QUEENSLAND CIVIL AND
ADMINISTRATIVE TRIBUNAL
CITATION:
Marlken Pty Ltd v Scott [2019] QCAT 195
PARTIES:
MARLKEN PTY LTD
(applicant)v CELESTE SCOTT
(respondent)
APPLICATION NO/S:
BDL037-19
MATTER TYPE:
Building matters
DELIVERED ON:
9 July 2019
HEARING DATE:
20 June 2019
HEARD AT:
Brisbane
DECISION OF:
Member Cranwell
ORDERS:
1. The application filed on 6 February 2019 is dismissed.
2. By consent:
(a) Marlken Pty Ltd is to give to Celeste Scott further amended engineering drawings and a related Form 15 to reflect the dwelling as constructed within 28 days of the date of these orders.
(b) Marlken Pty Ltd is to give to Celeste Scott an amended energy efficiency assessment report to reflect the dwelling as constructed within 28 days of the date of these orders.
3. The counter-application filed on 1 April 2019 is otherwise dismissed.
CATCHWORDS:
CONTRACTS – BUILDING, ENGINEERING AND RELATED CONTRACTS – PERFORMANCE OF WORK – REMEDIES FOR BREACH OF CONTRACT – where final instalment outstanding – where home owner seeking certificates
APPEARANCES & REPRESENTATION:
Applicant:
Self-represented
Respondent:
Self-represented
REASONS FOR DECISION
Ms Scott entered into a building contract with Marlken Pty Ltd (‘Marlken’) on 2 July 2018.
The contract describes the building to be built as:
Panelform Gable Roof Dwelling + 1 Awning
An annexure to the contract provides:
Front awning – engineering only – no allowance for supply or build
The contact also attached plans of the dwelling. These plans include an awning.
While there is some dispute about which pages of the contract were provided to
Ms Scott at the time of signing, the pages referred to above all bear her signature.
Although not expressly stated in the contract, it is not in dispute that the contract was for construction of the dwelling to lock-up stage only.
It appears that Ms Scott requested a number of changes to the plans, including the addition of further windows. Revised frame plans were sent by Marlken to Ms Scott on 13 September 2018.
Ms Scott responded by email on 13 September 2018 as follows:
That looks absa-bloody-lutely fantastic Marls.
If all your measurements are as per Bruce’s sketch with frame sizes and those measurements we went thru the other day are all factored in, which they all appear to be … then it’s a big fat chubby double thumbs up from me.
This appears to have been the high point in relations between the parties.
Application by Marlken
Marlken seeks payment by Ms Scott of $4,005. This is stated to be the outstanding payment for works performed under the contract.
The only evidence led by Marlken was three statements of Marleen Best, dated
26 March 2019, 26 April 2019 and 27 May 2019. In her statement dated 26 March 2019, Mrs Best stated that Marlken had completed its contractual side of the works.
Other than Mrs Best’s assertion, there is no evidence before me that would enable me to be satisfied that Marlken has completed the…
Continue reading Marlken Pty Ltd v Scott
Sign in free to access the full text
- AGLC
- Marlken Pty Ltd v Scott [2019] QCAT 195
- Case
- [2019] QCAT 195
- Decision Date
CaseChat Overview and Summary
The primary legal issues the court had to address were whether the applicant was obligated to provide the respondent with the necessary certificates and amended documents, and if the respondent was entitled to withhold the final instalment of payment until these documents were provided. The court needed to determine if the applicant's failure to provide the documents constituted a breach of contract and if withholding payment was a permissible remedy under the circumstances.
The court examined the contractual obligations between the parties, including the terms of the contract regarding the provision of documents and the completion of the project. It was noted that the applicant had not provided the required documents within the agreed timeframe. However, the court found that the respondent's withholding of the final payment was not justified as it did not align with the contractual terms and did not reflect the actual condition of the completed dwelling. The court also emphasised the importance of providing accurate documentation to reflect the work as performed. Consequently, the court dismissed the application to enforce the payment and ordered the applicant to provide the necessary documents within the stipulated timeframe. The counter-application was also dismissed with no orders made in its favour.
Orders
Orders of the court
1. The application filed on 6 February 2019 is dismissed.
2. By consent:
(a) Marlken Pty Ltd is to give to Celeste Scott further amended engineering drawings and a related Form 15 to reflect the dwelling as constructed within 28 days of the date of these orders.
(b) Marlken Pty Ltd is to give to Celeste Scott an amended energy efficiency assessment report to reflect the dwelling as constructed within 28 days of the date of these orders.
3. The counter-application filed on 1 April 2019 is otherwise dismissed.
Background
Background to the litigation
Full text does not contain this section.
Evidence
Evidence Before The Court
Full text does not contain this section.
Decision
Reasons for decision
Full text does not contain this section.
Ratio Decidendi
Legal Principle Established
Full text does not contain this section.