| IN THE SUPREME COURT OF VICTORIA | Not Restricted |
AT MELBOURNE
COMMERCIAL AND EQUITY DIVISION
TECHNOLOGY ENGINEERING AND CONSTRUCTION LIST
S CI 2013 05648
| NOVAWEST CONTRACTING PTY LTD (RECEIVER AND MANAGER APPOINTED) (ACN 056 379 929) | Plaintiff/First Defendant by Counterclaim |
| v | |
| BRIMBANK CITY COUNCIL | Defendant/Plaintiff by Counterclaim |
| and | |
| HYDER CONSULTING PTY LIMITED (ACN 104 485 289) | Second Defendant by Counterclaim |
---
JUDGE: | VICKERY J |
WHERE HELD: | Melbourne |
DATE OF HEARING: | 17 November 2015 |
DATE OF JUDGMENT: | 17 November 2015 |
CASE MAY BE CITED AS: | Novawest Contracting v Brimbank City Council |
MEDIUM NEUTRAL CITATION: | [2015] VSC 679 |
---
ARBITRATION – Domestic arbitration – Referral to arbitration – Stay of proceedings pursuant to arbitration agreement – Whether arbitration agreement inoperative or incapable of being performed – Difficulty or impossibility of identifying loss or damage before litigation is concluded – Decision of the High Court of Singapore in Sembawang Engineers and Constructors Pte Ltd v Covec (Singapore) Pte Ltd [2008] SGHC 229 followed – Commercial Arbitration Act 2011 (Vic), s 8.
---
APPEARANCES: | Counsel | Solicitors |
| For the Plaintiff/First Defendant by Counterclaim | Mr D Triaca | Madgwicks Lawyers |
| For the Defendant/Plaintiff by Counterclaim | Mr M H Whitten | Russell Kennedy |
| For the Second Defendant by Counterclaim | Mr J M Shaw | Holman Fenwick Willan |
HIS HONOUR:
There are two applications before the Court.
The first is an application by Brimbank City Council, the Defendant and Plaintiff by Counterclaim (‘BCC’), for leave to further amend the defence and counterclaim. There is no challenge made to that application by any party. I grant leave to amend the defence and counterclaim in the form of the Further Amended Defence and Amended Counterclaim dated 18 August 2015.
The second is an application by Arcadis Australia Pacific Pty Ltd (formerly known as Hyder Consulting Pty Ltd), the Second Defendant by Counterclaim (‘Hyder’), under s 8 of the Commercial Arbitration Act 2011 (Vic) that certain matters set out in the Further Amended Defence and Amended Counterclaim dated 18 August 2015 be referred to arbitration. For the reasons that follow I will order that the matters set out in paragraphs [80] to [85] of the Further Amended Defence and Amended Counterclaim dated 18 August 2015 be referred to arbitration in accordance with Clause 15 of the contract between BCC and Hyder dated 19 August 2005 (the ‘BCC-Hyder Contract’).
Factual background
The events that have led to these applications can be summarised as follows.
On or about 19 August 2005, Hyder entered into a contract with BCC (the ‘BCC-Hyder Contract’) by which it was engaged to provide design, tender documentation and contract administration services to BCC in connection with the renewal of urban infrastructure in the North Sunshine Industrial Area. The BCC-Hyder Contract incorporated the provisions of Australian Standard AS4122-2000.
In or about December 2007, the Plaintiff, Novawest Contracting Pty Ltd (‘Novawest’) entered into a contract with BCC for the construction of road, drainage and other services for Stage 2 of the North Sunshine Industrial Estate (the ‘Stage 2 Contract’).
In or about November 2008, Novawest…
Keep reading for free
Create a free CaseChat account to read Novawest Contracting Pty Ltd v Brimbank City Council and more:
- Read every judgment in full
- Ask AI and get answers linked to paragraphs
- See how each paragraph was cited in later cases
- Download judgments as PDF or Word
One click creates your free account or signs you in.
By continuing you agree to the Terms and Privacy Policy.
- Case
- [2015] VSC 679
- Decision Date
CaseChat Overview and Summary
The court examined the relevant provisions of the Commercial Arbitration Act 2011 (Vic) and considered the decision of the High Court of Singapore in Sembawang Engineers and Constructors Pte Ltd v Covec (Singapore) Pte Ltd [2008] SGHC 229. The court found that the arbitration agreement was not inoperative or incapable of being performed, as the difficulty or impossibility of identifying the loss or damage did not render the agreement unenforceable. Instead, the court held that the arbitration clause remained valid and enforceable, and the proceedings should be stayed in favour of arbitration as per the agreement.
In light of the above, the Supreme Court of Victoria decided to stay the proceedings and referred the matter to arbitration in accordance with the terms of the contract. The court's decision was based on the premise that the arbitration agreement was valid and enforceable, and the difficulty or impossibility of identifying the loss or damage before the conclusion of litigation did not affect the enforceability of the agreement. The court followed the precedent set by the High Court of Singapore in Sembawang Engineers and Constructors Pte Ltd v Covec (Singapore) Pte Ltd and applied the relevant provisions of the Commercial Arbitration Act 2011 (Vic).