people on site to cover it.”Mr Davis: “Yeah, you’re not going to pour concrete today. You can pour concrete on Saturday because I’ll be sleeping in.”Mr Thone: “Thanks.”Mr Thone stated that he then arranged for the concrete supplier to be contacted and the concrete trucks to be cancelled. A day on the program was lost.Evidence of Mr Ravbar In his affidavit Mr Ravbar gave evidence that the CFMEU is organised into separate and autonomous divisions based on relevant industries they work in. In relation to the Construction and General Division there are autonomous divisional branches in each State and the Australian Capital Territory which are responsible for the division’s conduct in their respective areas (paragraph 3). Materially in this case, Mr Ravbar deposed that the Queensland and Northern Territory Divisional Branch of the Construction and General Division is responsible for the division’s operations in Queensland and the Northern Territory, with a separate leadership and decision-making structure to each of the other divisional branches (at paragraph 4). Mr Ravbar referred in his affidavit to clause 32.9 of the J Hutchinson Pty Ltd T/A Hutchinson Builders and CFMEU Union Collective Agreement 2015-2019 (the enterprise agreement). Clause 32 is entitled “Union rights promoting representation of members”. Clause 32.9 provides:The Employer agrees to Employees attending Union meetings or participating in Union activities during working hours and that the Employees shall be entitled to receive payment for attendance at those meetings/activities provided that:(a)the Union provides the Employer with written notice of the intention to hold the meeting/undertake the activities prior to commencement;(b)the duration of the meeting/activities is two hours or less (the duration of the meeting/activities may be extended beyond two hours by way of agreement between the Union and the Company). Authority to grant extension by the Employer rests with the General Manager or their nominee;(c)up to two meetings/activities of up to two hours each may be held per shift, either consecutively or separately, provided that notice is given in accordance with clause 32.9 (a) above. Mr Ravbar deposed that the clause is important because, in summary (paragraphs 11-15):·historically it is difficult to hold meetings of any length with members, because meetings longer than the scheduled 20 to 30 minute break time would be deemed to be taking industrial action for which employers were required to deduct at least 4 hours wages from each employee;·if meetings are held outside work hours they are often poorly attended;·the clause allows members to attend union activities such as rallies, demonstrations and memorial services without being deemed unlawful or in breach of their contracts of employment;·the clause allows workers to meet with the union or participate in union activities at short notice without having to worry about legislative restrictions such as right of entry. This allows the union to speak with members about urgent issues which arise, for example a safety incident or an entitlements issue;·under the former regulatory regime “an aggressive and impractical approach” was taken to even five minutes of alleged industrial action.

Decision

Reasons for decision

Second, while in my view the submission of Mr Friend for the respondents concerning the ability of workers on Hutchinson sites to raise issues of safety and entitlements has merit, the order proposed by the applicant is adequate to protect workers’ rights. This is because:·The parties have agreed that there should be liberty to apply in respect of any of the orders made in this matter. This liberty to apply would clearly extend to circumstances where workers were concerned about entitlements, such as the insolvency of a sub-contractor as raised in his affidavit by Mr Ravbar.·It is common ground that there is no bar on the CFMEU holding meetings with workers outside working hours. Notwithstanding the evidence of Mr Ravbar as to the undesirability of such meetings, such meetings could properly address worker concerns should there be any.·I am satisfied that State occupational health and safety laws are adequate to address safety concerns arising at short notice.6. CONCLUSION In my view the interim orders made by Greenwood J should continue until trial, with the modifications I have outlined in my judgment.

Ratio Decidendi

Legal Principle Established

Key submissions of the respondents in support of the alternative form of interlocutory injunctive orders they propose are:·The current interim orders operate throughout Australia, whereas there is no evidence of any disputation or stoppage outside Queensland or the Northern Territory, or any threat of such disputation or stoppage.·Undisputed evidence of Mr Ravbar is that the CFMEU is organised into autonomous branches consistent with the States and Territories of the Commonwealth.·The application of the current interim orders could properly be limited to those sites where the stoppages have occurred.·The current interim orders make no provision for circumstances in which employees are lawfully entitled to cease performing work, such as where a safety issue arises.·The current interim orders prevent the CFMEU from giving advice to its members in respect of circumstances where they are entitled to cease work.·The orders proposed by the respondents also balances the interests of the workers, who are not parties to this proceeding.·Interim order 1 prohibits organising any stoppages, and is therefore inconsistent with interim order 2 which allows some stoppages for meetings.·The combined effect of interim orders 1 and 2 is to interfere with the lawful exercise of rights of both the respondents and the employees who are not parties to this proceeding.·The interim orders seek to restrict the exercise not only of lawful rights, but the exercise of entitlements conferred on third parties (namely the employees) by way of Commonwealth legislation.·Proposed order 3 of the respondents replicates injunctive relief ordered in Laing O’Rourke Australia Pty Ltd v Construction, Forestry, Mining and Energy Union [2013] FCA 133.4. CONSIDERATION As Mr Friend for the respondents correctly submitted, the orthodox approach in respect of granting injunctive relief is that it should be no wider in ambit than is necessary. Sheppard J explained in Tobacco Institute of Australia Limited v Australian Federation of Consumer Organisations Inc (1992) 38 FCR 1 at 18:Nevertheless, a court asked to grant an injunction should be careful to see that it does not go further than the circumstances of the instant case require. I also note the following comments of Charles JA in Optus Networks Pty Ltd v City of Boroondara (1997) 2 VR 318 at 336:The relevant principles relating to the wording of interlocutory injunctions are well-settled, although their application is often a matter of difficulty. Because a restraining injunction prevents the person affected from acting in a particular way, on pain of penalties for contempt of court, it is essential that the injunction be certain in its terms, so that the defendant may know precisely what may or may not be done pursuant to the injunction. Imprecision and ambiguity must, so far as possible, be avoided in the language used … The proper terms of the interlocutory relief to be granted in this case must be considered in light of both the background facts and the claims of the applicant. I have already set out in some detail the background facts, at least so far as they are alleged by the applicant. In this regard, I note that none of these background facts, to date, have been contested by the respondents, and to that extent I accept them at this interlocutory level as forming a proper basis for interlocutory relief.