Australian Building and Construction Commissioner v Ravbar (No 2)

Link copied
Case Copied 24 min read

FEDERAL COURT OF AUSTRALIA

Australian Building and Construction Commissioner v Ravbar (No 2)

[2019] FCA 522

File number: QUD 881 of 2016
Judge: REEVES J
Date of judgment: 15 April 2019
Catchwords: INDUSTRIAL LAW – penalties to be imposed for contraventions of s 343 of the Fair Work Act 2009 (Cth) – whether two penalties or two penalties with a notional maximum of one should be imposed on the Construction, Forestry, Maritime, Mining and Energy Union (CFMMEU) for the contraventions of s 343 based on the conduct of the first and third respondents – whether the conduct of the first and third respondents form part of the same transaction or course of conduct – how the CFMMEU’s history of contraventions should be taken into account in assessing an appropriate penalty – what factors should be taken into account when assessing the objective seriousness, or gravity, of the respondents’ contravening conduct – what the appropriate penalties should be
Legislation: Fair Work Act 2009 (Cth)
Cases cited:

Australian Building and Construction Commissioner v Construction, Forestry, Mining and Energy Union (2017) 254 FCR 68; [2017] FCAFC 113

Australian Building and Construction Commissioner v Ravbar [2018] FCA 1196

BHP Steel (AIS) Pty Ltd v Construction, Forestry, Mining and Energy Union [2001] FCA 336

Cahill v Construction, Forestry, Mining and Energy Union (No 4) (2009) 189 IR 304; [2009] FCA 1040

Commonwealth of Australia v Director, Fair Work Building Industry Inspectorate (2015) 258 CLR 482; [2015] HCA 46

Construction, Forestry, Maritime, Mining and Energy Union v Australian Building and Construction Commissioner (The Broadway on Ann Case) [2018] FCAFC 126

Construction, Forestry, Mining and Energy Union v Williams (2009) 262 ALR 417; [2009] FCAFC 171

Construction, Forestry, Mining and Energy Union v Decmil Engineering Pty Ltd (No 2) [2017] FCA 1237

Director of the Fair Work Building Industry Inspectorate v Stephenson [2014] FCA 1432

Director of the Fair Work Building Industry Inspectorate v Construction, Forestry, Mining and Energy Union [2015] FCA 353

Director of the Fair Work Building Industry Inspectorate v Construction, Forestry, Mining and Energy Union [2016] FCA 798

Markarian v The Queen (2005) 228 CLR 357; [2005] HCA 25

Parker v Australian Building and Construction Commissioner [2019] FCAFC 56

The Queen v McInerney (1986) 42 SASR 111

Trade Practices Commission v CSR Limited (1991) ATPR ¶41-076 at 52,152

Veen v The Queen (No 2) (1988) 164 CLR 465

Date of hearing: 23 October 2018
Registry: Queensland
Division: Fair Work Division
National Practice Area: Employment & Industrial Relations
Category: Catchwords
Number of paragraphs: 29
Counsel for the Applicant: Mr CJ Murdoch QC
Solicitor for the Applicant: Ashurst Australia
Counsel for the First, Third and Fifth Respondents: Mr CW Dowling SC and Mr CA Massy
Solicitor for the First, Third and Fifth Respondents: Hall Payne Lawyers

ORDERS

QUD 881 of 2016
BETWEEN:

AUSTRALIAN BUILDING AND CONSTRUCTION COMMISSIONER

Applicant

AND:

MICHAEL RAVBAR

First Respondent

PETER CLOSE

Second Respondent

ANDREW SUTHERLAND (and others named in the Schedule)

Third Respondent

JUDGE:

REEVES J

DATE OF…

CaseChat AU logo

Keep reading for free

Create a free CaseChat account to read Australian Building and Construction Commissioner v Ravbar (... and more:

  • Read every judgment in full
  • Ask AI and get answers linked to paragraphs
  • See how each paragraph was cited in later cases
  • Download judgments as PDF or Word
Continue with Google

One click creates your free account or signs you in.

By continuing you agree to the Terms and Privacy Policy.

Find similar cases

Other decisions on the same topics. Each opens in a new tab.

Details

Case
[2019] FCA 522
Decision Date

CaseChat Overview and Summary

In the matter of Australian Building and Construction Commissioner v Ravbar (No 2), the court was tasked with determining the penalties to be imposed for contraventions of section 343 of the Fair Work Act 2009 (Cth) by the Construction, Forestry, Maritime, Mining and Energy Union (CFMMEU). The contraventions were based on the conduct of Mr Ravbar and Mr Sutherland, who were officers of the CFMMEU. The primary legal issues concerned whether two separate penalties or a single penalty with a notional maximum should be imposed on the CFMMEU, how the history of the CFMMEU’s contraventions should be taken into account, and the factors relevant to assessing the objective seriousness of the respondents’ conduct. The court also needed to determine the appropriate penalties to be imposed.

The court examined the arguments and submissions presented by both the CFMMEU and the Commissioner, focusing on the principle of a course of conduct and whether the actions of Mr Ravbar and Mr Sutherland were part of the same transaction. It concluded that the actions were distinct enough to warrant two separate penalties. The court also considered the history of contraventions by the CFMMEU and the need for the penalties to serve a deterrent purpose. In assessing the seriousness of the conduct, the court took into account the nature of the interference with the business operations of Universal Cranes and the intent behind the actions.

Ultimately, the court determined that two separate penalties should be imposed on the CFMMEU, with a notional maximum of one penalty. Mr Ravbar was ordered to pay a penalty of $5,000, Mr Sutherland was ordered to pay a penalty of $3,500, and the CFMMEU was ordered to pay a total penalty of $50,000 for the two contraventions. The court found no reason to reduce the total penalty imposed on the CFMMEU, considering the need for deterrence and the settled principles of penalty assessment under the Fair Work Act.

Orders

Orders of the court

1. The first respondent pay a penalty of $5,000 for his contravention of s 343 of the Fair Work Act 2009 (Cth).

2. The third respondent pay a penalty of $3,500 for his contravention of s 343 of the Fair Work Act 2009 (Cth).

3. The fifth respondent pay a total penalty of $50,000 for its two contraventions of s 343 of the Fair Work Act 2009 (Cth).

Note: Entry of orders is dealt with in Rule 39.32 of the Federal Court Rules 2011.

Background

Background to the litigation

These reasons concern the penalties to be imposed for the above described contraventions.THE FACTUAL BACKGROUND The details of the two individual respondents involved in the contraventions, Mr Ravbar and Mr Sutherland, were conveniently summarised in the Commissioner’s penalty submissions as follows:Mr Ravbar4.At the relevant time, Mr Ravbar was the Divisional State Secretary for the CFMMEU for Queensland and the Northern Territory. He has held this role for over 11 years and continues to hold this role.5. Mr Ravbar oversees the finance, the administration and the governance of the CFMMEU. He is also a member of a number of boards which govern industry funds.6.By virtue of this role, Mr Ravbar is the most senior official within the Construction and General Division of the CFMMEU in Queensland and the Northern Territory and exercises considerable power and authority over the conduct of others within the Divisional Branch, including directing organisers to undertake certain activities on behalf of the union.7. Mr Ravbar is also currently the National Vice President of the CFMMEU and is on the National Executive Committee of the CFMMEU.Mr Sutherland8. At the relevant time Mr Sutherland held the role of union organiser. Organisers in Brisbane are responsible for a geographic area as well as an industry sector. On a day-to-day basis, organisers receive instructions from the coordinators responsible for their area. This role includes negotiating enterprise agreements with subcontractors that are operating on sites for which the organiser is responsible.9.In 2013 Mr Sutherland was appointed as crane coordinator.10.He has since been promoted to hold a number of senior positions including, National Divisional Assistant Secretary of the Construction and General Division of the CFMMEU, Divisional Branch Assistant Secretary of the Queensland and Northern Territory Branch of the CFMMEU and is a member of the National Executive of the CFMMEU.11.The CFMMEU is a registered organisation under the FW Act of substantial size, resources and influence that relevantly operates in the building and construction industry. As at 31 March 2018, the Construction and General Division of the CFMMEU had 65,531 financial members across Australia.(Footnotes omitted) The details of the third Port Connect incident to which these contraventions relate were also conveniently summarised in the Commissioner’s penalty submissions as follows:14.In 2012 there were negotiations between Universal Cranes and the CFMMEU in relation to an enterprise agreement … [A]s an abstract proposition there was a general desire on the part of three senior officials, Mr Close (then the Assistant Divisional Branch Secretary for Queensland and the Northern Territory), Mr Ingham and Mr Ravbar to have Universal Cranes enter into a CFMMEU model agreement.15.From mid-August 2012 the central focus of those negotiations shifted from Universal Cranes joining the BERT Fund to other contentious provisions of the CFMMEU model agreement and such negotiations from that point onwards were decidedly tense. As a result of the continued refusal by Universal Cranes to enter into a CFMMEU model agreement, the union became frustrated with what it regarded as Mr Smith’s intransigence in not accepting these contentious provisions. It is in this context that the contraventions as found … occurred.16.Universal Cranes became a specific topic of discussion at organiser’s meetings held by the CFMMEU in the context of Universal Cranes’ refusal to enter into a CFMMEU model agreement. At one such meeting, organisers, including Mr Cradden and Mr Sutherland, were told to go to the Universal Cranes yard the next morning, follow the cranes as they left and stop them from working once they arrived at their destinations. This direction was given by Mr Ravbar and the motivation and purpose of giving such direction was to put pressure on Universal Cranes to force it to enter into a CFMMEU model agreement.17.As a result of Mr Ravbar’s direction, at least six CFMMEU officials including Mr Cradden and Mr Sutherland gathered at a café in the vicinity of the Universal Cranes yard the next morning. Mr Cradden and Mr Sutherland and others then followed a franna crane to the Port Connect Project located on the Gateway Motorway.18.Upon arrival at the Port Connect Project, Mr Cradden and Mr Sutherland parked their cars in a way which blocked in the Universal Cranes franna crane. At least five CFMMEU officials were present at the project in a total of four vehicles. Their presence drew the attention of Mr Zoller, the construction manager who attended at the site and spoke with Mr Cradden. Mr Zoller was advised that the union officials were there to stop the crane from working. As a result of the action of the officials, Mr Zoller sent the franna crane back to the Universal Cranes yard. The union officials then left the site. The actions of Mr Sutherland and other officials prevented the franna crane from operating that day and subsequently Universal Cranes did not perform any more franna crane work on the site during the day.19.Mr Sutherland had no legitimate entitlement to enter the Port Connect site that day and had no legitimate entitlement to block the use of the Universal Cranes franna crane. Similarly, Mr Ravbar had no legitimate entitlement to direct Mr Sutherland to take that action.20.The separate actions of Mr Ravbar and Mr Sutherland were committed in order to apply illegitimate pressure to Universal Cranes so as to force it to enter into a CFMMEU model agreement by interrupting and preventing the performance of work by Universal Cranes.(Footnotes omitted)THE ISSUES

Decision

Reasons for decision

Finally, with respect to the CFMMEU, I have reflected upon whether the total penalty of $50,000 to be imposed on it should be reduced, having regard to the seriousness of its contraventions and to considerations of totality and proportionality. Having done so, I see no reason to make any such reduction.CONCLUSION For these reasons, I will order that:1.Mr Ravbar pay a penalty of $5,000 for his contravention of s 343 of the Fair Work Act 2009 (Cth).2.Mr Sutherland pay a penalty of $3,500 for his contravention of s 343 of the Fair Work Act 2009 (Cth).3.The Construction, Forestry, Maritime, Mining and Energy Union pay a total penalty of $50,000 for its two contraventions of s 343 of the Fair Work Act 2009 (Cth).

Ratio Decidendi

Legal principle established

The primary, if not only, object of a civil remedy penalty under the FWA is deterrence (see Commonwealth of Australia v Director, Fair Work Building Industry Inspectorate (2015) 258 CLR 482; [2015] HCA 46 (Commonwealth v Inspectorate) where the High Court adopted (at [55]) the observations of French J in Trade Practices Commission v CSR Limited (1991) ATPR ¶41-076 at 52,152. Among other things, deterrence requires the Court to fix a penalty which is not “regarded by [the] offender or others as an acceptable cost of doing business” (see Construction, Forestry, Mining and Energy Union v Decmil Engineering Pty Ltd (No 2) [2017] FCA 1237 at [38] and the cases cited there). Otherwise the principles bearing on the assessment of an appropriate penalty under the FWA are well settled. A relatively recent example is Director of the Fair Work Building Industry Inspectorate v Construction, Forestry, Mining and Energy Union [2015] FCA 353 where Tracey J conveniently summarised those principles at [66]–[73]. I have had regard to these principles in assessing the appropriate penalty in this matter.CONSIDERATION I turn now to consider, in turn, the four issues set out above.(a) The number of contraventions On this first issue, relying on the Full Court decision in Construction, Forestry, Mining and Energy Union v Williams (2009) 262 ALR 417; [2009] FCAFC 171, the CFMMEU contended that the conduct of its human agents, Mr Ravbar and Mr Sutherland, which was attributed to the CFMMEU under s 793, was so closely interconnected in time, place and purpose that it should be regarded as forming part of the same transaction, or course of conduct, such that whilst separate penalties should be imposed on the CFMMEU, the notional maximum of those should equate to that of one penalty. In response, the Commissioner contended that their conduct was sufficiently disparate to justify two penalties being imposed. The authorities relating to the course of conduct principle are discussed at length in Parker at [267]–[288]. As that discussion discloses, the critical question is whether the contraventions concerned involved common legal and factual elements reflecting the same criminality or, in this context, wrongdoing. As is already mentioned above, the two contraventions central to this issue were founded on the conduct of Mr Ravbar and Mr Sutherland that was attributed to the CFMMEU under s 793 of the FWA. This is important because it is apparent from the declarations made with respect to the contraventions associated with the third Port Connect incident (see at [1] above) that the CFMMEU’s contravention involving Mr Ravbar related to him giving the “Ravbar Direction” (see at [1(14)] above) and the contravention involving Mr Sutherland related to “the Sutherland Conduct” (see at [1(17)] above). The former expression is defined in the orders to mean “in or about October 2012 … directing organisers employed by [the CFMMEU] to follow the Universal Cranes cranes from the Universal Cranes yard to see where they were going, and to stop them from operating when they arrived at their destination” (see at [1(7)] above). As the liability judgment shows, this direction was given at an organiser’s meeting held at the CFMMEU offices in Bowen Hills, Brisbane on the day before the third Port Connect incident. It therefore involved a direction to act rather than the action itself.