CITATION: Goldfield Projects Pty Ltd v Queensland Building and Construction Commission [2016] QCAT 361
PARTIES: Goldfield Projects Pty Ltd  
(Applicant/Appellant)
v
Queensland Building and Construction Commission   
(Respondent)
APPLICATION NUMBER: GAR460-13
MATTER TYPE: General administrative review matters  
HEARING DATE: 3 and 14 June 2016  
HEARD AT: Brisbane
DECISION OF: Member Traves
DELIVERED ON: 4 October 2016
DELIVERED AT: Brisbane
ORDERS MADE:

1.    The application for review is dismissed.

2.    The decision of the respondent made on 3 December 2013 to issue Direction No 39643 is upheld and widened to include replacement of the waterproofing membrane.

CATCHWORDS:

APPLICATION TO REVIEW - DIRECTION TO RECTIFY – whether building work defective –– whether Direction unfair.

Statutory Instruments Act 1992 (Qld), s 7.
Queensland Civil and Administrative Tribunal Act 2009 (Qld), ss 20, 24.
Queensland Building and Construction Commission Act 1991 (Qld), ss 72, 86, 87.

R v His Honour Judge Miller and Builder’s Registration Board, ex parte Graham Evans and Co (Qld) Pty Ltd [1987] 2 Qd R 446

APPEARANCES: Ms Cheriden Farthing for the QBCC

McKays solicitors for the applicant

REASONS FOR DECISION

Introduction

  1. Goldfield Projects Pty Ltd (Goldfield) seek to review a decision by the Queensland Building and Construction Commission (QBCC) to issue a Direction to Rectify to it in relation to the installation of tiling in two bathrooms.  The direction was issued to Goldfield under cover of a letter dated 3 December 2013.

  2. The bathrooms were part of a new home in Calamvale constructed by Goldfield and completed in November 2012. The owner of the property, Mr Kwok On Cheng (owner), took possession on 17 December 2012.

  3. On 1 October 2013, the QBCC received a complaint form from the owner relating to building work carried out by the applicant at the property.

  4. Relevantly, the complaint referred to the master bathroom and second bathroom. In relation to those rooms the complaint said:

Item Number

Date problem

first noticed

Room/area of the house the complaint item is located

Description of building work and complaint item

1.

29/08/2013

Master bathroom

Water leaked under shower room tiles, water coming from gaps in between tiles.

2.

4/09/2013

Second bathroom

Loose tiles, water leaking from grout/gaps of tiles, grouting coming loose.

  1. An inspection of the property was carried out by a building inspector of the QBCC on 2 December 2013. On the basis of the inspector’s report, the QBCC issued a Direction to Rectify to the applicant in the following terms:

    DIRECTION TO RECTIFY AND/OR COMPLETE No. 39643

    Time period for Completion – (34) days from the date of service of this decision.

    1.The installation of the tiling to the floor of the shower recess to the ensuite bathroom does not comply with The Building Code of Australia 2011 Volume 2 Clause P2.4.1 Wet Areas as the installation has failed allowing the tiles to become drummy and water to be expressed from between the tiles when pressure is applied affecting the functional use of the shower and endangering the health and safety of the Occupants – pertains…

CaseChat AU logo

Keep reading for free

Create a free CaseChat account to read Goldfield Projects Pty Ltd v Queensland Building and Constru... and more:

  • Read every judgment in full
  • Ask AI and get answers linked to paragraphs
  • See how each paragraph was cited in later cases
  • Download judgments as PDF or Word
Continue with Google

One click creates your free account or signs you in.

By continuing you agree to the Terms and Privacy Policy.

Details
Case
[2016] QCAT 361
Decision Date

CaseChat Overview and Summary

In this case, Goldfield Projects Pty Ltd sought to review a decision made by the Queensland Building and Construction Commission. The dispute arose from a Direction issued by the Commission, which required Goldfield Projects to rectify certain building works, specifically concerning the waterproofing membrane. The Commission's Direction was based on the assertion that the building work was defective and required rectification to meet safety and compliance standards. Goldfield Projects challenged the fairness and validity of the Direction, arguing it was not justified.

The primary legal issue the court had to address was whether the building work was indeed defective as claimed by the Commission, and if the Direction was fair and justified. The court had to examine the evidence provided by both parties and determine whether the Commission's findings were reasonable and supported by the evidence. Additionally, the court considered whether the Direction was proportionate and appropriate in the circumstances, and whether it represented an unfair exercise of power by the Commission.

The court found that the Commission's assessment of the building work as defective was supported by the evidence and reasonable. The court further determined that the Direction was fair and justified, as it was necessary to ensure compliance with safety and building standards. The court concluded that the Commission had not acted beyond its powers or unfairly in issuing the Direction. Consequently, the application for review was dismissed, and the Commission's decision to issue the Direction was upheld and widened to include the replacement of the waterproofing membrane.

Orders

Orders of the court

1. The application for review is dismissed.

2. The decision of the respondent made on 3 December 2013 to issue Direction No 39643 is upheld and widened to include replacement of the waterproofing membrane.

Background

Background to the litigation

Full text does not contain this section.

Evidence

Evidence Before The Court

Full text does not contain this section.

Decision

Reasons for decision

Full text does not contain this section.

Ratio Decidendi

Legal Principle Established

Full text does not contain this section.