SUPREME COURT OF SOUTH AUSTRALIA
(Full Court)
D&V SERVICES PTY LTD v SA POWER NETWORKS
[2018] SASCFC 92
Judgment of The Full Court
(The Honourable Chief Justice Kourakis, The Honourable Justice Kelly and The Honourable Justice Lovell)
4 September 2018
TORTS - NEGLIGENCE - DANGEROUS AND INJURIOUS THINGS, ETC - BREACH OF DUTY OF CARE
TORTS - NEGLIGENCE - ESSENTIALS OF ACTION FOR NEGLIGENCE - DUTY OF CARE - REASONABLE FORESEEABILITY OF DAMAGE - PARTICULAR CASES - DANGEROUS THINGS OR SUBSTANCES
While performing excavation works an employee of the appellant company unearthed and damaged a high voltage cable owned by the respondent. The appellant was aware from a plan it obtained of the existence of the cable. It was accepted that the appellant ought to have known that the plan was "indicative" only as to the location of the cable. The appellant argued reasonable precautions were taken to avoid damaging the cable. Whether the appellant properly identified the foreseeable risk - whether reasonable precautions were taken.
Held, dismissing the appeal: Appellant failed to take reasonable precautions, and was in breach of its duty of care to the respondent; appellant liable in negligence.
Civil Liability Act 1936 (SA) ss 31, 32, referred to.
Wyong Shire Council v Shirt (1980) 146 CLR 40; Roads and Traffic Authority of NSW v Dederer (2007) 234 CLR 330, applied.
Graham Barclay Oysters Pty Ltd v Ryan (2002) 211 CLR 540; Shaw v Thomas [2010] NSWCA 169; Vairy v Wyong Shire Council (2005) 223 CLR 422, discussed.
D&V SERVICES PTY LTD v SA POWER NETWORKS
[2018] SASCFC 92Full Court: Kourakis CJ, Kelly and Lovell JJ
KOURAKIS CJ: I would dismiss the appeal for the reasons given by Lovell J and the brief additional reasons which follow.
The appellant’s concession that its director and operational manager, Mr Turic, ought to have known that the disclaimer accompanying the plan showing the location of the cable warned that the plan was indicative only, and that the cable should be precisely located if it were proposed to excavate within 5 metres of that line, is determinative of this appeal.
The disclaimer, in effect, warned that the plan’s margin of error was a radius of 5 metres from every point on the line marking the cable. The digging undertaken by the appellant was, on Mr Turic’s own evidence, within 3.2 metres of that line. Plainly then there was a significant risk that the excavation would damage the cable. Moreover, the cable was, in fact, located within 5 metres of the line marking its location.
The contractual, proprietary or statutory basis on which the requirements set out in the document headed NICC‑404 are founded was not made clear by the evidence. However, for the reasons given by Lovell J, it is implicit in its terms that those requirements applied to cases in which the cable had been precisely located.
Be that as it may, the document does not in any way revoke or amend the effect…
Keep reading for free
Create a free CaseChat account to read D&v Services Pty Ltd v SA Power Networks and more:
- Read every judgment in full
- Ask AI and get answers linked to paragraphs
- See how each paragraph was cited in later cases
- Download judgments as PDF or Word
One click creates your free account or signs you in.
By continuing you agree to the Terms and Privacy Policy.
Find similar cases
Other decisions on the same topics. Each opens in a new tab.
Details
- Case
- [2018] SASCFC 92
- Decision Date
CaseChat Overview and Summary
The central legal issue before the Full Court was whether the primary judge had erred in finding that the appellant breached its duty of care to the respondent. This involved determining whether the appellant's actions, specifically the excavation that damaged the cable, fell below the standard of care expected of a reasonable contractor in similar circumstances, and whether the appellant had taken sufficient steps to ascertain the location of underground services.
The Court reasoned that while the appellant had obtained a "Dial Before You Dig" plan, it had not obtained the accompanying disclaimer and header sheet. This disclaimer explicitly stated that the plan was indicative only regarding cable location and depth and advised contractors to use professional services for accurate location if digging within five metres of a high voltage cable. The Court held that a reasonable contractor would have appreciated the potential danger of damaging underground cables and would have taken further steps to ascertain their precise location, particularly given the significant consequences of such damage. The appellant's failure to obtain and heed the disclaimer, and its reliance on an indicative plan without further verification, was found to be a breach of its duty of care.
The appeal was dismissed, with the Full Court upholding the primary judge's finding of a breach of duty of care by the appellant.
Background
Background to the litigation
Decision
Reasons for decision
Ratio Decidendi