Vector Limited v Electricity Authority

Link copied
Case Copied 13 min read

IN THE HIGH COURT OF NEW ZEALAND WELLINGTON REGISTRY

CIV 2015-485-754 [2015] NZHC 2959

UNDER the Electricity Industry Act 2010

IN THE MATTER

of an appeal under section 64 of the Electricity Industry Act 2010 against a determination of the Electricity Authority

BETWEEN

VECTOR LIMITED Appellant

AND

THE ELECTRICITY AUTHORITY Respondent

Hearing: 19 November 2015

Counsel:

B A Scott and E G Thomson for Appellant
L O'Gorman for Respondent

Judgment:

25 November 2015

JUDGMENT OF BROWN J

[1]      The appellant (Vector) seeks an order under s 64 of the Judicature Act 1908 that  its  notice of  appeal  dated 9  October 2015  (the Exemption Appeal)  from  a determination of the Electricity Authority (the Authority) dated 11 September 2015 be transferred to the Court of Appeal in order that it may be heard together with Vector’s   appeal   from   the   High   Court   judgment   Vector   Ltd   v   Transpower

New Zealand Ltd.1

[2]      The Authority, which has been joined as a respondent to the appeal under r 4.56 of the High Court Rules, supports the application.

1      Vector Ltd v Transpower New Zealand Ltd [2014] NZHC 3411.

VECTOR LTD v THE ELECTRICITY AUTHORITY [2015] NZHC 2959 [25 November 2015]

Context

The NAaN grid upgrade project

[3]      In 2009, the Electricity Commission approved a grid upgrade proposed by Transpower New Zealand Ltd (Transpower) for the connection and installation of a new underground high voltage transmission cable link between Pakuranga and Albany.  This project was known as the North Auckland and Northland (NAaN) grid upgrade project.

[4]      This  appeal  relates  to  one section  of the NAaN project,  which  involved constructing an interconnection cable linking Penrose with Albany.  The cable was built in three sections, with new grid exit points at Hobson Street and Wairau Road. It appears that these new assets were always intended to be interconnection assets and the project was approved by what is now the Authority on that basis.

[5]      The  original  project  plan  for  the  construction  and  commissioning  of  the NAaN project would have involved all sections of the cable being commissioned at essentially the same time.  The Albany to Wairau Road section was completed and able to be commissioned on time in May 2013.  However delays with other parts of the project meant that it was some nine months before the project as a whole was completed in February 2014 and the balance of the cable was commissioned.

[6]      For  various  engineering  and  operational  reasons Transpower  preferred  to commission the first section of the new cable (the Albany to Wairau Road section) when construction of that section was completed in May 2013.  Vector agreed to the early commissioning and connected its network to the Wairau Road grid exit point as part  of that  commissioning process.    In  doing  so, Vector  and Transpower were unaware that this may alter how Vector was charged for use of this asset.

[7]      After Vector had connected, Transpower formed the view that the early commissioning of this section of the cable before the remainder of the…

CaseChat AU logo

Keep reading for free

Create a free CaseChat account to read Vector Limited v Electricity Authority and more:

  • Read every judgment in full
  • Ask AI and get answers linked to paragraphs
  • See how each paragraph was cited in later cases
  • Download judgments as PDF or Word
Continue with Google

One click creates your free account or signs you in.

By continuing you agree to the Terms and Privacy Policy.

Details
Case
[2015] NZHC 2959
Decision Date

CaseChat Overview and Summary

Vector Limited sought to appeal a determination by the Electricity Authority regarding an exemption from certain pricing rules under the Transmission Pricing Methodology (TPM). The dispute arose from the interpretation and application of the TPM in the context of the North Auckland and Northland (NAaN) grid upgrade project. Vector argued that the Authority had misinterpreted the TPM and erred in law by not granting an exemption that would have affected how certain assets were charged under the TPM. The legal issues revolved around the scope of the Authority's exemption power and the interpretation of the TPM.

The court considered whether the Exemption Appeal should be transferred to the Court of Appeal to be heard concurrently with Vector’s appeal from the High Court judgment. The court examined whether the circumstances of the Exemption Appeal were exceptional, considering factors such as the importance of the legal issues, the efficiency of resource use, and the need for a prompt and final determination. While the court acknowledged the significance of the issues and the potential overlap with the Vector appeal, it concluded that the Exemption Appeal involved distinct legal matters that required a reasoned judgment from the High Court before being considered by the Court of Appeal. The court declined the application for transfer, finding that the Exemption Appeal should first be determined by the High Court.

Orders

Orders of the court

Full text does not contain this section.

Background

Background to the litigation

Full text does not contain this section.

Evidence

Evidence Before The Court

Full text does not contain this section.

Decision

Reasons for decision

Full text does not contain this section.

Ratio Decidendi

Legal Principle Established

Full text does not contain this section.