FEDERAL COURT OF AUSTRALIA
Australian Building and Construction Commissioner v Ravbar (No 2)
[2019] FCA 522
File number: QUD 881 of 2016 Judge: REEVES J Date of judgment: 15 April 2019 Catchwords: INDUSTRIAL LAW – penalties to be imposed for contraventions of s 343 of the Fair Work Act 2009 (Cth) – whether two penalties or two penalties with a notional maximum of one should be imposed on the Construction, Forestry, Maritime, Mining and Energy Union (CFMMEU) for the contraventions of s 343 based on the conduct of the first and third respondents – whether the conduct of the first and third respondents form part of the same transaction or course of conduct – how the CFMMEU’s history of contraventions should be taken into account in assessing an appropriate penalty – what factors should be taken into account when assessing the objective seriousness, or gravity, of the respondents’ contravening conduct – what the appropriate penalties should be Legislation: Fair Work Act 2009 (Cth) Cases cited: Australian Building and Construction Commissioner v Construction, Forestry, Mining and Energy Union (2017) 254 FCR 68; [2017] FCAFC 113
Australian Building and Construction Commissioner v Ravbar [2018] FCA 1196
BHP Steel (AIS) Pty Ltd v Construction, Forestry, Mining and Energy Union [2001] FCA 336
Cahill v Construction, Forestry, Mining and Energy Union (No 4) (2009) 189 IR 304; [2009] FCA 1040
Commonwealth of Australia v Director, Fair Work Building Industry Inspectorate (2015) 258 CLR 482; [2015] HCA 46
Construction, Forestry, Mining and Energy Union v Williams (2009) 262 ALR 417; [2009] FCAFC 171
Construction, Forestry, Mining and Energy Union v Decmil Engineering Pty Ltd (No 2) [2017] FCA 1237
Director of the Fair Work Building Industry Inspectorate v Stephenson [2014] FCA 1432
Markarian v The Queen (2005) 228 CLR 357; [2005] HCA 25
Parker v Australian Building and Construction Commissioner [2019] FCAFC 56
The Queen v McInerney (1986) 42 SASR 111
Trade Practices Commission v CSR Limited (1991) ATPR ¶41-076 at 52,152
Date of hearing: 23 October 2018 Registry: Queensland Division: Fair Work Division National Practice Area: Employment & Industrial Relations Category: Catchwords Number of paragraphs: 29 Counsel for the Applicant: Mr CJ Murdoch QC Solicitor for the Applicant: Ashurst Australia Counsel for the First, Third and Fifth Respondents: Mr CW Dowling SC and Mr CA Massy Solicitor for the First, Third and Fifth Respondents: Hall Payne Lawyers ORDERS
QUD 881 of 2016 BETWEEN: AUSTRALIAN BUILDING AND CONSTRUCTION COMMISSIONER
Applicant
AND: MICHAEL RAVBAR
First Respondent
PETER CLOSE
Second Respondent
ANDREW SUTHERLAND (and others named in the Schedule)
Third Respondent
JUDGE:
REEVES J
DATE OF…
Keep reading for free
Create a free CaseChat account to read Australian Building and Construction Commissioner v Ravbar (... and more:
- Read every judgment in full
- Ask AI and get answers linked to paragraphs
- See how each paragraph was cited in later cases
- Download judgments as PDF or Word
One click creates your free account or signs you in.
By continuing you agree to the Terms and Privacy Policy.
Find similar cases
Other decisions on the same topics. Each opens in a new tab.
Details
- Case
- [2019] FCA 522
- Decision Date
CaseChat Overview and Summary
The court examined the arguments and submissions presented by both the CFMMEU and the Commissioner, focusing on the principle of a course of conduct and whether the actions of Mr Ravbar and Mr Sutherland were part of the same transaction. It concluded that the actions were distinct enough to warrant two separate penalties. The court also considered the history of contraventions by the CFMMEU and the need for the penalties to serve a deterrent purpose. In assessing the seriousness of the conduct, the court took into account the nature of the interference with the business operations of Universal Cranes and the intent behind the actions.
Ultimately, the court determined that two separate penalties should be imposed on the CFMMEU, with a notional maximum of one penalty. Mr Ravbar was ordered to pay a penalty of $5,000, Mr Sutherland was ordered to pay a penalty of $3,500, and the CFMMEU was ordered to pay a total penalty of $50,000 for the two contraventions. The court found no reason to reduce the total penalty imposed on the CFMMEU, considering the need for deterrence and the settled principles of penalty assessment under the Fair Work Act.
Orders
Orders of the court
1. The first respondent pay a penalty of $5,000 for his contravention of s 343 of the Fair Work Act 2009 (Cth).
2. The third respondent pay a penalty of $3,500 for his contravention of s 343 of the Fair Work Act 2009 (Cth).
3. The fifth respondent pay a total penalty of $50,000 for its two contraventions of s 343 of the Fair Work Act 2009 (Cth).
Note: Entry of orders is dealt with in Rule 39.32 of the Federal Court Rules 2011.
Background
Background to the litigation
Decision
Reasons for decision
Ratio Decidendi
Legal principle established
The primary, if not only, object of a civil remedy penalty under the FWA is deterrence (see Commonwealth of Australia v Director, Fair Work Building Industry Inspectorate (2015) 258 CLR 482; [2015] HCA 46 (Commonwealth v Inspectorate) where the High Court adopted (at [55]) the observations of French J in Trade Practices Commission v CSR Limited (1991) ATPR ¶41-076 at 52,152. Among other things, deterrence requires the Court to fix a penalty which is not “regarded by [the] offender or others as an acceptable cost of doing business” (see Construction, Forestry, Mining and Energy Union v Decmil Engineering Pty Ltd (No 2) [2017] FCA 1237 at [38] and the cases cited there). Otherwise the principles bearing on the assessment of an appropriate penalty under the FWA are well settled. A relatively recent example is Director of the Fair Work Building Industry Inspectorate v Construction, Forestry, Mining and Energy Union [2015] FCA 353 where Tracey J conveniently summarised those principles at [66]–[73]. I have had regard to these principles in assessing the appropriate penalty in this matter.CONSIDERATION I turn now to consider, in turn, the four issues set out above.(a) The number of contraventions On this first issue, relying on the Full Court decision in Construction, Forestry, Mining and Energy Union v Williams (2009) 262 ALR 417; [2009] FCAFC 171, the CFMMEU contended that the conduct of its human agents, Mr Ravbar and Mr Sutherland, which was attributed to the CFMMEU under s 793, was so closely interconnected in time, place and purpose that it should be regarded as forming part of the same transaction, or course of conduct, such that whilst separate penalties should be imposed on the CFMMEU, the notional maximum of those should equate to that of one penalty. In response, the Commissioner contended that their conduct was sufficiently disparate to justify two penalties being imposed. The authorities relating to the course of conduct principle are discussed at length in Parker at [267]–[288]. As that discussion discloses, the critical question is whether the contraventions concerned involved common legal and factual elements reflecting the same criminality or, in this context, wrongdoing. As is already mentioned above, the two contraventions central to this issue were founded on the conduct of Mr Ravbar and Mr Sutherland that was attributed to the CFMMEU under s 793 of the FWA. This is important because it is apparent from the declarations made with respect to the contraventions associated with the third Port Connect incident (see at [1] above) that the CFMMEU’s contravention involving Mr Ravbar related to him giving the “Ravbar Direction” (see at [1(14)] above) and the contravention involving Mr Sutherland related to “the Sutherland Conduct” (see at [1(17)] above). The former expression is defined in the orders to mean “in or about October 2012 … directing organisers employed by [the CFMMEU] to follow the Universal Cranes cranes from the Universal Cranes yard to see where they were going, and to stop them from operating when they arrived at their destination” (see at [1(7)] above). As the liability judgment shows, this direction was given at an organiser’s meeting held at the CFMMEU offices in Bowen Hills, Brisbane on the day before the third Port Connect incident. It therefore involved a direction to act rather than the action itself.