D&v Services Pty Ltd v SA Power Networks

Link copied
Case Copied 31 min read

SUPREME COURT OF SOUTH AUSTRALIA

(Full Court)

D&V SERVICES PTY LTD v SA POWER NETWORKS

[2018] SASCFC 92

Judgment of The Full Court

(The Honourable Chief Justice Kourakis, The Honourable Justice Kelly and The Honourable Justice Lovell)

4 September 2018

TORTS - NEGLIGENCE - DANGEROUS AND INJURIOUS THINGS, ETC - BREACH OF DUTY OF CARE

TORTS - NEGLIGENCE - ESSENTIALS OF ACTION FOR NEGLIGENCE - DUTY OF CARE - REASONABLE FORESEEABILITY OF DAMAGE - PARTICULAR CASES - DANGEROUS THINGS OR SUBSTANCES

While performing excavation works an employee of the appellant company unearthed and damaged a high voltage cable owned by the respondent. The appellant was aware from a plan it obtained of the existence of the cable. It was accepted that the appellant ought to have known that the plan was "indicative" only as to the location of the cable. The appellant argued reasonable precautions were taken to avoid damaging the cable. Whether the appellant properly identified the foreseeable risk - whether reasonable precautions were taken.

Held, dismissing the appeal: Appellant failed to take reasonable precautions, and was in breach of its duty of care to the respondent; appellant liable in negligence.

Civil Liability Act 1936 (SA) ss 31, 32, referred to.
Wyong Shire Council v Shirt (1980) 146 CLR 40; Roads and Traffic Authority of NSW v Dederer (2007) 234 CLR 330, applied.
Graham Barclay Oysters Pty Ltd v Ryan (2002) 211 CLR 540; Shaw v Thomas [2010] NSWCA 169; Vairy v Wyong Shire Council (2005) 223 CLR 422, discussed.

D&V SERVICES PTY LTD v SA POWER NETWORKS
[2018] SASCFC 92

Full Court:      Kourakis CJ, Kelly and Lovell JJ

  1. KOURAKIS CJ:    I would dismiss the appeal for the reasons given by Lovell J and the brief additional reasons which follow.

  2. The appellant’s concession that its director and operational manager, Mr Turic, ought to have known that the disclaimer accompanying the plan showing the location of the cable warned that the plan was indicative only, and that the cable should be precisely located if it were proposed to excavate within 5 metres of that line, is determinative of this appeal.

  3. The disclaimer, in effect, warned that the plan’s margin of error was a radius of 5 metres from every point on the line marking the cable.  The digging undertaken by the appellant was, on Mr Turic’s own evidence, within 3.2 metres of that line.  Plainly then there was a significant risk that the excavation would damage the cable.  Moreover, the cable was, in fact, located within 5 metres of the line marking its location. 

  4. The contractual, proprietary or statutory basis on which the requirements set out in the document headed NICC‑404 are founded was not made clear by the evidence.  However, for the reasons given by Lovell J, it is implicit in its terms that those requirements applied to cases in which the cable had been precisely located.

  5. Be that as it may, the document does not in any way revoke or amend the effect…

CaseChat AU logo

Keep reading for free

Create a free CaseChat account to read D&v Services Pty Ltd v SA Power Networks and more:

  • Read every judgment in full
  • Ask AI and get answers linked to paragraphs
  • See how each paragraph was cited in later cases
  • Download judgments as PDF or Word
Continue with Google

One click creates your free account or signs you in.

By continuing you agree to the Terms and Privacy Policy.

Details

Case
[2018] SASCFC 92
Decision Date

CaseChat Overview and Summary

In the matter of *D&V Services Pty Ltd v SA Power Networks*, the Full Court of the Supreme Court of South Australia considered an appeal by D&V Services Pty Ltd (the appellant) against a finding that it had breached its duty of care to SA Power Networks (the respondent). The dispute arose from damage caused to the respondent's underground 11kV cable during demolition and remediation works undertaken by the appellant.

The central legal issue before the Full Court was whether the primary judge had erred in finding that the appellant breached its duty of care to the respondent. This involved determining whether the appellant's actions, specifically the excavation that damaged the cable, fell below the standard of care expected of a reasonable contractor in similar circumstances, and whether the appellant had taken sufficient steps to ascertain the location of underground services.

The Court reasoned that while the appellant had obtained a "Dial Before You Dig" plan, it had not obtained the accompanying disclaimer and header sheet. This disclaimer explicitly stated that the plan was indicative only regarding cable location and depth and advised contractors to use professional services for accurate location if digging within five metres of a high voltage cable. The Court held that a reasonable contractor would have appreciated the potential danger of damaging underground cables and would have taken further steps to ascertain their precise location, particularly given the significant consequences of such damage. The appellant's failure to obtain and heed the disclaimer, and its reliance on an indicative plan without further verification, was found to be a breach of its duty of care.

The appeal was dismissed, with the Full Court upholding the primary judge's finding of a breach of duty of care by the appellant.

Background

Background to the litigation

The appellant did not dispute that it owed the plaintiff a duty of care in the circumstances. The appellant challenges the finding of the Judge that it breached its duty of care. Factual background Before turning to the legal principles involved in this matter, it is necessary to outline the factual background. The appellant was a subcontractor engaged to demolish and remove buildings and debris. The project involved returning the land at Edinburgh to a “greenfields” state. The appellant tendered for and was awarded the contract to perform the demolition and remediation work. The contract price was in excess of $500,000. Mr Turic, a director of the appellant, was involved in the tender process. Mr Turic was also the project manager. Part of the works to be performed was the removal of buried water pipes. Spotless, the principal contractor, supplied Mr Turic with a plan of the works to be performed; the plan indicated the pipes that needed removal but not the presence of underground cables. Mr Dawson, an employee of the appellant, had been involved in removing water pipes in the area for some weeks prior to 9 March 2011. On 9 March 2011, Mr Dawson excavated a trench along a section of land near Taranaki Road to uncover and remove water pipes. When digging the trench, Mr Dawson used a bucket on the excavator approximately 1.2 metres wide. Mr Dawson operated the excavator under the instructions of Mr Turic. During the trenching operation, the “bucket” of the excavator disturbed the respondent’s 11kV cable causing significant damage. Had Mr Dawson cut the 11kV cable, the consequences for him may have been very serious. The appellant’s contract with Spotless required the appellant to obtain a “Dial Before You Dig” plan (“DBYD plan”). Mr Lukosius, an employee of the respondent, gave evidence about the Dial Before You Dig service and how the respondent dealt with requests. Dial Before You Dig is a national service available to contractors generally; it assists in locating underground services such as power cables, telephone lines or gas lines. To locate such underground services, a contractor contacts the service which then passes the request onto the relevant authority such as the respondent. The authority then sends to the contractor a plan showing its services in the area along with other relevant information. Mr Lukosius stated that upon receipt of a request from the Dial Before You Dig service, the respondent, which handles up to 10,000 enquiries in a busy month, would send a plan direct to the contractor showing the location of their infrastructure. The plan is sent with a “disclaimer and a header sheet” to the contractor seeking the information. Mr Turic did not contact the Dial Before You Dig service. However, he obtained a copy of the DBYD plan of the area from another contractor onsite. Mr Turic did not obtain a copy of the “disclaimer and a header sheet” sent with the plan. The disclaimer and header sheet advised that the plan, as to the location and depth of cables, was indicative only. A copy of the “pro forma” disclaimer was tendered. It stated that the “data contained in the attached plan is indicative only as to cable location and cable depth”. Further, the disclaimer recommended that if a contractor intended to dig within 5 metres of the location of a high voltage cable, they should use the respondent or another professional service to locate the cable accurately.

Decision

Reasons for decision

Ratio Decidendi

Legal principle established