Application by Energex Limited (No 2)

Case [2010] ACompT 7


AUSTRALIAN COMPETITION TRIBUNAL

Application by Energex Limited (No 2) [2010] ACompT 7

Citation: Application by Energex Limited (No 2) [2010] ACompT 7
Review from: Australian Energy Regulator
Parties:

ENERGEX LIMITED (ACN 078 849 055)

ERGON ENERGY CORPORATION LIMITED
(ACN 078 646 062)

ETSA UTILITIES (ABN 13 332 330 749)

File number(s): 2 of 2010
3 of 2010
4 of 2010
Members: MIDDLETON J (DEPUTY PRESIDENT),
MR R DAVEY AND MR R SHOGREN
Date of delivery of Reasons: 13 October 2010
Date of hearing: 13, 14, 15, 16, 17, 20 and 21 September 2010
Place: Melbourne
Category: No Catchwords
Number of paragraphs: 151
Counsel for Energex Limited: Mr S Doyle SC with Mr Pomerenke
Solicitor for Energex Limited: Allens Arthur Robinson
Counsel for Ergon Energy Corporation Limited: Mr P O’Shea SC with Mr Bradley
Solicitor for Ergon Energy Corporation Limited: Minter Ellison Lawyers
Counsel for ETSA Utilities: Ms M Sloss SC with Mr CA Moore and Mr M Borsky
Solicitor for ETSA Utilities: Gilbert + Tobin
Counsel for Australian Energy Regulator: Mr P Hanks QC with Mr Gray, Ms R Ellyard, Mr T Clarke and Mr L Merrick
Solicitor for Australian Energy Regulator: Corrs Chambers Westgarth

IN THE AUSTRALIAN COMPETITION TRIBUNAL

File No 2 of 2010

RE:

APPLICATION UNDER SECTION 71B OF THE NATIONAL ELECTRICITY LAW FOR A REVIEW OF A DISTRIBUTION DETERMINATION MADE BY THE AUSTRALIAN ENERGY REGULATOR IN RELATION TO ENERGEX LIMITED PURSUANT TO CLAUSE 6.11.1 OF THE NATIONAL ELECTRITICY RULES

BY:

ENERGEX LIMITED (ACN 078 849 055)
Applicant

File No 3 of 2010
RE:

APPLICATION UNDER SECTION 71B OF THE NATIONAL ELECTRICITY (QUEENSLAND) LAW FOR A REVIEW OF A DISTRIBUTION DETERMINATION MADE BY THE AUSTRALIAN ENERGY REGULATOR IN RELATION TO ERGON ENERGY CORPORATION LIMITED PURSUANT TO CLAUSE 6.11.1 OF THE NATIONAL ELECTRICITY RULES

BY:

ERGON ENERGY CORPORATION LIMITED
(ACN 078 646 062)
Applicant

File No 4 of 2010
RE:

APPLICATION UNDER SECTION 71B OF THE NATIONAL ELECTRICITY LAW FOR A REVIEW OF A DISTRIBUTION DETERMINATION MADE BY THE AUSTRALIAN ENERGY REGULATOR IN RELATION TO ETSA UTILITIES PURSUANT TO CLAUSE 6.11.1 OF THE NATIONAL ELECTRITICY RULES

BY:

ETSA UTILITIES (ABN 13 332 330 749)
Applicant

MEMBERS:

MIDDLETON J (DEPUTY PRESIDENT),
MR R DAVEY AND MR R SHOGREN

DATE OF PUBLICATION OF REASONS FOR DECISION:

13 OCTOBER 2010

WHERE MADE:

MELBOURNE

REASONS FOR DECISION

INTRODUCTION

  1. Each applicant is:

    (a)the owner and operator of an electricity distribution network; and

    (b)registered as a distribution network service provider (DNSP) under the National Electricity Rules (the ‘Rules’).

  2. The Australian Energy Regulator (the ‘AER’):

    (a)is responsible for the economic regulation of distribution services provided by means of, or in connection with, distribution systems that form part of the national grid; and

    (b)must make a distribution determination for each distribution network service provider and, in doing so, must follow the process set out in Part E of Chapter 6 of the Rules. 

  3. In May 2010, the AER for each applicant made a distribution determination for the period 2010-11 to 2014-15 (the ‘distribution determinations’).

  4. Each distribution determination…

Continue reading Application by Energex Limited (No 2)

Sign in free to access the full text

Details
AGLC
Application by Energex Limited (No 2) [2010] ACompT 7
Case
[2010] ACompT 7
Decision Date

CaseChat Overview and Summary

The Australian Competition Tribunal considered an application by Energex Limited for review of a distribution determination made by the Australian Energy Regulator (AER) under the National Electricity Law. The determination regulated the charges that Energex could impose for the provision of electricity distribution services. Energex argued that the AER erred in determining the value of one component of the formula used to estimate the cost of corporate income tax, known as gamma. The Tribunal found that the AER erred in its estimation of the distribution ratio, one of the two parameters from which gamma is derived. The Tribunal also found that the AER erred in its approach to estimating the utilisation rate, the other parameter from which gamma is derived. The Tribunal concluded that the AER's approach to estimating the utilisation rate was illogical and arbitrary, rendering the decision unreasonable. The Tribunal ordered the AER to provide a report addressing the errors found and further comments of the Tribunal. The Tribunal proposed directions for the AER to seek a re-estimation of the parameters from a newly-commissioned dividend drop-off study that is "state of the art". The Tribunal also requested the AER to provide relevant extrinsic material explaining the rationale for including the gamma component in the formula for calculating the estimated cost of corporate income tax and how it relates to the rest of the building blocks.

Orders

Orders of the court

Full text does not contain this section.

Background

Background to the litigation

Full text does not contain this section.

Evidence

Evidence Before The Court

Full text does not contain this section.

Decision

Reasons for decision

Full text does not contain this section.

Ratio Decidendi

Legal Principle Established

Full text does not contain this section.