Judge v Queensland Building and Construction Commission

Link copied
Case Copied 7 min read

QUEENSLAND CIVIL AND
ADMINISTRATIVE TRIBUNAL


CITATION:

Judge v Queensland Building and Construction Commission [2023] QCAT 252

PARTIES:

JASMINE JUDGE

(applicant)

v

QUEENSLAND BUILDING AND CONSTRUCTION COMMISSION

(respondent)

APPLICATION NO/S:

GAR291-21

MATTER TYPE:

General administrative review matters

DELIVERED ON:

19 June 2023

HEARING DATE:

2 February 2023

HEARD AT:

Townsville

DECISION OF:

Member Pearce

ORDERS:

1.     The decision of the respondent is confirmed. The application is dismissed.

2.     Each party is to bear their own costs.

CATCHWORDS:

CONTRACTS – BUILDING, ENGINEERING AND RELATED CONTRACTS – PERFORMANCE OF WORK – where direction to rectify not given

Queensland Building and Construction Commission Act 1991 (Qld)

Queensland Civil and Administrative Tribunal Act 2009 (Qld)

Statutory Instruments Act 1992 (Qld)

APPEARANCES & REPRESENTATION:

Applicant:

Jasmine Judge, self-represented

Respondent:

Travis Schmitt Counsel for the Queensland Building and Construction Commission

REASONS FOR DECISION

Introduction

  1. These proceedings concern the Commission’s decisions to not give a direction to not give a direction to rectify to John Maxwell Seaforth Gray (The contractor) in relation to work carried out at 16 Sapphire Court, Deeragun. That property is owned by the Applicant. The Applicant says that the Commission erred, and that the Tribunal should set aside that decision.

  2. The decision by the Commission was made on 7 April 2021. The applicant filed their Application on 5 May 2021.

    The Tribunal’s review jurisdiction

  3. The Tribunal has jurisdiction to deal with maters it is empowered to deal with under an enabling Act.[1] In the present matter the enabling Act is the QBCC Act.[2]

    [1]Queensland Civil and Administrative Tribunal Act 2009 (Qld), section 9. (QCAT Act).

    [2]QCAT Act, section 17; QBCC At, sections 86(1)(e) and 86E.

  4. The final orders that can be made by the Tribunal, in exercising its review jurisdiction are as follows:[3]

    (a)The decision is confirmed or amended; or

    (b)The decision is set aside and substituted with the Tribunal’s own decisions; or

    (c)The decimos is set aside and the matter is returned to the Commission to reconsider the decision with Directions the Tribunal considers appropriate.

    [3]QCAT Act Section 24(1).

  5. The Tribunal is required to hear and decide a review of a reviewable decisions by way of a fresh hearing on the merits for the purpose of producing the correct and preferable decision.[4]

    [4]QCAT Act, section 20.

  6. While there is no formal onus of proof in administrative review proceedings, it is settled that the applicant bears a practical burden of adducing evidence sufficient to satisfy the Tribunal that the relief sought should be granted.[5]

  7. A person affected by a reviewable decision may apply to the Tribunal for a review of the decision.[6]

    [6]QBCC Act, section 87.

    Direction to Rectify

  8. A decision to give or not to give a direction to rectify (DTR) is a reviewable decision.[7]

    [7]QBCC Act, section 86(1)(e).

  9. The objects of the QBCC Act include to…

CaseChat AU logo

Keep reading for free

Create a free CaseChat account to read Judge v Queensland Building and Construction Commission and more:

  • Read every judgment in full
  • Ask AI and get answers linked to paragraphs
  • See how each paragraph was cited in later cases
  • Download judgments as PDF or Word
Continue with Google

One click creates your free account or signs you in.

By continuing you agree to the Terms and Privacy Policy.

Details
Case
[2023] QCAT 252
Decision Date

CaseChat Overview and Summary

The case of Judge v Queensland Building and Construction Commission involves the applicant, Judge, who had entered into a construction contract with a contractor. The applicant lodged a complaint against the contractor to the Queensland Building and Construction Commission (Commission) regarding various defects and issues in the renovation work completed on the lower level of the property. The Commission was required to decide whether to require rectification or building work in accordance with the Rectification Policy. The specific issues in dispute included defects in kitchen cupboards and drawers, air-conditioner remotes, painting, locks, and plumbing.

The legal issues before the court were whether the defects and issues identified by the applicant constituted "building work" under the Queensland Building and Construction Commission Act 1996 (QBCC Act). The court had to determine the scope of "building work" and decide if the identified issues fell within that definition. The court also had to consider whether the contractor was responsible for the defects and whether the Commission should require rectification or building work.

The court found that some of the identified issues were not "building work" under the QBCC Act. The court considered the definition of "building work" as provided in the QBCC Act and Schedule 2. It was determined that items such as air-conditioner remote cradles and cleaning were not classified as building work. The court also considered the evidence provided by the contractor and the QBCC report. The court found that some of the defects were due to rough handling and not the contractor's workmanship. The court concluded that the Commission's decision not to issue a Direction to Remedy (DTR) was reasonable and lawful.

The court dismissed the applicant's appeal and affirmed the Commission's decision. The court held that the Commission was correct in its assessment that some of the identified issues were not building work and that the contractor was not responsible for all the defects. The court found that the Commission had exercised its powers reasonably and in accordance with the law.

Orders

Orders of the court

Full text does not contain this section.

Background

Background to the litigation

In deciding whether to require the rectification or building work, the Commission has regard to the Rectification Policy.BACKGROUND DOCUMENTS AND FINDINGS OF FACT At all material times, the Contractor held QBCC Licence no: 1226763 in the classes of “Builder – Low Rise” and “carpentry”. On 17 February 2021, the Commission received a Residential and Commercial Construction Complaint Form and attachments from the Applicant against the contractors. The complaint contained the following relevant information:(a)Applicant entered into a construction contract with the contractor in the amount of $188,452.00.(b)The work under the contract was paid in full and completed on 23 April 2020. Further information in support of the complaint was received via email dated 9 March 2021. The property was inspected on 31 March 2021 by building inspector Kevin Cameron. The building inspector completed a report. ON 7 April 2021 the Commission made a decision not to issue a DTR.The issues in dispute The issues outlined by the applicant are:(a)Kitchen cupboards and drawers need to be fixed and cleaned and crack in ceiling;(b)Issues with air-con remote not fixed to walls, broken switch, dirty toles;(c)Painting contains drips, chips, and blue tags;(d)Lock on bathroom door is broken and vanity mirror is damaged;(e)Lock on toilet door broken and all locks in house s=do not work as they should;(f)Replace laundry cupboard due to faulty install of laundry plumbing. Water damage evident. Laundry plumbing needs to be fixed. Fix seal and paint laundry (space between cupboards on floor). Seal benchtop to wall. Holes in Laundry cupboards not covered.(g)Fit air-con remotes, paint spill and cracks in family/laundry room;(h)Fit air-con remotes and broken bedroom locks;(i)Air-con remotes not fitted to wall;(j)External house not cleaned;(k)Air con remotes not fitted. The applicant withdrew items 10 and 11 at the on-site inspection. It is not in dispute that items 1,3,4,5,6,7,8 is defective building work. The work can be described generally as renovation work to the lower level of an existing property, which constitutes “Building work” under the QBCC Act.[15][15]QBCC Act, Schedule 2. It was found that Items 2 and 9 were not building works. In relation to the kitchen items, in the hearing it was argued that the faults with the kitchen were due to rough handling. The contractor gave evidence that he had fixed the items previously but due to rough handling or the children standing on the lower drawers the draw faces had come off. The QBCC report indicates there was evidence of “screws appeared to be forced out of the housing”. A number of items were found to not be “building work” for example the air-conditioner remote cradles. It was argued that the demolition of the house was completed by an different contractor. This was argued during the hearing. Regardless of the outcome installing the cradles is not building work. Items specified such as cleaning of paint spatters were dealt with simply as not being building works – cleaning is not building works.

Evidence

Evidence Before The Court

Full text does not contain this section.

Decision

Reasons for decision

Full text does not contain this section.

Ratio Decidendi

Legal Principle Established

Full text does not contain this section.