FEDERAL COURT OF AUSTRALIA

Lend Lease Project Management & Construction (Australia) Pty Ltd v Construction, Forestry, Mining and Energy Union (No 5) [2012] FCA 1144

Citation: Lend Lease Project Management & Construction (Australia) Pty Ltd v Construction, Forestry, Mining and Energy Union (No 5) [2012] FCA 1144
Parties:

LEND LEASE PROJECT MANAGEMENT & CONSTRUCTION (AUSTRALIA) PTY LTD v CONSTRUCTION, FORESTRY, MINING AND ENERGY UNION & ORS

LEND LEASE PROJECT MANAGEMENT & CONSTRUCTION (AUSTRALIA) PTY LTD v CONSTRUCTION, FORESTRY, MINING AND ENERGY UNION

DIRECTOR, FAIR WORK BUILDING INDUSTRY INSPECTORATE v CONSTRUCTION, FORESTRY, MINING AND ENERGY UNION & ORS

File number(s): QUD 79 of 2011
QUD 110 of 2011
QUD 126 of 2011
Judge: COLLIER J
Date of judgment: 19 October 2012
Catchwords: INDUSTRIAL LAW – industrial conflict between contractor and unions on major construction projects – two applications commenced against unions and individual members of unions by principal contractor – further application commenced against unions by Director, Fair Work Building Industry Inspectorate – respondents admitted unlawful industrial action in breach of ss 36(1), 37 and 38 Building and Construction Industry Improvement Act 2005 (Cth) – agreement of parties as to facts, injunctive relief, imposition of penalties on respondents and quantum of penalties – admission of significant effect on projects and significant loss and damage suffered by principal contractor – undertakings offered by respondents to refrain from further industrial action – whether Court should give effect to agreement – principles relevant to imposition by Court of agreed penalties
Legislation: Building and Construction Industry Improvement Act 2005 (Cth) ss 36, 37, 38, 39, 48(2), 49, 69, 73
Building and Construction Industry Improvement Amendment (Transition to Fair Work) Act 2012 (Cth) Item 51 of Sch 1
Crimes Act 1914 (Cth) s 4AA(1)
Fair Work Act 2009 (Cth) ss 417, 421, 500, 545, 546
Federal Court of Australia Act 1976 (Cth) ss 23, 32
Building and Construction Industry Improvement Amendment (Transition to Fair Work) Regulation 2012 (Cth) s 2.3
Cases cited: Alfred v Construction, Forestry, Mining and Energy Union [2011] FCA 556 cited
Australian Building & Construction Commissioner v Construction, Forestry, Mining and Energy Union (No 2) [2010] FCA 977 cited
Construction, Forestry, Mining and Energy Union v Abigroup Contractors [2012] FCA 1134 cited
Hardwick v Australian Manufacturing Workers’ Union (2010) FCA 818 cited
Minister for Industry, Tourism and Resources v Mobil Oil Australia Pty Ltd (2004) ATPR 41-993 cited
NW Frozen Foods Pty Ltd v Australian Competition and Consumer Commission (1996) 71 FCR 285 cited
Ponzio v B & P Caelli Constructions Pty Ltd (2007) 158 FCR 543 cited
White v Construction, Forestry, Mining and Energy Union [2011] FCA 192 cited
Woodside Burrup Pty Ltd v Construction, Forestry, Mining and Energy Union [2011] FCA 949 cited
Date of hearing: 1 February 2012
Date of final submissions: 19 October 2012
Place: Brisbane
Division: FAIR WORK DIVISION
Category: Catchwords
Number of paragraphs: 49
QUD 79 of 2011 and QUD 110 of 2011
Counsel for the Applicant: Mr MJ Kimber SC with Mr T Saunders
CaseChat AU logo

Keep reading for free

Create a free CaseChat account to read Lend Lease Project Management & Construction (Australia) Pty... and more:

  • Read every judgment in full
  • Ask AI and get answers linked to paragraphs
  • See how each paragraph was cited in later cases
  • Download judgments as PDF or Word
Continue with Google

One click creates your free account or signs you in.

By continuing you agree to the Terms and Privacy Policy.

Details
Case
[2012] FCA 1144
Decision Date

CaseChat Overview and Summary

Lend Lease Project Management & Construction (Australia) Pty Ltd initiated proceedings against the Construction, Forestry, Mining and Energy Union and other respondents, alleging unlawful industrial action in breach of the Building and Construction Industry Improvement Act 2005 (Cth). The respondents admitted to the breaches and the parties reached an agreement on the quantum of penalties and the terms of injunctive relief. The court was required to decide whether to give effect to the agreement, considering the principles relevant to the imposition of penalties by the court.

The court noted that while the imposition of penalties was ultimately a judicial task, it should give weight to any agreement reached by the parties regarding penalties. The court also considered the purpose of penalties, which include punishment, deterrence, and rehabilitation. The court found that the agreed penalties were within the permissible range, and neither manifestly excessive nor manifestly inadequate, having regard to the conduct in question. The court further noted that the total amount of the penalties agreed by the parties was appropriate. The court also considered the injunctive relief and bank guarantee offered by the respondents and invited the parties to make further submissions in relation to those issues.

The court ordered that a total penalty of $550,000 be imposed on the first, fourth, and fifth respondents, with the penalty to be paid to Lend Lease. Penalties of varying amounts were imposed on the individual respondents, with the penalties to be paid to the Commonwealth. The court also ordered that the parties file written submissions in respect of undertakings and injunctions and adjourned the proceedings for argument concerning undertakings and injunctions. Each party was ordered to pay its own costs of the proceedings.

Orders

Orders of the court

1. A total penalty of $550,000 be imposed on the first respondent (CFMEU), in proceedings QUD 79 of 2011, QUD 110 of 2011 and QUD 126 of 2011, the fourth respondent (CFMEU (Qld)) in proceedings QUD 79 of 2011, and the fifth respondent (CEPU) in proceedings QUD 79 of 2011 and QUD 126 of 2011 in respect of their contraventions of the Building and Construction Industry Improvement Act 2005 (Cth) (“BCII Act”).

2. The CFMEU, CFMEU (Qld) and CEPU are jointly and severally liable for the $550,000 penalty specified in Order 1.

3. Pursuant to s 49(5) of the BCII Act, the penalty specified in Order 1 be paid to Lend Lease Project Management & Construction (Australia) Pty Ltd (Lend Lease) within 60 days of the date on which these orders are made.

4. A penalty of $6,450 be imposed on the second respondent (Pearson) in proceedings QUD 126 of 2011 in respect of his contraventions of the BCII Act.

5. The penalty specified in Order 4 be paid to the Commonwealth.

6. A penalty of $6,450 be imposed on the third respondent (Vink) in proceedings QUD 126 of 2011 in respect of his contraventions of the BCII Act.

7. The penalty specified in Order 6 be paid to the Commonwealth.

8. A penalty of $4,300 be imposed on the fourth respondent (O’Doherty) in proceedings QUD 126 of 2011 in respect of his contraventions of the BCII Act.

9. The penalty specified in Order 8 be paid to the Commonwealth.

10. A penalty of $7,750 be imposed on the sixth respondent (Hanna) in proceedings QUD 126 of 2011 in respect of his contraventions of the BCII Act.

11. The penalty specified in Order 10 be paid to the Commonwealth.

12. A penalty of $6,450 be imposed on the seventh respondent (Jarvis) in proceedings QUD 126 of 2011 in respect of his contraventions of the BCII Act.

13. The penalty specified in Order 12 be paid to the Commonwealth.

14. A penalty of $6,450 be imposed on the eighth respondent (Olsen) in proceedings QUD 126 of 2011 in respect of his contraventions of the BCII Act.

15. The penalty specified in Order 14 be paid to the Commonwealth.

16. A penalty of $2,150 be imposed on the ninth respondent (Malone) in proceedings QUD 126 of 2011 in respect of his contraventions of the BCII Act.

17. The penalty specified in Order 16 be paid to the Commonwealth.

18. Each party pay its own costs of the proceedings in QUD 79 of 2011, QUD 110 of 2011 and QUD 126 of 2011.

THE COURT FURTHER ORDERS THAT:

19. The parties file written submissions in respect of undertakings and injunctions in these proceedings by 4.00 pm on 5 November 2012.

20. The proceedings be adjourned to 10.15 am on 8 November 2012 in respect of argument concerning undertakings and injunctions in these proceedings.

Note: Entry of orders is dealt with in Rule 39.32 of the Federal Court Rules 2011.

Background

Background to the litigation

Separate compensatory orders sought against the respondents are not addressed in this judgment.Background I take the background primarily from the Statement of Agreed Facts and Contentions filed by the parties. As I have already noted, Lend Lease was, at all material times, principal contractor in respect of the Law Courts Project and the GCUH Project. In summary, the respondents to QUD 79 of 2011 and QUD 110 of 2011 were unions representing workers engaged in those projects. The respondents to QUD 126 of 2011 were those unions as well as:·employees, officials or organisers of the CFMEU and/or CFMEU (Qld) (Messrs Pearson, Vink, O’Doherty, Hanna, Jarvis and Olsen); and·an employee, official or organiser of the CEPU (Mr Malone). At all material times the Director (or its predecessor, the ABCC) was entitled to bring proceedings and make application for relief sought by operation of s 49 and s 73 of the BCII Act. Lend Lease engaged, at all material times, up to 86 subcontractors to perform building work on the GCUH Project and up to 28 subcontractors to perform building work on the Law Courts Project. Lend Lease also employed workers on both projects who were members of the CFMEU and the CEPU. In 2011, the CFMEU conducted a campaign called “Stop the Sham” which was intended to prevent a practice known as “sham contracting” in the construction industry. An allegation of “sham contracting” contemplates a sub-contractor purporting to engage workers as independent contractors when in reality they are employees of the sub-contractor, with those workers receiving lower wages and fewer entitlements than employees. On 18, 19, 20, 21, 23, 24, 25 and 26 May 2011 employees of Lend Lease at the GCUH site took industrial action. On 24, 25, 26 and 27 May 2011 employees of Lend Lease at the Law Courts site took industrial action. The parties have agreed that this industrial action was variously engaged in and organised by the CFMEU, the CFMEU (Qld) and/or the CEPU, and Messrs Vink, Hanna, Jarvis and Olsen, and was unlawful industrial action in breach of ss 36(1), 37 and 38 of the BCII Act. In particular:·On 18 May 2011 at the GCUH site – unlawful industrial action engaged in and organised by the CFMEU and/or CFMEU (Qld) and Messrs Vink, Hanna, Jarvis and Olsen involved (inter alia) the following elements:oprotests, a meeting of workers (including members of the CFMEU, CFMEU (Qld) and CEPU), departure of those workers from the site and failure of workers to perform work on that day;oa meeting convened and addressed by Messrs Hanna, Olsen, Jarvis and Vink, as well as Mr Michael Ravbar, the State Secretary of the Queensland Construction and General Divisional Branch of the CFMEU; andoa meeting between Messrs Hanna and Ravbar and Lend Lease senior management.·On 19 May 2011 at the GCUH site – unlawful industrial action engaged in and organised by the CFMEU and/or CFMEU (Qld) and Messrs Hanna and Jarvis involved (inter alia):oa meeting of workers (including members of the CFMEU, CFMEU (Qld) and CEPU), departure of those workers from the site and failure of workers to perform work on that day; andomeetings between employees and senior CFMEU officials including Messrs Hanna and Jarvis.·On 20 May 2011 at the GCUH site – unlawful industrial action engaged in and organised by the CFMEU and/or CFMEU (Qld) and Mr Hanna involved (inter alia):oa meeting of workers (including members of the CFMEU, CFMEU (Qld) and CEPU), departure of those workers from the site and failure of workers to perform work on that day; andoa meeting convened and addressed by senior officials of the CFMEU, namely Mr Jamie McQueen and Mr Hanna.·On 21 May 2011 at the GCUH site – unlawful industrial action engaged in and organised by the CFMEU and/or CFMEU (Qld) and Messrs Jarvis and Olsen involved (inter alia):oa meeting of workers (including members of the CFMEU, CFMEU (Qld) and CEPU), departure of those workers from the site and failure of workers to perform work on that day; andoattendance at the GCUH site by delegates and officials from the CFMEU and/or CFMEU (Qld), including Messrs Jarvis and Olsen, and indication by those delegates to the workers that they should leave the site.·On 23 May 2011 at the GCUH site – unlawful industrial action engaged in and organised by the CFMEU and/or CFMEU (Qld) and Mr Hanna involved (inter alia):oa meeting of workers (including members of the CFMEU, CFMEU (Qld) and CEPU), departure of those workers from the site and failure of workers to perform work on that day;oa meeting convened and addressed by delegates and senior officials from the CFMEU and/or CFMEU (Qld), including Messrs Hanna and Ravbar; andoan address by Mr Hanna to workers, including an invitation to sign a petition in relation to the industrial action.·On 24 May 2011 at the GCUH site, unlawful industrial action engaged in and organised by the CFMEU and/or CFMEU (Qld) and Mr Hanna involved (inter alia):oa meeting of workers (including members of the CFMEU, CFMEU (Qld) and CEPU), departure of those workers from the site and failure of workers to perform work on that day; andoan address by Mr Hanna to workers, including an invitation to participate in a convoy that day during work hours that involved driving vehicles from the GCUH site to Brisbane (which occurred).·Similarly on 24 May 2011 at the Law Courts site, unlawful industrial action engaged in and organised by the CFMEU and/or CFMEU (Qld) and Messrs Pearson and O’Doherty involved (inter alia):oa meeting of workers (including members of the CFMEU, CFMEU (Qld) and CEPU), departure of those workers from the site and failure of workers to perform work on that day; andoa meeting convened and addressed by officials from the CFMEU and/or CFMEU (Qld) and/or CEPU.·On 25 May 2011 at the GCUH site, unlawful industrial action engaged in and organised by the CFMEU and/or CFMEU (Qld) and Messrs Hanna and Vink involved (inter alia):oa meeting of workers (including members of the CFMEU, CFMEU (Qld) and CEPU), departure of those workers from the site and failure of workers to perform work on that day; andoa meeting convened and addressed by Messrs Hanna, Ravbar and Vink.·Similarly on 25 May 2011 at the Law Courts site, unlawful industrial action engaged in and organised by the CFMEU and/or CFMEU (Qld) and Mr Pearson involved (inter alia):oa meeting of workers (including members of the CFMEU, CFMEU (Qld) and CEPU), departure of those workers from the site and failure of workers to perform work on that day; andoorganisers for the CFMEU and/or CFMEU (Qld) and Mr Pearson informing workers that there was a strike and they should not be working.·On 26 May 2011 at the GCUH site, unlawful industrial action engaged in and organised by the CFMEU and/or CFMEU (Qld) and Messrs Malone and Jarvis involved (inter alia):oa meeting of workers (including members of the CFMEU, CFMEU (Qld) and CEPU), departure of those workers from the site and failure of workers to perform work on that day;oa meeting convened and addressed by organisers and senior officials from the CFMEU and the CEPU including Messrs Malone, Jarvis and McQueen; andoMr Malone making comments concerning “crossing the picket line”, and Mr Jarvis making comments concerning “the commitment as the union to man this gate…”.·Similarly on 26 May 2011 at the Law Courts site, unlawful industrial action engaged in and organised by the CFMEU and/or CFMEU (Qld) and Messrs Pearson and O’Doherty involved (inter alia):oa meeting of workers (including members of the CFMEU, CFMEU (Qld) and CEPU), departure of those workers from the site and failure of workers to perform work on that day; andoorganisers and delegates for the CFMEU and/or CFMEU (Qld), including Messrs Pearson and O’Doherty and Mr Pat Maher, telling workers who attended for work not to enter the Law Courts site but to attend a meeting at the Roma Street Parklands.·On 27 May 2011 at the Law Courts site, unlawful industrial action engaged in and organised by the CFMEU and/or CFMEU (Qld) and Mr Pearson involved (inter alia):oa meeting of workers (including members of the CFMEU, CFMEU (Qld) and CEPU), departure of those workers from the site and failure of workers to perform work on that day; andoorganisers for the CFMEU and/or CFMEU (Qld), including Mr Pearson, telling workers who attended for work not to enter the Law Courts site but to attend a meeting at the Roma Street Parklands.

Evidence

Evidence Before The Court

Decision

Reasons for decision

In this case penalties at different levels are submitted as appropriate for the unions – which are large and well-funded organisations – and the individual respondents. In my view this is a proper approach. I also note that, in reaching agreement, the parties clearly do not consider that the penalties proposed are such as, in the words of Lander J in Ponzio, “to crush the person upon whom the penalty is imposed or … to make that person a scapegoat”.Penalties: conclusion These proceedings arise from repeated contraventions of the BCII Act, resulting in substantial damage to Lend Lease, in circumstances where the respondents acted in defiance of orders of Fair Work Australia, for reasons which appeared to be of more relevance to a broad campaign than conditions on the particular sites. The penalties upon which the parties have reached agreement are, in relation to the unions, relatively high, but not so in respect of the individual respondents. Indeed, the penalties proposed in respect of the individual respondents are relatively low when considering the maximum penalties which could be imposed in the circumstances. However I am persuaded that the total amount of the penalties agreed by the parties is within the permissible range, and neither manifestly excessive nor manifestly inadequate having regard to the conduct in question. The parties have also consented to the penalties imposed on the unions being paid to Lend Lease, and the penalties imposed on the individual respondents being paid to the Commonwealth. In my view an order pursuant to s 49(5) of the BCII Act that the penalties payable by the unions be paid to Lend Lease is appropriate in light of the damage suffered by Lend Lease as a result of the conduct of those respondents. I note that an order in such terms is consistent with the approach taken by the Court in Woodside Burrup Pty Ltd v Construction, Forestry, Mining and Energy Union [2011] FCA 949 at [116] and [149].Injunctive relief and bank guarantee The unions are prepared to undertake to refrain from (in summary) organising, engaging in or being involved in unlawful industrial action on or in connection with the GCUH Project and the Law Courts Project until the practical completion of those projects. The individual respondents are prepared to undertake to refrain from (in summary) hindering or obstructing third parties entering the relevant sites. In this context, the parties propose that the CFMEU be restrained from organising, engaging in, or being involved in the unlawful industrial action in respect of the project sites, and that the CFMEU provide a bank guarantee in the sum of $150,000 in favour of Lend Lease as security for compliance by the unions with the terms of the agreed undertakings and injunctive relief. Prior to the repeal of Ch 5 and Ch 6 of the BCII Act, where a person contravened a civil penalty provision of that Act, the Court had a broad discretion to make orders it considered appropriate, including injunctions: s 49(1)(c) and s 49(3) BCII Act. The power to grant injunctive relief is also granted by s 23 of the Federal Court Act. Following the recent decision in Abigroup Contractors, however, the power of the Court to make orders for injunctive relief as agreed by the parties in this case is uncertain. Accordingly, I will invite the parties to make further submissions in relation to that issue, as well as the undertakings and bank guarantee offered by the respondents.

Ratio Decidendi

Legal Principle Established

The unions have further agreed to undertake to, in summary, refrain from organising, engaging in or being involved in industrial action in relation to the projects. The individual respondents have also agreed to undertake, in summary, that until the practical completion of the projects, they will not intentionally hinder or obstruct any person legitimately exercising or seeking to exercise a right of entry on to the GCUH site or the Law Courts site.Consideration of penalties The respondents concede breaches of s 38 of the BCII Act, which provides that a person must not engage in unlawful industrial action. Building industry action is unlawful industrial action if:(a)the action is industrially-motivated; and(b)the action is constitutionally-connected action; and(c)the action is not excluded action.(s 37 BCII Act) In this case although the parties have reached agreement in respect of both culpability of the respondents and appropriate sanctions, it is ultimately for the Court to determine both the nature and quantum of any penalties to be imposed on the respondents. It is also clear, however, that the Court should give weight to any agreement reached by the parties as to penalties, and should generally give effect to the agreed penalty provided it falls within the appropriate range: NW Frozen Foods Pty Ltd v Australian Competition and Consumer Commission (1996) 71 FCR 285 at 291 and 298; Ponzio v B & P Caelli Constructions Pty Ltd (2007) 158 FCR 543 at [129]; White v Construction, Forestry, Mining and Energy Union [2011] FCA 192 at [5]. This is particularly so in light of the support given by the Director to the agreed penalty: cf Minister for Industry, Tourism and Resources v Mobil Oil Australia Pty Ltd (2004) ATPR 41-993 at [51] and Hardwick v Australian Manufacturing Workers’ Union (2010) FCA 818 at [13] and [19]. In Australian Building & Construction Commissioner v Construction, Forestry, Mining and Energy Union (No 2) [2010] FCA 977 Barker J summarised general principles relevant to imposition of civil penalties in the following terms:[4] Sentencing (which the imposition of a civil penalty is an instance of) is one of the most, if not the most difficult tasks that judicial officers perform: CFMEU v Williams [2009] FCAFC 171; (2009) 262 ALR 417 (Williams) at [28].[5] The overriding principle is to ensure that the sentence is proportionate to the gravity of the contravening conduct: Attorney-General (SA) v Tichy (1982) SASR 84 at 92-93.[6] The purpose to be served by the imposition of penalties is at least threefold:(1) Punishment, which must be proportionate to the offence and in accordance with prevailing standards;(2) Deterrence, both personal (assessing the risk of re-offending) and general (a deterrent to others who might be likely to offend); and(3) Rehabilitation.See Ponzio v BP Caelli Constructions Pty Ltd [2007] FCAFC 65; (2007) 158 FCR 543 (Ponzio), Lander J at [93]-[94].[7] The task which a sentencing judge is faced with is one of “instinctive synthesis”: Australian Ophthalmic Supplies Pty Ltd v McAlary-Smith [2008] FCAFC 8; (2008) 165 FCR 560 (Australian Ophthalmic Supplies), Gray J at [27] and Graham J [55]. Such a process requires that a court take into account all relevant factors and to arrive at a single result which takes due account of them all: see Wong v The Queen [2001] HCA 64; [2001] HCA 64; (2001) 207 CLR 584 at [74]-[76]; Markarian v The Queen [2005] HCA 25; (2005) 228 CLR 357 (Markarian), Gleeson CJ, Gummow, Hayne and Callinan JJ at [37]-[39]. The penalty must not be so great as to crush the person upon whom the penalty is imposed or reveal the person as a scapegoat: Ponzio at [93] (Lander J); McDonald v R (1994) 48 FCR 555 at 563. The maximum penalty is reserved for only the most serious of contraventions: Markarian at [31]. Proportionality and consistency commonly operate as a final check on the penalty assessed: Australian Ophthalmic Supplies at [53].