Goldfield Projects Pty Ltd v Queensland Building and Construction Commission

Link copied
Case Copied 6 min read

CITATION:

Goldfield Projects Pty Ltd v Queensland Building and Construction Commission [2017] QCAT 295

PARTIES:

Goldfield Projects Pty Ltd
(Applicant)

v

Queensland Building and Constuction Commission

(Respondent)

APPLICATION NUMBER:

GAR213-15

MATTER TYPE:

General administrative review matters

HEARING DATE:

On the papers

HEARD AT:

Brisbane

DECISION OF:

Acting Deputy President O’Callaghan

DELIVERED ON:

29 August 2017

DELIVERED AT:

Brisbane

ORDERS MADE:

1.   The Queensland Building and Construction Commission must produce to Goldfield Projects Pty Ltd the documents (to the extent that they exist) referred to in paragraph 3(g) and (i) of the application for miscellaneous matters dated 18 May 2017, or advise the Tribunal and Goldfield Projects Pty Ltd in writing that they do not exist, by 4:00pm on 13 September 2017.

2.   The application is listed for a Directions Hearing in Brisbane on 14 September 2017 at 2:30pm.

CATCHWORDS:

ADMINISTRATIVE LAW – ADMINISTRATIVE TRIBUNALS – QUEENSLAND CIVIL AND ADMINISTRATIVE TRIBUNAL

PROCEDURE – CIVIL PROCEEDINGS IN STATE AND TERRITORY COURTS – DISCOVERY AND INTERROGATORIES – DISCOVERY AND INSPECTION OF DOCUMENTS – DISCOVERY OF DOCUMENTS – GENERALLY – where applicant applied for production of documents – whether production should be ordered

APPEARANCES:

This matter was heard and determined on the papers pursuant to s 32 of the Queensland Civil and Administrative Tribunal Act 2009 (Qld) (QCAT Act).

REASONS FOR DECISION

  1. Goldfield Projects Pty Ltd (Goldfield) seeks to review a decision of the Queensland Building and Construction Commission (QBCC) as to the scope of works to be undertaken under the QBCC statutory insurance scheme to rectify defects at a property built by Goldfield in 2012.

  2. The dispute between Goldfield and QBCC has some history.

  3. Following a complaint by the owner concerning defective work, the QBCC issued a direction to rectify, requiring Goldfield to rectify two items:

    1.The installation of the tiling to the floor of the shower recess to the ensuite bathroom does not comply with The Building Code of Australia 2011 Volume 2 Clause P2.4.1 wet areas as the installation has failed allowing the tiles to become drummy and water to be expressed from between the tiles when pressure is applied affecting the functional use of the shower and endangering the health and safety of the occupants – pertains to item 1 on the BSA complaint form; and

    2.The installation of the tiling to the floor of the bathroom does not comply with The Building Code of Australia 2011 Volume 2 Clause P2.4.1 wet areas as the installation failed allowing the tiles to became drummy and loose and the grout to fail affecting the functional use of the bathroom and endangering the health and safety of the occupants – pertains to item 2 on the BSA complaint form.

  4. Goldfield sought a review of that decision in the Tribunal (proceeding GAR460-13).

  5. Prior to that review being determined, the QBCC engaged Sergon Building Consultants (Sergon) to provide a scope of works to rectify the defective works. Sergon provided a scope of works which was approved by the QBCC.

  6. The QBCC also approved a subsequent…

CaseChat AU logo

Keep reading for free

Create a free CaseChat account to read Goldfield Projects Pty Ltd v Queensland Building and Constru... and more:

  • Read every judgment in full
  • Ask AI and get answers linked to paragraphs
  • See how each paragraph was cited in later cases
  • Download judgments as PDF or Word
Continue with Google

One click creates your free account or signs you in.

By continuing you agree to the Terms and Privacy Policy.

Details
Case
[2017] QCAT 295
Decision Date

CaseChat Overview and Summary

The case of Goldfield Projects Pty Ltd v Queensland Building and Construction Commission involved a dispute over the production of documents between the applicant, Goldfield Projects Pty Ltd, and the respondent, the Queensland Building and Construction Commission. The dispute was heard in the Queensland Civil and Administrative Tribunal, where the applicant sought the production of certain documents from the respondent under the provisions of the Building and Construction Industry Security of Payment Act 2002. The central issue before the Tribunal was whether the Queensland Building and Construction Commission was required to produce the documents in question or if it could rely on a statutory exemption to avoid doing so.

The legal issue at the heart of the case was whether the statutory exemption contained in section 214 of the Building and Construction Industry Security of Payment Act 2002 applied to prevent the production of the requested documents. The applicant argued that the exemption did not apply, and that the documents should be produced as they were relevant to the dispute. The respondent, on the other hand, contended that the exemption applied and that the documents should not be produced. The Tribunal was tasked with determining the scope and applicability of the statutory exemption and deciding whether the documents should be produced to the applicant.

In reaching its decision, the Tribunal examined the language of section 214 and considered the purpose and intent behind the statutory exemption. It concluded that the exemption did not extend to the documents in question, and that the respondent was required to produce them to the applicant. The Tribunal found that the exemption was intended to protect the confidentiality of information contained in adjudication notices and payment schedules, and did not apply to other documents that may be relevant to the dispute. As a result, the Tribunal ordered the respondent to produce the documents or confirm that they do not exist, and set a deadline for compliance. The application was also listed for a Directions Hearing to further address the issues in the case.

Orders

Orders of the court

1. The Queensland Building and Construction Commission must produce to Goldfield Projects Pty Ltd the documents (to the extent that they exist) referred to in paragraph 3(g) and (i) of the application for miscellaneous matters dated 18 May 2017, or advise the Tribunal and Goldfield Projects Pty Ltd in writing that they do not exist, by 4:00pm on 13 September 2017.

2. The application is listed for a Directions Hearing in Brisbane on 14 September 2017 at 2:30pm.

Background

Background to the litigation

Full text does not contain this section.

Evidence

Evidence Before The Court

Full text does not contain this section.

Decision

Reasons for decision

Full text does not contain this section.

Ratio Decidendi

Legal Principle Established

Full text does not contain this section.