Ampcontrol SWG Pty Ltd v Gujarat NRE Wonga Pty Ltd

Link copied
Case Copied 10 min read

Supreme Court


New South Wales

Medium Neutral Citation: Ampcontrol SWG Pty Limited -v- Gujarat NRE Wonga Pty Limited (formerly Gujarat NRE FCGL Pty Limited) [2013] NSWSC 707
Hearing dates:29 May 2013
Decision date: 03 June 2013
Jurisdiction:Equity Division - Technology and Construction List
Before: Hammerschlag J
Decision:

Judgment for the plaintiff

Catchwords: Building and Construction Industry - Building and Construction Industry Security of Payment Act - Where claimant serves a payment claim for a progress payment which does not disclose the precise contractual provisions relied. Where defendant fails to serve a payment schedule and then opposes judgment being entered on the basis that the terms of the contract do not entitle the plaintiff to the progress payment claimed - sufficient for the plaintiff to make a claim - defendant could raise the contractual issue in a payment schedule or adjudication response but is not entitled to do so now
Legislation Cited: Building and Construction Industry Security of Payment Act 1999 (NSW)
Cases Cited: Isis Projects v Clarence Street [2004] NSWSC 714
Consolidated Constructions v Ettamogah Pub [2004] NSWSC 110
Category:Principal judgment
Parties: Ampcontrol SWG Pty Limited ACN 001 737 533 - Plaintiff
Gujarat NRE Wonga Pty Limited ACN 111 928 762 - Defendant
Representation: Counsel:
D.S. Weinberger - Plaintiff
B.J. Gillard (Solicitor) - Defendant
Solicitors:
Ampcontrol Pty Ltd - Plaintiff
Gillard Consulting Lawyers - Defendant
File Number(s):2013/54853

Judgment

Introduction

  1. HIS HONOUR: On 30 June 2011 the plaintiff as Contractor and the defendant as Principal entered into a written construction contract ("the contract") under which the plaintiff agreed to design, supply and commission certain High Voltage Infrastructure at the defendant's mine site at Wongawilli, New South Wales.

  1. The plaintiff agreed to supply equipment described in a schedule to the contract, identified as Schedule 2. Clause 5.3 of the contract provides that "[t]he price of the Equipment will be the price specified in Schedule 2 and will be payable by the Principal in accordance with clauses 26 and 27."

  1. Schedule 2 is in the following form:

SCHEDULE 2

Pricing and Payment Schedule

ITEM

DESCRIPTION

COST

1

Manufacture, supply and installation of Ampcontrol Supplied Equipment as per Schedule 2: Scope of Work of this contract. The major component break-up as follows:

1a

33kV 25MVA Isolation Substation (1 off)

$1,698,129

1b

33/6.6kV 10MVA transportable substation (1 off) MCSet 6.6kV Switchgear (Note that this unit incorporates two (2) separate skid sections)

$1,749,390

1c

33/11kV 15MVA transportable substation (1 off) MCSet 11kV Switchgear

$1,583,182

1d

6.6kV 3500KVar 3 Step Power Factor Correction Units (1 off). Note that site assembly by others will be required.

$254,902

1e

11kV 3500kVar 3 Step Power Factor Correction Units (1 off). Note that site assembly by others will be required.

$254,902

1f

Transport to site and Unloading of Substation (item 1a)

$28,604

1g

Transport to site and Unloading of Substation (item 1b)

$28,604

1h

Transport to site and Unloading of Substation (item 1c)

$28,604

1i

NER's and Monitors for Auxiliary Transformers (3 sets)

$18,000

1j

Network Switch…

CaseChat AU logo

Keep reading for free

Create a free CaseChat account to read Ampcontrol SWG Pty Ltd v Gujarat NRE Wonga Pty Ltd and more:

  • Read every judgment in full
  • Ask AI and get answers linked to paragraphs
  • See how each paragraph was cited in later cases
  • Download judgments as PDF or Word
Continue with Google

One click creates your free account or signs you in.

By continuing you agree to the Terms and Privacy Policy.

Details
Case
[2013] NSWSC 707
Decision Date

CaseChat Overview and Summary

The matter between Ampcontrol SWG Pty Ltd and Gujarat NRE Wonga Pty Ltd was before the court. The dispute centred around a payment claim made by Ampcontrol for a progress payment under a building contract, where Ampcontrol did not specify the precise contractual provisions upon which it relied. Gujarat, the respondent, failed to provide a payment schedule and subsequently opposed judgment being entered on the basis that the terms of the contract did not entitle Ampcontrol to the progress payment claimed. The primary legal issue was whether Ampcontrol's failure to specify the precise contractual provisions in its payment claim precluded it from making a claim, and whether Gujarat could now challenge the entitlement to the payment.

The court considered whether Ampcontrol's failure to specify the precise contractual provisions in the payment claim was fatal to its claim. The court noted that while Ampcontrol could have been more precise in its claim, Gujarat had the opportunity to address the contractual issue in a payment schedule or an adjudication response but had failed to do so. The court held that Ampcontrol was still entitled to make a claim for the progress payment, and Gujarat's opposition based on the terms of the contract was not permissible at this stage. The court further ruled that Gujarat could not now challenge the contractual basis of the payment claim, having previously failed to address it in a timely manner.

In light of the above, the court determined that Ampcontrol was entitled to judgment for the amount claimed in the payment claim, plus interest. The court found that Gujarat's opposition to the claim on the grounds of the terms of the contract was not permissible, given the failure to raise this issue in a timely fashion. The court ordered that judgment be entered in favour of Ampcontrol for the amount claimed, plus interest, and that costs be awarded to Ampcontrol.

Orders

Orders of the court

Full text does not contain this section.

Background

Background to the litigation

Full text does not contain this section.

Evidence

Evidence Before The Court

Full text does not contain this section.

Decision

Reasons for decision

Full text does not contain this section.

Ratio Decidendi

Legal Principle Established

Full text does not contain this section.