Novawest Contracting Pty Ltd v Brimbank City Council

Link copied
Case Copied 12 min read
IN THE SUPREME COURT OF VICTORIA Not Restricted

AT MELBOURNE

COMMERCIAL AND EQUITY DIVISION

TECHNOLOGY ENGINEERING AND CONSTRUCTION LIST

S CI 2013 05648

NOVAWEST CONTRACTING PTY LTD (RECEIVER AND MANAGER APPOINTED) (ACN 056 379 929) Plaintiff/First Defendant by Counterclaim
v  
BRIMBANK CITY COUNCIL Defendant/Plaintiff by Counterclaim
and
HYDER CONSULTING PTY LIMITED
(ACN 104 485 289)
Second Defendant by Counterclaim

---

JUDGE:

VICKERY J

WHERE HELD:

Melbourne

DATE OF HEARING:

17 November 2015

DATE OF JUDGMENT:

17 November 2015

CASE MAY BE CITED AS:

Novawest Contracting v Brimbank City Council

MEDIUM NEUTRAL CITATION:

[2015] VSC 679

---

ARBITRATION – Domestic arbitration – Referral to arbitration – Stay of proceedings pursuant to arbitration agreement – Whether arbitration agreement inoperative or incapable of being performed – Difficulty or impossibility of identifying loss or damage before litigation is concluded – Decision of the High Court of Singapore in Sembawang Engineers and Constructors Pte Ltd v Covec (Singapore) Pte Ltd [2008] SGHC 229 followed – Commercial Arbitration Act 2011 (Vic), s 8.

---

APPEARANCES:

Counsel Solicitors
For the Plaintiff/First Defendant
by Counterclaim
Mr D Triaca Madgwicks Lawyers
For the Defendant/Plaintiff
by Counterclaim
Mr M H Whitten Russell Kennedy
For the Second Defendant by Counterclaim Mr J M Shaw Holman Fenwick Willan

HIS HONOUR:

  1. There are two applications before the Court. 

  1. The first is an application by Brimbank City Council, the Defendant and Plaintiff by Counterclaim (‘BCC’), for leave to further amend the defence and counterclaim. There is no challenge made to that application by any party.  I grant leave to amend the defence and counterclaim in the form of the Further Amended Defence and Amended Counterclaim dated 18 August 2015.

  1. The second is an application by Arcadis Australia Pacific Pty Ltd (formerly known as Hyder Consulting Pty Ltd), the Second Defendant by Counterclaim (‘Hyder’), under s 8 of the Commercial Arbitration Act 2011 (Vic) that certain matters set out in the Further Amended Defence and Amended Counterclaim dated 18 August 2015 be referred to arbitration. For the reasons that follow I will order that the matters set out in paragraphs [80] to [85] of the Further Amended Defence and Amended Counterclaim dated 18 August 2015 be referred to arbitration in accordance with Clause 15 of the contract between BCC and Hyder dated 19 August 2005 (the ‘BCC-Hyder Contract’).

Factual background

  1. The events that have led to these applications can be summarised as follows.

  1. On or about 19 August 2005, Hyder entered into a contract with BCC (the ‘BCC-Hyder Contract’) by which it was engaged to provide design, tender documentation and contract administration services to BCC in connection with the renewal of urban infrastructure in the North Sunshine Industrial Area. The BCC-Hyder Contract incorporated the provisions of Australian Standard AS4122-2000.

  1. In or about December 2007, the Plaintiff, Novawest Contracting Pty Ltd (‘Novawest’) entered into a contract with BCC for the construction of road, drainage and other services for Stage 2 of the North Sunshine Industrial Estate (the ‘Stage 2 Contract’).

  1. In or about November 2008, Novawest…

CaseChat AU logo

Keep reading for free

Create a free CaseChat account to read Novawest Contracting Pty Ltd v Brimbank City Council and more:

  • Read every judgment in full
  • Ask AI and get answers linked to paragraphs
  • See how each paragraph was cited in later cases
  • Download judgments as PDF or Word
Continue with Google

One click creates your free account or signs you in.

By continuing you agree to the Terms and Privacy Policy.

Details
Case
[2015] VSC 679
Decision Date

CaseChat Overview and Summary

Novawest Contracting Pty Ltd, a company engaged in the construction industry, initiated legal proceedings against Brimbank City Council, a local government body, over a construction contract dispute. The case came before the Supreme Court of Victoria, where the primary issue was whether the court should stay the proceedings in favour of arbitration, as stipulated in the contract between the parties. The crux of the matter lay in determining the validity and enforceability of the arbitration clause in the contract, specifically whether it was inoperative or incapable of being performed due to the difficulty or impossibility of identifying the loss or damage before the litigation was concluded.

The court examined the relevant provisions of the Commercial Arbitration Act 2011 (Vic) and considered the decision of the High Court of Singapore in Sembawang Engineers and Constructors Pte Ltd v Covec (Singapore) Pte Ltd [2008] SGHC 229. The court found that the arbitration agreement was not inoperative or incapable of being performed, as the difficulty or impossibility of identifying the loss or damage did not render the agreement unenforceable. Instead, the court held that the arbitration clause remained valid and enforceable, and the proceedings should be stayed in favour of arbitration as per the agreement.

In light of the above, the Supreme Court of Victoria decided to stay the proceedings and referred the matter to arbitration in accordance with the terms of the contract. The court's decision was based on the premise that the arbitration agreement was valid and enforceable, and the difficulty or impossibility of identifying the loss or damage before the conclusion of litigation did not affect the enforceability of the agreement. The court followed the precedent set by the High Court of Singapore in Sembawang Engineers and Constructors Pte Ltd v Covec (Singapore) Pte Ltd and applied the relevant provisions of the Commercial Arbitration Act 2011 (Vic).