QUEENSLAND CIVIL AND
ADMINISTRATIVE TRIBUNAL
CITATION:
GDS Building Services Pty Ltd t/as Zen Roofing v Queensland Building and Construction Commission [2025] QCAT 16
PARTIES:
GDS BUILDING SERVICES PTY LTD TRADING AS ZEN ROOFING (applicant)
v
QUEENSLAND BUILDING AND CONSTRUCTION COMMISSION (respondent)
APPLICATION NO:
GAR233-22
MATTER TYPE:
General administrative review matters
DELIVERED ON:
6 January 2025
HEARING DATE:
3 October 2024
HEARD AT:
Brisbane
DECISION OF:
Member Chapple
ORDERS:
1. The decision by the Queensland Building and Construction Commission dated 20 May 2022 to issue a direction to rectify defects numbered 1, 2, 3, 4, 5 and 6 is confirmed.
2. The decision is stayed insofar as it requires work to be done which is agreed by the parties as rectified, being the work the subject of defects numbered 1, 3 and 6.
CATCHWORDS:
GENERAL ADMINISTRATIVE REVIEW – BUILDING – QBCC INTERNAL REVIEW OF DECISION TO RECTIFY – defective work – whether within the scope of the contract – where some rectification work undertaken – whether fair in all the circumstances to issue decision to rectify
Queensland Building and Construction Commission Act 1991 (Qld), s 3, s 75, s 87
Birrell v Queensland Building Services Authority [2013] QCAT 56
Cantamessav Queensland Building and Construction Commission and Anor [2019] QCAT 268
Duke Building Pty Ltd vQueensland Building and Construction Commission and Anor [2015] QCAT 397
Fewster and Anor v Queensland Building and Construction Commission and Anor [2021] QCAT 251
Interlink Developments Pty Ltd v Queensland Building and Construction Commission [2020] QCAT 480Lyon v Queensland Building and Construction Commission [2016] QCAT 296
APPEARANCES & REPRESENTATION:
Applicant:
Self-represented
Respondent:
Ms Hannah Lilley, Norton Rose Fulbright Australia
REASONS FOR DECISION
BACKGROUND
The applicant (‘Zen Roofing’) carried out roofing works at a house property at 132 Barrack Road, Cannon Hill in the State of Queensland pursuant to a contract with the homeowner dated 8 March 2021 (‘the Contract’), which provides for the scope of works as ‘removal of existing asbestos roof cladding, to be replaced with corrugated metal sheeting’. The works were completed on or about 13 August 2021.
On 8 November 2021, the homeowner lodged a complaint with the respondent (‘the QBCC’) alleging 12 defects.
On 7 March 2022, Mr Sanders, a QBCC building inspector, together with a representative of Sunnyside Roofing, inspected the works.
On 29 March 2022, Mr Sanders made a decision to issue a direction to rectify to Zen Roofing in relation to six defects summarised as follows:
(a)Hip and ridge cappings are not fitted to battens in accordance with AS1562.1 (‘defect 1’).
(b)Hip and ridge cappings are not joined in accordance with HB39 section 5.8 (‘defect 2’).
(c)Rafters to ridge and under purling connections are not detailed in accordance with the approved documents (‘defect 3’).
(d)Roof sheeting and flashings to the veranda roof are not completed in accordance with BCA section 3.5.1.7 and manufacturer’s recommendations (‘defect 4’).
(e)Roof screws are not completed in accordance with AS1562.1 section 4.4 (‘defect 5’).
(f)Roof screws are not completed in accordance with…
Keep reading for free
Create a free CaseChat account to read GDS Building Services Pty Ltd t/as Zen Roofing v Queensland... and more:
- Read every judgment in full
- Ask AI and get answers linked to paragraphs
- See how each paragraph was cited in later cases
- Download judgments as PDF or Word
One click creates your free account or signs you in.
By continuing you agree to the Terms and Privacy Policy.
Details
- Case
- [2025] QCAT 16
- Decision Date
CaseChat Overview and Summary
The Tribunal examined whether the defects identified by the QBCC were within the scope of the contract between Zen Roofing and its client. In particular, defect 3, concerning the tie-down requirement, was argued by Zen Roofing to be outside the scope of the contract. However, the Tribunal was not persuaded by Zen Roofing's argument, noting the absence of evidence from Mr. Johnson of Fluid Building Approvals, who could have provided insight into the conditions and circumstances of the approval process. The Tribunal found that the QBCC had the authority to consider all relevant circumstances in deciding whether to issue a direction to rectify, and that the QBCC's decision was not limited to the terms of the contract.
The Tribunal confirmed the QBCC’s decision to issue a direction to rectify the identified defects, but stayed the requirement for work already agreed to be rectified by both parties, specifically defects numbered 1, 3 and 6. This decision acknowledges the QBCC’s jurisdiction and authority under the QBCC Act while balancing the fairness of imposing rectification work already completed.
Orders
Orders of the court
1. The decision by the Queensland Building and Construction Commission dated 20 May 2022 to issue a direction to rectify defects numbered 1, 2, 3, 4, 5 and 6 is confirmed.
2. The decision is stayed insofar as it requires work to be done which is agreed by the parties as rectified, being the work the subject of defects numbered 1, 3 and 6.
Background
Background to the litigation
Evidence
Evidence before the court
Decision
Reasons for decision
Ratio Decidendi
Legal principle established
I am satisfied the parties are in agreement that defects 1, 3 and 6 have since been rectified.ConsiderationStatutory framework and jurisdiction One of the objects of the QBCC Act is to provide remedies for defective building work.[4][4]QBCC Act, s 3(b). ‘Building work’ is defined in Schedule 2 of the QBCC Act to include the renovation, alteration, extension, improvement or repair of a ‘building’, which is defined as generally including any fixed structure. ‘Defective’, in relation to building work, is defined as including faulty or unsatisfactory. Section 72 of the QBCC Act provides (inter alia) that where the QBCC is of the opinion that building work is defective or incomplete,[5] it may direct the person who carried out the building work to rectify the building work within the period stated in the direction.[6] This is commonly referred to as a direction to rectify. [5]Ibid, s 72(1)(a).[6]Ibid, s 72(2)(a). In deciding whether to give the direction, the QBCC may take into consideration all the circumstances it considers are reasonably relevant and, in particular, is not limited to a consideration of the terms of the contract for carrying out the building work.[7][7]Ibid, s 72(3). The QBCC is not required to give the direction if it is satisfied that, in the circumstances, it would be unfair to the person to give the direction.[8][8]Ibid, s 72(5). Section 86(1)(e) of the QBCC Act provides that a decision of the QBCC to give a direction to rectify or remedy or not to give the direction is a reviewable decision. A person affected by a reviewable decision of the QBCC may apply to the Tribunal for a review of the decision, also known as external review.[9] Section 86E of the QBCC Act provides that a reviewable decision (for the purposes of external review) means an internal review decision of the QBCC made pursuant to s 86C.[9]Ibid, s 87. I am satisfied that the legislative requirements have been met and the Tribunal has jurisdiction to hear and decide this application. The Tribunal must exercise its review jurisdiction in accordance with the Queensland Civil and Administrative Tribunal Act 2009 (Qld) (‘QCAT Act’). The purpose of the review is to produce the correct and preferable decision.[10] The Tribunal must hear and decide the review by way a fresh hearing on the merits,[11] and in doing so, the Tribunal stands in the shoes of the QBCC.[12][10]QCAT Act, s 20(1).[11]Ibid, s 20(2).[12]Ibid, s 19(c).Whether defect 3 was excluded from the Contract Defect 3 has been described already as: Rafters to ridge and under purling connections are not detailed in accordance with the approved documents. I refer to this as the tie-down requirement. Zen Roofing claims that defect 3 relates to work outside the scope of the Contract and therefore is not a defect. I am not persuaded by Zen Roofing’s evidence in relation to this issue. Mr Johnson of Fluid Building Approvals did not provide a statement of evidence and was not called to give evidence. As a result, there was no opportunity for the Tribunal to hear evidence from Mr Johnson about the conditions and circumstances of the approval.