Australian Energy Regulator v CAM Engineering and Construction Pty Ltd

Link copied
Case Copied 51 min read

FEDERAL COURT OF AUSTRALIA

Australian Energy Regulator v CAM Engineering and Construction Pty Ltd [2025] FCA 737

File number: NSD 1187 of 2023
Judgment of: SARAH C DERRINGTON J
Date of judgment: 4 July 2025
Catchwords: CORPORATIONS – admitted contravention of s 112(2) of the National Energy Retail Law (NSW) – where respondent failed to join an energy ombudsman scheme as required as a condition of status as an exempt retailer selling metered energy to residential customers who were residents of a retirement village – where contravention extended over period of 16 months – where contravention deprived residents of access to ombudsman scheme – determination of appropriate penalty – where need for both specific and general deterrence – where significant penalty is appropriate
Legislation:

Competition and Consumer Act 2010 (Cth) ss 44AAG, 44AE

National Energy Retail Law (Adoption) Act 2012 (NSW) ss 4A(1)(c), 5, 44, 110, 112, 206, 294, 308, Part 12

National Energy Retail Law (South Australia) Act 2011 (SA) ss 12, 15, 237

National Gas (South Australia) Act 2008 (SA) s 279(2)(b)(ii)

National Energy Retail Regulations (NSW) regs 5(a), 6(2)

National Energy Retail Rules rr 25(1), 74

Cases cited:

Australian Building and Construction Commissioner vPattinson [2022] HCA 13; 274 CLR 450

Australian Competition and Consumer Commission v High Adventure Pty Ltd [2005] FCAFC 247

Australian Competition and Consumer Commission v Lactalis Australia Pty Ltd (No 2) [2023] FCA 839

Australian Competition and Consumer Commission v Le Sands Restaurant and Le Sands Café Pty Ltd [2011] FCA 105

Australian Competition and Consumer Commission v Leahy Petroleum (No 2) [2005] FCA 254; 215 ALR 281

Australian Competition and Consumer Commission v Reckitt Benckiser (Australia) Pty Ltd [2016] FCAFC 181; 340 ALR 25

Australian Ophthalmic Supplies Pty Ltd v McAlary-Smith [2008] FCAFC 8; 165 FCR 560

Australian Securities and Investments Commission v Australia and New Zealand Banking Group Limited [2023] FCA 256

Australian Securities and Investments Commission v Holista Colltech Ltd [2024] FCA 244

Australian Securities and Investments Commission v Ostrava Equities Pty Ltd [2016] FCA 1064

Commonwealth v Director, Fair Work Building Industry Inspectorate [2015] HCA 46; 258 CLR 482

Communications, Electrical, Electronic, Energy, Information, Postal, Plumbing and Allied Services Union of Australia v Telstra Corporation Ltd [2007] FCA 1607; 168 IR 368

Construction, Forestry, Mining and Energy Union v De Martin & Gasparini Pty Ltd (No 3) [2018] FCA 1395

Flight Centre Ltd v Australian Competition and Consumer Commission (No 2) [2018] FCAFC 53; 260 FCR 68

Jones v Dunkel [1959] HCA 8; 101 CLR 298

Minister for Industry, Tourism & Resources v Mobil Oil Australia Pty Ltd (2004) ATPR 41-993

NW Frozen Foods Pty Ltd v Australian Competition and Consumer Commission [1996] FCA 1134; 71 FCR 285

Re Chemeq Ltd; Australian Securities and Investments Commission v Chemeq Ltd [2006] FCA 936; 234 ALR 511

Trade Practices Commission vCSR Ltd (1991) ATPR 41-076

Division: General Division
Registry: New South Wales
National Practice Area: Commercial and…
CaseChat AU logo

Keep reading for free

Create a free CaseChat account to read Australian Energy Regulator v CAM Engineering and Constructi... and more:

  • Read every judgment in full
  • Ask AI and get answers linked to paragraphs
  • See how each paragraph was cited in later cases
  • Download judgments as PDF or Word
Continue with Google

One click creates your free account or signs you in.

By continuing you agree to the Terms and Privacy Policy.

Details
Case
[2025] FCA 737
Decision Date

CaseChat Overview and Summary

The Australian Energy Regulator (AER) filed a lawsuit against CAM Engineering and Construction Pty Ltd in the Federal Court of Australia. The AER sought a declaration that CAM had breached s 112(2) of the National Energy Retail Law (NSW) by not joining an energy ombudsman scheme as a condition of its status as an exempt retailer. The contravention occurred during the period from 11 March 2021 to 21 July 2022, when CAM sold metered energy to residents of the Cooranbong Gardens Retirement Village, who were residents of a retirement village. The court had to decide whether CAM contravened the specified condition of its retail exemption and if so, what penalty should be imposed.

The court found that CAM had indeed contravened the condition of its retail exemption by failing to join the Energy & Water Ombudsman (NSW) Ltd (EWON) scheme as required. The contravention deprived residents of access to the ombudsman scheme, which was a significant breach of the condition. The court considered both specific and general deterrence in determining the appropriate penalty. The court held that a significant penalty was necessary to ensure compliance and deter others from similar breaches. The court ordered CAM to pay a pecuniary penalty of $250,000 and mandated that CAM submit to EWON’s jurisdiction for complaints arising during the contravention period and inform its exempt customers of their rights.

The court's reasoning was grounded in the importance of ensuring that exempt retailers comply with the conditions of their retail exemption to protect consumers and maintain the integrity of the energy retail market. The penalty was deemed necessary to achieve both specific deterrence for CAM and general deterrence for other exempt retailers. The court emphasised that the penalty should reflect the seriousness of the contravention and the need to uphold consumer rights. The orders also required CAM to communicate with its customers regarding the contravention and their rights under the EWON scheme.

Orders

Orders of the court

1. Pursuant to s 44AAG(1)(b) of the Competition and Consumer Act 2010 (Cth), the Court declares that, by failing to be a member of the energy ombudsman scheme operated by the Energy & Water Ombudsman (NSW) Ltd (EWON) during the period 11 March 2021 to 21 July 2022 (Relevant Period), where it was permitted to be a member of that scheme, while also during the Relevant Period selling energy to exempt customers within New South Wales, CAM Engineering:

(a) failed to comply with a condition of its retail exemption (Condition 17), imposed under s 112(1) of the Retail Law (NSW); and

(b) therefore, contravened s 112(2) of the Retail Law (NSW).

2. Pursuant to s 44AAG(2)(a) of the Competition and Consumer Act 2010 (Cth), within 28 days of the date of these Orders, CAM Engineering is to pay to the Commonwealth of Australia a pecuniary penalty in the sum of $250,000 in respect of its contravention of s 112(2) of the Retail Law (NSW).

3. Pursuant to s 44AAG(2)(c) of the Competition and Consumer Act 2010 (Cth), CAM Engineering must:

(a) submit to EWON’s jurisdiction in respect of any complaints by its exempt customers concerning matters which occurred during the Relevant Period; and

(b) in respect of any such complaints, not take any objection on the basis of the time limitation in cl 4.3 of EWON’s Charter.

4. Pursuant to s 44AAG(2)(c) of the Competition and Consumer Act 2010 (Cth), CAM Engineering must write to each exempt customer to whom it sold energy within the Relevant Period, being each person named in the list contained in Confidential Annexure A to these Orders, both by mail to their residential address and, where an email address is provided for them, by email to their email address, in the form of the approved letter which is Annexure B to these Orders, informing them of:

(a) its failure to be a member of EWON during the Relevant Period;

(b) their rights to make complaints to EWON, including in respect of any complaints arising within the Relevant Period; and

(c) the effect of Order 3 above.

5. The applicant has 14 days from the date of these Orders to provide to my Associate any affidavit evidence and written submissions, not exceeding 3 pages in length, on the question of costs.

6. CAM Engineering has 28 days from the date of these Orders to provide to my Associate any affidavit evidence and written submissions, not exceeding 3 pages in length, in response on the question of costs.

Note: Entry of orders is dealt with in Rule 39.32 of the Federal Court Rules 2011.

CONFIDENTIAL ANNEXURE A

List of exempt customers at Cooranbong Gardens Retirement Village

[Redacted]

ANNEXURE B

Approved form of letter to exempt customers

[To be issued on CAM Engineering’s letterhead]

[Exempt Customer name]

[Exempt Customer address]

Dear [Exempt Customer name]

Notification of rights relating to the New South Wales Energy & Water Ombudsman Scheme

Supply of electricity to residents of the Cooranbong Gardens Retirement Village

CAM Engineering Pty Ltd (ACN 611 016 570) (CAM Engineering) was the developer and electricity seller for the Cooranbong Gardens Retirement Village (Village) during the period 11 March 2021 to 21 July 2022 (Relevant Period). The Village is serviced by an “embedded network” – that is, a private electricity network that serves multiple premises.

During the Relevant Period, CAM Engineering held a retail exemption from the Australian Energy Regulator (AER), pursuant to which it was entitled to sell metred energy to residents of the Village via the embedded network. It was a condition of CAM Engineering’s retail exemption that it must be a member of the New South Wales Energy & Water Ombudsman scheme (EWON).

EWON deals with complaints from New South Wales electricity and gas customers, and some water customers. EWON is a scheme that enables consumers (like you) to make complaints, and have those complaints investigated and determined (in a binding way) by EWON. This assistance from EWON is only available if your electricity seller is a member of EWON.

Despite being required to do so, CAM Engineering did not join EWON until 22 July 2022 and was not a member of EWON during the Relevant Period.

Proceeding in the Federal Court of Australia

On 19 October 2023, the AER commenced proceedings against CAM Engineering in the Federal Court of Australia. On 12 June 2024, CAM Engineering admitted that it had not complied with the condition of its retail exemption requiring it to join EWON, contrary to section 112(1) of the National Energy Retail Law.

On [## insert date], the Federal Court of Australia:

1. declared that, by failing to be a member of EWON during the Relevant Period, where it was permitted to be a member of that scheme, CAM Engineering failed to comply with a condition of its retail exemption, and therefore contravened section 112(1) of the National Energy Retail Law;

2. ordered CAM Engineering to pay a civil penalty in the amount of [$## insert amount]; and

3. ordered CAM Engineering to:

a. submit to EWON’s jurisdiction in respect of any complaints concerning matters which occurred during the Relevant Period; and

b. in respect of any such complaints, not take objection on the basis that the complaints were not made within 12 months of the Relevant Period; and

c. send this letter to each of the customers to whom it sold electricity during the Relevant Period.

The orders are attached with this notice.

Effect of the Federal Court’s orders

Because of the Federal Court’s orders, if you had any complaint about the sale of electricity by CAM Engineering during the Relevant Period, you can now seek assistance from EWON in relation to that complaint. Otherwise, because CAM Engineering was not a member of EWON during the Relevant Period, EWON would not have been able to assist. Under the orders, CAM Engineering cannot object to any complaints arising within the Relevant Period on the basis that the time for making complaints has expired.

You may also complain to EWON if you have any issues arising after the Relevant Period. CAM Engineering ceased to hold its retail exemption on 13 January 2025 but was replaced as exempt seller by Cooranbong Village Management Operator Pty Ltd (ACN 642 399 442), which is also a member of EWON.

Details about EWON and its complaint process can be found on their website (https://www.ewon.com.au/page/making-a-complaint).

Please contact [insert contact name and details] if you have any questions in relation to this.

Kind regards,

[insert contact name]

Background

Background to the litigation

On the Friday before the hearing of this matter the following Monday, the Court was informed that CAM’s legal representatives had withdrawn. It emerged at the hearing that this was because Mr Bateman was in arrears of fees for this proceeding but wished to use whatever funds he could make available for legal representation to pay his legal representatives to represent CAM in a proceeding in the Supreme Court of New South Wales. Mr Bateman was given leave to represent CAM at the hearing in this Court. The Court, and Mr Bateman, had the benefit of the written submissions which had already been filed by CAM’s legal representatives and on which CAM relied at the hearing.BACKGROUND The functions of the AER include the enforcement of the National Energy Retail Law (NationalRetail Law), which is a schedule to the National Energy Retail Law (South Australia) Act 2011 (SA) (Retail Law (SA)). The Retail Law (SA) applies, with certain modifications, as a law of New South Wales pursuant to s 4 of the National Energy Retail Law (Adoption) Act 2012 (NSW) (Retail Law (NSW)). Pursuant to s 44AAG(1)(b) and (2) of the CCA, the AER applies for a declaration that CAM contravened s 112(2) of the Retail Law (NSW) and for the imposition of a civil penalty and associated relief. The parties filed a Joint Statement of Agreed Facts on 8 May 2024 (SAF) and a Joint Outline of Submissions on Liability on 4 July 2024. The parties agreed that it was appropriate for the Court to make the declaration sought under s 44AAG(1)(b) of the CCA. The contravention occurred in the context of the on-selling of electricity through an embedded network between 11 March 2021 and 21 July 2022 (Relevant Period) by CAM to residents of the Cooranbong Gardens Retirement Village, of which CAM was the developer. During the Relevant Period, CAM held the registered class R3 retail exemption no E-6843 (Retail Exemption) granted to it by the AER under s 110(1) of the Retail Law (NSW) in respect of the embedded network at Cooranbong Gardens. Such an exemption may be granted to an owner or operator of a retirement village selling metered energy to residential customers within the limits of a site that they own, occupy or operate. Pursuant to s 112(1) of the Retail Law (NSW), Condition 17 of the Retail Exemption was imposed by the AER and required CAM, if permitted by an energy ombudsman scheme:(a)to be a member of, or subject to, an energy ombudsman scheme for each jurisdiction where it sells energy to exempt customers; and(b)to comply with the requirements of that scheme. The National Energy Retail Rules (Retail Rules) are made under s 237 of the National Retail Law, s 15 of which gives the Retail Rules the force of law. The National Energy Retail Regulations (NSW) (Retail Regulations (NSW)) are also made under s 12 of the Retail Law (SA), and apply, with certain modifications, as regulations in force in New South Wales pursuant to s 5 of the Retail Law (NSW). During the Relevant Period, reg 5(a) of the Retail Regulations (NSW) prescribed the Energy & Water Ombudsman (NSW) Ltd (EWON) as the energy ombudsman for the State of New South Wales.

Evidence

Evidence Before The Court

Full text does not contain this section.

Decision

Reasons for decision

Full text does not contain this section.

Ratio Decidendi

Legal Principle Established

Full text does not contain this section.