R (on the application of Friends of the Earth Ltd and others) (Respondents) v Heathrow Airport Ltd (Appellant)

Case

[2020] UKSC 52

No judgment structure available for this case.

Michaelmas Term

[2020] UKSC 52

On appeal from: [2020] EWCA Civ 214

Appellant Respondent (1)
Lord Anderson of Ipswich KBE QC David Wolfe QC
Michael Humphries QC Peter Lockley
Richard Turney Andrew Parkinson
Malcolm Birdling
(Instructed by Bryan Cave Leighton (Instructed by Leigh Day
Paisner LLP) (London))

Respondent (2)
Tim Crosland, Director,

Plan B Earth

Respondents:

(1) Friends of the Earth
(2) Plan B Earth

LORD HODGE AND LORD SALES: (with whom Lord Reed, Lady Black and Lord Leggatt agree)

Introduction

1. This case concerns the framework which will govern an application for the grant of development consent for the construction of a third runway at Heathrow Airport. This is a development scheme promoted by the appellant, Heathrow Airport Ltd (“HAL”), the owner of the airport.

2. As a result of consideration over a long period, successive governments have

come to the conclusion that there is a need for increased airport capacity in the South
East of England to foster the development of the national economy.

3. An independent commission called the Airports Commission was established in 2012 under the chairmanship of Sir Howard Davies to consider the options. In its interim report dated 17 December 2013 the Airports Commission reached the conclusion that there was a clear case for building one new runway in the South East, to come into operation by 2030. In that report the Airports Commission set out scenarios, including a carbon-traded scenario under which overall carbon dioxide

(CO₂) emissions were set at a cap consistent with a goal to limit global warming to

2ºC. The Commission reduced the field of proposals to three main candidates. Two of these involved building additional runway capacity at Heathrow Airport, either to the north west of the existing two runways (“the NWR Scheme”) or by extending the existing northern runway (“the ENR Scheme”). The third involved building a second runway at Gatwick airport (“the G2R Scheme”).

4. The Airports Commission carried out an extensive consultation on which scheme should be chosen. In its final report dated 1 July 2015 (“the Airports Commission Final Report”) the Commission confirmed that there was a need for additional runway capacity in the South East by 2030 and concluded that, while all three options could be regarded as credible, the NWR Scheme was the best way to meet that need, if combined with a significant package of measures which addressed environmental and community impacts.

5. The Government carried out reviews of the Airports Commission’s analysis and conclusions. It assessed the Airports Commission Final Report to be sound and robust. On 14 December 2015 the Secretary of State for Transport (“the Secretary of State”) announced that the Government accepted the case for airport expansion; agreed with, and would consider further, the Airports Commission’s short-list of options; and would use the mechanism of a national policy statement (“NPS”) issued under the Planning Act 2008 (“the PA 2008”) to establish the policy framework within which to consider an application by a developer for a development consent order (“DCO”). The announcement also stated that further work had to be done in relation to environmental impacts, including those arising from carbon emissions.

6. In parallel with the development of national airports policy, national and international policy to combat climate change has also been in a state of development. The Climate Change Act 2008 (“the CCA 2008”) was enacted on the same day as the PA 2008. It sets a national carbon target (section 1) and requires the Government to establish carbon budgets for the UK (section 4). There are mechanisms in the CCA 2008 to adjust the national target and carbon budgets (in sections 2 and 5, respectively) as circumstances change, including as scientific understanding of global warming develops.

7. In 1992, the United Nations adopted the United Nations Framework Convention on Climate Change. 197 states are now parties to the Convention. Following the 21st Conference of the parties to the Convention, on 12 December 2015 the text of the Paris Agreement on climate change was agreed and adopted. The Paris Agreement set out certain obligations to reduce emissions of greenhouse gases, in particular CO2, with the object of seeking to reduce the rate of increase in global warming and to contain such increase to well below 2oC above, and if possible to 1.5oC, above pre-industrial levels. On 22 April 2016 the United Kingdom signed the Paris Agreement and on 17 November 2016 the United Kingdom ratified the Agreement.

8. An expansion of airport capacity in the South East would involve a substantial increase in CO2 emissions from the increased number of flights which would take place as a result. The proposals for such expansion have therefore given rise to a considerable degree of concern as to the environmental impact it would be likely to have on global warming and climate change. This is one aspect of the proposals for expansion of airport capacity, among many others, which have made the decision whether to proceed with such expansion a matter of controversy.

9. On 25 October 2016, the Secretary of State announced that the NWR Scheme was the Government’s preferred option. In February 2017 the Government commenced consultation on a draft of an Airports NPS which it proposed should be promulgated pursuant to the PA 2008 to provide the national policy framework for consideration of an application for a DCO in respect of the NWR Scheme. A further round of consultation on a draft of this NPS was launched in October 2017. There were many thousands of responses to both consultations. In June 2018 the Government published its response to the consultations. It also published a response to a report on the proposed scheme dated 1 November 2017 by the Transport Committee (a Select Committee of the House of Commons).

10. On 5 June 2018 the Secretary of State laid before Parliament the final version of the Airports NPS (“the ANPS”), together with supporting documents. As is common ground on this appeal, the policy framework set out in the ANPS makes it clear that issues regarding the compatibility of the building of a third runway at Heathrow with the UK’s obligations to contain carbon emissions and emissions of other greenhouse gases could and should be addressed at the stage of the assessment of an application by HAL for a DCO to allow it to proceed with the development. As is also common ground, the ANPS makes it clear that the emissions obligations to be taken into account at the DCO stage will be those which are applicable at that time, assessed in the light of circumstances and the detailed proposals of HAL at that time.

11. On 25 June 2018 there was a debate on the proposed ANPS in the House of Commons, followed by a vote approving the ANPS by 415 votes to 119, a majority of 296 with support from across the House.

12. On 26 June 2018 the Secretary of State designated the ANPS under section

5(1) of the PA 2008 as national policy. It is the Secretary of State’s decision to
designate the ANPS which is the subject of legal challenge in these proceedings.

13. Objectors to the NWR Scheme commenced a number of claims against the Secretary of State to challenge the lawfulness of the designation of the ANPS on a wide variety of grounds. For the most part, those claims have been dismissed in the courts below in two judgments of the Divisional Court (Hickinbottom LJ and Holgate J) in the present proceedings, [2019] EWHC 1070 (Admin); [2020] PTSR 240, and an associated action ([2019] EWHC 1069 (Admin)) and in the judgment of the Court of Appeal in the present proceedings: [2020] EWCA Civ 214; [2020] PTSR 1446.

14. The Divisional Court dismissed all the claims brought by objectors, including those brought by the respondents to this appeal (Friends of the Earth - “FoE” - and Plan B Earth). FoE is a non-governmental organisation concerned with climate change. Plan B Earth is a charity concerned with climate change.

15. However, the Court of Appeal allowed appeals by FoE and Plan B Earth and granted declaratory relief stating that the ANPS is of no legal effect and that the Secretary of State had acted unlawfully in failing to take into account the Paris Agreement in making his decision to designate the ANPS. The Court of Appeal set out four grounds for its decision:

(i) The Secretary of State breached his duty under section 5(8) of the PA 2008 to give an explanation of how the policy set out in the ANPS took account of Government policy, which was committed to implementing the emissions reductions targets in the Paris Agreement (“the section 5(8) ground”);

(ii) The Secretary of State breached his duty under section 10 of the PA 2008, when promulgating the ANPS, to have regard to the desirability of mitigating and adapting to climate change, in that he failed to have proper regard to the Paris Agreement (“the section 10 ground”);

(iii) The Secretary of State breached his duty under article 5 of the Strategic Environmental Assessment Directive (“the SEA Directive”, Directive 2001/42/EC of the European Parliament and of the Council on the assessment of the effects of certain plans and programmes on the environment) to issue a suitable environmental report for the purposes of public consultation on the proposed ANPS, in that he failed to refer to the Paris Agreement (“the SEA Directive ground”); and

(iv) The Secretary of State breached his duty under section 10 of the PA 2008, when promulgating the ANPS, in that he failed to have proper regard to (a) the desirability of mitigating climate change in the period after 2050 (“the post 2050 ground”) and (b) the desirability of mitigating climate change by restricting emissions of non-CO₂ impacts of aviation, in particular nitrous oxide (“the non-CO2 emissions ground”).

16. The Court of Appeal also rejected a submission by HAL, relying on section 31 of the Senior Courts Act 1981, that it should exercise its discretion as to remedy to refuse any relief, on the grounds that (HAL argued) it was highly likely that even if there had been no breach of duty by the Secretary of State the decision whether to issue the ANPS would have been the same.

17. HAL appeals to this court with permission granted by the court. HAL is joined in the proceedings as an interested party. It has already invested large sums of money in promoting the NWR Scheme and wishes to carry it through by applying for a DCO in due course and then building the proposed new runway. The Secretary of State has chosen not to appeal and has made no submissions to us. However, HAL is entitled to advance all the legal arguments which may be available in order to defend the validity of the ANPS.

18. Prior to the Covid-19 pandemic, Heathrow was the busiest two-runway airport in the world. The pandemic has had a major impact in reducing aviation and the demand for flights. However, there will be a lead time of many years before any third runway at Heathrow is completed and HAL’s expectation is that the surplus of demand for aviation services over airport capacity will have been restored before a third runway would be operational. Lord Anderson QC for HAL informed the court that HAL intends to proceed with the NWR Scheme despite the pandemic.

The Planning Act 2008

19. We are grateful to the Divisional Court for their careful account of the PA 2008, on which we draw for this section. The PA 2008 established a new unified “development consent” procedure for “nationally significant infrastructure projects” defined to include certain “airport-related development” including the construction or alteration of an airport that is expected to be capable of providing air passenger services for at least 10m passengers per year (sections 14 and 23). Originally, many of the primary functions under the Act were to be exercised by the Infrastructure Planning Commission, established under section 1. However, those functions were transferred to the Secretary of State by the Localism Act 2011.

20. The mischiefs that the Act was intended to address were identified in the White Paper published in May 2007, Planning for a Sustainable Future (Cm 7120) (“the 2007 White Paper”). Prior to the PA 2008, a proposal for the construction of a new airport or extension to an airport would have required planning permission under the Town and Country Planning Act 1990. An application for permission would undoubtedly have resulted in a public inquiry, whether as an appeal against refusal of consent or a decision by the Secretary of State to “call in” the matter for his own determination. As paragraph 3.1 of the 2007 White Paper said:

“A key problem with the current system of planning for major infrastructure is that national policy and, in particular, the national need for infrastructure, is not in all cases clearly set out. This can cause significant delays at the public inquiry stage, because national policy has to be clarified and the need for the infrastructure has to be established through the inquiry process and for each individual application. For instance, the absence of a clear policy framework for airports development was identified by the inquiry secretary in his report on the planning inquiry as one of the key factors in the very long process for securing planning approval for Heathrow Terminal 5. Considerable time had to be taken at the inquiry debating whether there was a need for additional capacity. The Government has since responded by publishing the Air Transport White Paper to provide a framework for airport development. This identifies airport development which the Government considers to be in the national interest, for reference at future planning inquiries. But for many other infrastructure sectors, national policy is still not explicitly set out, or is still in the process of being developed.”

21. Paragraph 3.2 identified a number of particular problems caused by the absence of a clear national policy framework. For example, inspectors at public inquiries might be required to make assumptions about national policy and national need, often without clear guidance and on the basis of incomplete evidence. Decisions by Ministers in individual cases might become the means by which government policy would be expressed, rather than such decisions being framed by clear policy objectives beforehand. In the absence of a clear forum for consultation at the national level, it could be more difficult for the public and other interested parties to have their say in the formulation of national policy on infrastructure. The ability of developers to make long-term investment decisions is influenced by the availability of clear statements of government policy and objectives, and might be adversely affected by the absence of such statements.

22. The 2007 White Paper proposed that national policy statements would set the policy framework for decisions on the development of national infrastructure.

“They would integrate the Government’s objectives for infrastructure capacity and development with its wider economic, environmental and social policy objectives, including climate change goals and targets, in order to deliver sustainable development.”

The role of Ministers would be to set policy, in particular the national need for infrastructure development (para 3.4).

23. Paragraph 3.11 envisaged that any public inquiry dealing with individual applications for development consent would not have to consider issues such as whether there is a case for infrastructure development, or the types of development most likely to meet the need for additional capacity, since such matters would already have been addressed in the NPS. It was said that NPSs should have more weight than other statements of policy, whether at a national or local level: they should be the primary consideration in the determination of an application for a DCO (para 3.12), although other relevant considerations should also be taken into account (para 3.13). To provide democratic accountability, it was said that NPSs should be subject to Parliamentary scrutiny before being adopted (para 3.27).

24. In line with the 2007 White Paper recommendation, Part 2 of the PA 2008 provides for NPSs which give a policy framework within which any application for development consent, in the form of a DCO, is to be determined. Section 5(1) gives the Secretary of State the power to designate an NPS for development falling within the scope of the Act; and section 6(1) provides that “[t]he Secretary of State must review each [NPS] whenever the Secretary of State thinks it appropriate to do so”.

25.       The content of an NPS is governed by section 5(5)-(8) which provide that:

“(5) The policy set out in [an NPS] may in particular -

(a) set out, in relation to a specified description of development, the amount, type or size of development of that description which is appropriate nationally or for a specified area;

(b) set out criteria to be applied in deciding whether

a location is suitable (or potentially suitable) for a
specified description of development;

(c) set out the relative weight to be given to specified
criteria;

(d) identify one or more locations as suitable (or

potentially suitable) or unsuitable for a specified
description of development;

(e) identify one or more statutory undertakers as

appropriate persons to carry out a specified description
of development;

(f) set out circumstances in which it is appropriate

for a specified type of action to be taken to mitigate the
impact of a specified description of development.

(6) If [an NPS] sets out policy in relation to a particular description of development, the statement must set out criteria to be taken into account in the design of that description of development.

(7) [An NPS] must give reasons for the policy set out in the

statement.

(8) The reasons must (in particular) include an explanation of how the policy set out in the statement takes account of Government policy relating to the mitigation of, and adaptation to, climate change.”

As is made clear, the NPS may (but is not required to) identify a particular location for the relevant development.

26. In addition, under the heading “Sustainable development”, section 10 provides (so far as relevant to these claims):

“(1) This section applies to the Secretary of State’s functions under sections 5 and 6.

(2) The Secretary of State must, in exercising those functions, do so with the objective of contributing to the achievement of sustainable development.

(3) For the purposes of subsection (2) the Secretary of State must (in particular) have regard to the desirability of -

(a) mitigating, and adapting to, climate change; …”

27. The process for designation of an NPS is also set out in the Act. The PA 2008 imposed for the first time a transparent procedure for the public and other consultees to be involved in the formulation of national infrastructure policy in advance of any consideration of an application for a DCO.

28. The Secretary of State produces a draft NPS, which is subject to (i) an appraisal of sustainability (“AoS”) (section 5(3)), (ii) public consultation and publicity (section 7), and (iii) Parliamentary scrutiny (sections 5(4) and 9). In addition, there is a requirement to carry out a strategic environmental assessment under the SEA Directive as transposed by the Environmental Assessment of Plans and Programmes Regulations 2004 (SI 2004/1633) (“the SEA Regulations”) (see regulation 5(2) of the SEA Regulations).

29. The consultation and publicity requirements are set out in section 7, which so far as relevant provides:

“(1) This section sets out the consultation and publicity


requirements referred to in sections 5(4) and 6(7).

(2) The Secretary of State must carry out such consultation, and arrange for such publicity, as the Secretary of State thinks appropriate in relation to the proposal. This is subject to subsections (4) and (5).

(3) In this section ‘the proposal’ means -
(a) the statement that the Secretary of State proposes to designate as [an NPS] for the purposes of this Act or
(b) (as the case may be) the proposed amendment.

(4) The Secretary of State must consult such persons, and such descriptions of persons, as may be prescribed.

(5) If the policy set out in the proposal identifies one or more locations as suitable (or potentially suitable) for a specified description of development, the Secretary of State must ensure that appropriate steps are taken to publicise the proposal.

(6) The Secretary of State must have regard to the responses to the consultation and publicity in deciding whether to proceed with the proposal.”

30. A proposed NPS must be laid before Parliament (section 9(2) and (8)). The Act thus provides an opportunity for a committee of either House of Parliament to scrutinise a proposed NPS and to make recommendations; and for each House to scrutinise it and make resolutions (see section 9(4)).

31. An NPS is not the end of the process. It simply sets the policy framework within which any application for a DCO must be determined. Section 31 provides that, even where a relevant NPS has been designated, development consent under the PA 2008 is required for development “to the extent that the development is or forms part of a nationally significant infrastructure project”. Such applications must be made to the relevant Secretary of State (section 37).

32. Chapter 2 of Part 5 of the Act makes provision for a pre-application procedure. This provides for a duty to consult pre-application, which extends to consulting relevant local authorities and, where the land to be developed is in London, the Greater London Authority (section 42). There are also duties to consult the local community, and to publicise and to take account of responses to consultation and publicity (sections 47-49; and see also regulation 12 of the Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 (SI 2017/572), which makes provision for publication of and consultation on preliminary environmental information). Any application for a DCO must be accompanied by a consultation report (section 37(3)(c)); and adequacy of consultation is one of the criteria for acceptance of the application (section 55(3) and (4)(a)).

33. Part 6 of the PA 2008 is concerned with “Deciding applications for orders granting development consent”. Once the application has been accepted, section 56 requires the applicant to notify prescribed bodies and authorities and those interested in the land to which the application relates, who become “interested parties” to the application (section 102). The notification must include a notice that interested parties may make representations to the Secretary of State. Section 60(2) provides that where a DCO application is accepted for examination there is a requirement to notify any local authority for the area in which land, to which the application relates, is located (see section 56A)) and, where the land to be developed is in London, the Greater London Authority, inviting them each to submit a “local impact report” (section 60(2)).

34. The Secretary of State may appoint a panel or a single person to examine the application (“the Examining Authority”) and to make a report setting out its findings and conclusions, and a recommendation as to the decision to be made on the application. The examination process lasts six months, unless extended (section 98); and the examination timetable is set out in the Infrastructure Planning (Examination Procedure) Rules 2010 (SI 2010/103) (“the Examination Rules”). In addition to local impact reports (section 60), the examination process involves written representations (section 90), written questions by the Examining Authority (rules 8 and 10 of the Examination Rules), and hearings (which might be open floor and/or issue specific and/or relating to compulsory purchase) (sections 91-93). As a result of the examination process, the provisions of the proposed DCO may be amended by either the applicant or the Examination Authority, eg in response to the representations of interested parties; and it is open to the Secretary of State to modify the proposed DCO before making it.

35. Section 104 constrains the Secretary of State when determining an

application for a DCO for development in relation to which an NPS has effect, in
the following terms (so far as relevant to these claims):

“(2) In deciding the application the Secretary of State must

have regard to -

(a) any [NPS] which has effect in relation to

development of the description to which the application
relates (a ‘relevant [NPS]’), …

(b) any local impact report …,

(c) any matters prescribed in relation to development of the description to which the application relates, and

(d) any other matters which the Secretary of State

thinks are both important and relevant to the Secretary
of State’s decision.

(3) The Secretary of State must decide the application in accordance with any relevant [NPS], except to the extent that one or more of subsections (4) to (8) applies.

(4) This subsection applies if the Secretary of State is satisfied that deciding the application in accordance with any relevant [NPS] would lead to the United Kingdom being in breach of any of its international obligations.

(5) This subsection applies if the Secretary of State is satisfied that deciding the application in accordance with any relevant [NPS] would lead to the Secretary of State being in breach of any duty imposed on the Secretary of State by or under any enactment.

(6) This subsection applies if the Secretary of State is satisfied that deciding the application in accordance with any relevant [NPS] would be unlawful by virtue of any enactment.

(7) This subsection applies if the Secretary of State is satisfied that the adverse impact of the proposed development would outweigh its benefits.

(8) This subsection applies if the Secretary of State is satisfied that any condition prescribed for deciding an application otherwise than in accordance with [an NPS] is met.

(9) For the avoidance of doubt, the fact that any relevant [NPS] identifies a location as suitable (or potentially suitable) for a particular description of development does not prevent one or more of subsections (4) to (8) from applying.”

36. Section 104 is complemented by section 106 which, under the heading

“Matters which may be disregarded when determining an application”, provides (so
far as relevant to these claims):

“(1) In deciding an application for an order granting development consent, the Secretary of State may disregard representations if the Secretary of State considers that the representations -

(a)
(b) relate to the merits of policy set out in [an

NPS]….

(2) In this section ‘representation’ includes evidence.”

That is also reflected in sections 87(3) and 94(8), under which the Examining Authority may disregard representations (including evidence) or refuse to allow representations to be made at a hearing if it considers that they “relate to the merits of the policy set out in [an NPS] …”.

37. By section 120(1), a DCO may impose requirements in connection with the development for which consent is granted, eg it may impose conditions considered appropriate or necessary to mitigate or control the environmental effects of the development. Section 120(3) is a broad provision enabling a DCO to make provision relating to, or to matters ancillary to, the development for which consent is granted including any of the matters listed in Part 1 of Schedule 5 (section 120(4)). That schedule lists a wide range of potentially applicable provisions, including compulsory purchase, the creation of new rights over land, the carrying out of civil engineering works, the designation of highways, the operation of transport systems, the charging of tolls, fares and other charges and the making of byelaws and their enforcement.

38.       Section 13 concerns “Legal challenges relating to [NPSs]”. Section 13(1)

provides:

“A court may entertain proceedings for questioning [an NPS] or anything done, or omitted to be done, by the Secretary of State in the course of preparing such a statement only if -

(a) the proceedings are brought by a claim for

judicial review, and

(b) the claim form is filed before the end of the period of six weeks beginning with the day after -

(i) the day on which the statement is

designated as [an NPS] for the purposes of this
Act, or

(ii)       (if later) the day on which the statement is

published.”

It was under section 13 that the claims by objectors to the ANPS were brought.
The Climate Change Act 2008

39. Again, we gratefully draw on the account given by the Divisional Court. As they explain, the UK has for a long time appreciated the desirability of tackling climate change, and wished to take a more rigorous domestic line. In the 2003 White Paper, “Our Energy Future - Creating a Low Carbon Economy”, the Government committed to reduce CO2 emissions by 60% on 1990 levels by 2050; and to achieve “real progress” by 2020 (which equated to reductions of 26-32%). The 60% figure emanated from the EU Council of Ministers’ “Community Strategy on Climate Change” in 1996, which determined to limit emissions to 550 parts per million (ppm) on the basis that to do so would restrict the rise in global temperatures to 2ºC above pre-industrial levels which, it was then considered, would avoid the serious consequences of global warming. However, by 2005, there was scientific evidence that restricting emissions to 550ppm would be unlikely to be effective in keeping the rise to 2ºC; and only stabilising CO2 emissions at something below 450ppm would be likely to achieve that result.

40.       Parliament addressed these issues in the CCA 2008.

41. Section 32 established a Committee on Climate Change (“the CCC”), an independent public body to advise the UK and devolved Governments and Parliaments on tackling climate change, including on matters relating to the UK’s statutory carbon reduction target for 2050 and the treatment of greenhouse gases from international aviation.

42. Section 1 gives a mandatory target for the reduction of UK carbon emissions. At the time of designation of the ANPS, it provided:

“It is the duty of the Secretary of State [then, the Secretary of State for Energy and Climate Change: now, the Secretary of State for Business, Enterprise and Industrial Strategy (‘BEIS’)] to ensure that the net UK carbon account for the year 2050 is at least 80% lower than the 1990 baseline.”

The figure of 80% was substituted for 60% during the passage of the Bill, as evolving scientific knowledge suggested that the lower figure would not be sufficient to keep the rise in temperature to 2ºC in 2050. Therefore, although the CCA 2008 makes no mention of that temperature target, as the CCC said in its report on the Paris Agreement issued in October 2016 (see para 73 below):

“This 2050 target was derived as a contribution to a global emissions path aimed at keeping global average temperatures to around 2ºC above pre-industrial levels.”

The statutory target of a reduction in carbon emissions by 80% by 2050 was Parliament’s response to the international commitment to keep the global temperature rise to 2ºC above pre-industrial levels in 2050. Since the designation of the ANPS, the statutory target has been made more stringent. The figure of 100% was substituted for 80% in section 1 of the CCA 2008 by the Climate Change Act 2008 (2050 Target Amendment) Order 2019/1056.

43. The Secretary of State for BEIS has the power to amend that percentage (section 2(1) of the CCA 2008), but only:

(i) if it appears to him that there have been significant developments in scientific knowledge about climate change since the passing of the Act, or developments in European or international law or policy (section 2(2) and (3)): the Explanatory Note to the Act says, as must be the case, that “this power might be used in the event of a new international treaty on climate change”;

(ii)       after obtaining, and taking into account, advice from the CCC (section

3(1)); and

(iii)      subject to Parliamentary affirmative resolution procedure (section

2(6)).  

44. Section 1 of the CCA 2008 sets a target that relates to carbon only. Section 24 enables the Secretary of State for BEIS to set targets for other greenhouse gases, but subject to similar conditions to which an amendment to the section 1 target is subject.

45. In addition to the carbon emissions target set by section 1 - and to ensure compliance with it (see sections 5(1)(b) and 8) - the Secretary of State for BEIS is also required to set for each succeeding period of five years, at least 12 years in advance, an amount for the net UK carbon account (“the carbon budget”); and ensure that the net UK carbon account for any period does not exceed that budget (section 4). The carbon budget for the period including 2020 was set to be at least 34% lower than the 1990 baseline.

46. Section 10(2) sets out various matters which are required to be taken into

account when the Secretary of State for BEIS sets, or the CCC advises upon, any
carbon budget, including:

“(a) scientific knowledge about climate change;
(b) technology relevant to climate change;

(c) economic circumstances, and in particular the likely

impact of the decision on the economy and the competitiveness
of particular sectors of the economy;

(d) fiscal circumstances, and in particular the likely impact

of the decision on taxation, public spending and public
borrowing;

(e) social circumstances, and in particular the likely impact of the decision on fuel poverty;

(f)
(h) circumstances at European and international level;

(i) the estimated amount of reportable emissions from international aviation and international shipping …”

Therefore, although for the purposes of the CCA 2008 emissions from greenhouse gases from international aviation do not generally count as emissions from UK sources (section 30(1)), by virtue of section 10(2)(i), in relation to any carbon budget, the Secretary of State for BEIS and the CCC must take such emissions into account.

47. The evidence for the Secretary of State explains that the CCC has interpreted that as requiring the UK to meet a 2050 target which includes these emissions. The CCC has advised that, to meet the 2050 target on that basis, emissions from UK aviation (domestic and international) in 2050 should be no higher than 2005 levels, ie 37.5 megatons (million tonnes) of CO2 (MtCO2). This is referred to by the respondents as “the Aviation Target”. However, the Aviation Policy Framework issued by the Government in March 2013 explains that the Government decided not to take a decision on whether to include international aviation emissions in its carbon budgets, simply leaving sufficient headroom in those budgets consistent with meeting the 2050 target including such emissions, but otherwise deferring a decision for consideration as part of the emerging Aviation Strategy. The Aviation Strategy is due to re-examine how the aviation sector can best contribute its fair share to emissions reductions at both the UK and global level. It is yet to be finalised.

The SEA Directive

48. Again, in this section we gratefully draw on the careful account given by the Divisional Court. As they explain, Directive 2011/92/EU of the European Parliament and of the Council of 13 December 2011 on the assessment of the effects of certain public and private projects on the environment as amended (“the EIA Directive”), as currently transposed by the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (SI 2017/571), requires a process within normal planning procedures. (For the purposes of these claims, the transposing regulations have not materially changed over the relevant period; and we will refer to them collectively as “the EIA Regulations”.) The SEA Directive as transposed by the SEA Regulations concerns the environmental impact of plans and programmes. The SEA Directive and Regulations applied to the ANPS. The EIA Directive would apply when there was a particular development for which development consent was sought, at the DCO stage.

49.       Recital (1) to the SEA Directive states:

“Article 174 of the Treaty provides that Community policy on the environment is to contribute to, inter alia, the preservation, protection and improvement of the quality of the environment, the protection of human health and the prudent and rational utilisation of natural resources and that it is to be based on the precautionary principle. Article 6 of the Treaty provides that environmental protection requirements are to be integrated into the definition of Community policies and activities, in particular with a view to promoting sustainable development.”

As suggested here, the SEA Directive relies upon the “precautionary principle” where appropriate.

50.       Recital (4) states:

“Environmental assessment is an important tool for integrating environmental considerations into the preparation and adoption of certain plans and programmes which are likely to have significant effects on the environment in the member states, because it ensures that such effects of implementing plans and programmes are taken into account during their preparation and before their adoption.”

51.       Recital (9) states:

“This Directive is of a procedural nature, and its requirements should either be integrated into existing procedures in member states or incorporated in specifically established procedures. With a view to avoiding duplication of the assessment, member states should take account, where appropriate, of the fact that assessments will be carried out at different levels of a hierarchy of plans and programmes.”

Thus, the requirements of the SEA Directive are essentially procedural in nature; and it may be appropriate to avoid duplicating assessment work by having regard to work carried out at other levels or stages of a policy-making process (see article 5(2)-(3) below).

52.       Recital (17) states:

“The environmental report and the opinions expressed by the relevant authorities and the public, as well as the results of any transboundary consultation, should be taken into account during the preparation of the plan or programme and before its adoption or submission to the legislative procedure.”

53.       The objectives of the SEA Directive are set out in article 1:

“The objective of this Directive is to provide for a high level of protection of the environment and to contribute to the integration of environmental considerations into the preparation and adoption of plans and programmes with a view to promoting sustainable development, by ensuring that, in accordance with this Directive, an environmental assessment is carried out of certain plans and programmes which are likely to have significant effects on the environment.”

54. Article 3(1) requires an “environmental assessment” to be carried out, in accordance with articles 4 to 9, for plans and programmes referred to in article 3(2)- (4) which are likely to have significant environmental effects. Article 3(2) requires strategic environmental assessment generally for any plan or programme which is prepared for (inter alia) transport, town and country planning or land use and which sets the framework for future development consent for projects listed in Annexes I and II to the EIA Directive. Strategic environmental assessment is also required for other plans and programmes which are likely to have significant environmental effects (article 3(4)). By virtue of sections 104 and 106 of the PA 2008, the ANPS designated under section 5 sets out the framework for decisions on whether a DCO for the development of an additional runway at Heathrow under Part 6 of that Act should be granted. That development would, in due course, require environmental impact assessment under the EIA Directive and Regulations; and there is no dispute that the ANPS needed to be subjected to strategic environmental assessment under the SEA Directive and the SEA Regulations.

55. Article 2(b) of the SEA Directive defines “environmental assessment” for the purposes of the Directive:

“‘environmental assessment’ shall mean the preparation of an environmental report, the carrying out of consultations, the taking into account of the environmental report and the results of the consultations in decision-making and the provision of information on the decision in accordance with articles 4 to 9.”

56. Article 4(1) requires “environmental assessment to be carried out during the

preparation of a plan or programme and before its adoption ...”, which in this
instance would refer to the Secretary of State’s decision to designate the ANPS.

57.       Article 5 sets out requirements for an “environmental report”. By article 2(c):

“‘environmental report’ shall mean the part of the plan or programme documentation containing the information required in article 5 and Annex I.”

In the case of the ANPS the environmental report was essentially the AoS.

58.       Article 5(1) provides:

“Where an environmental assessment is required under article 3(1), an environmental report shall be prepared in which the likely significant effects on the environment of implementing the plan or programme, and reasonable alternatives taking into account the objectives and the geographical scope of the plan or programme, are identified, described and evaluated. The information to be given for this purpose is referred to in Annex I.”

Annex I states, under the heading, “Information referred to in article 5(1)”:

“The information to be provided under article 5(1), subject to
article 5(2) and (3), is the following:

(a) an outline of the contents, main objectives of the

plan or programme and relationship with other relevant
plans and programmes;

(b) the relevant aspects of the current state of the

environment and the likely evolution thereof without
implementation of the plan or programme;

(c) the environmental characteristics of areas likely to be significantly affected;

(d) any existing environmental problems which are relevant to the plan or programme including, in particular, those relating to any areas of a particular environmental importance, such as areas designated pursuant to [the Habitats and Birds Directives];

(e) the environmental protection objectives,

established at international, Community or member state level, which are relevant to the plan or programme and the way those objectives and any environmental considerations have been taken into account during its preparation;

(f) the likely significant effects on the environment, including on issues such as biodiversity, population, human health, fauna, flora, soil, water, air, climatic factors, material assets, cultural heritage including architectural and archaeological heritage, landscape and the interrelationship between the above factors;

(g) the measures envisaged to prevent, reduce and as fully as possible offset any significant adverse effects on the environment of implementing the plan or programme;

(h) an outline of the reasons for selecting the alternatives dealt with, and a description of how the assessment was undertaken including any difficulties (such as technical deficiencies or lack of know-how) encountered in compiling the required information;

(i) a description of the measures envisaged concerning monitoring in accordance with article 10;

(j) a non-technical summary of the information provided under the above headings.”

Thus, the information required by the combination of article 5(1) and Annex I is subject to article 5(2) and (3), which provide:

“(2) The environmental report prepared pursuant to paragraph 1 shall include the information that may reasonably be required taking into account current knowledge and methods of assessment, the contents and level of detail in the plan or programme, its stage in the decision-making process and the extent to which certain matters are more appropriately assessed at different levels in that process in order to avoid duplication of the assessment.

(3) Relevant information available on environmental effects of the plans and programmes and obtained at other levels of decision-making or through other Community legislation may be used for providing the information referred to in Annex I.” (Emphasis added)

59. Accordingly, the information which is required to be included in an “environmental report”, whether by article 5(1) itself or by that provision in conjunction with Annex I, is qualified by article 5(2) and (3) in a number of respects. First, the obligation is only to include information that “may reasonably be required”, which connotes the making of a judgment by the plan-making authority. Second, that judgment may have regard to a number of matters, including current knowledge and assessment methods. In addition, the contents and level of detail in a plan such as the ANPS, the stage it has reached in the decision-making process and the ability to draw upon sources of information used in other decision-making, may affect the nature and extent of the information required to be provided in the environmental report for the strategic environmental assessment.

60. The stage reached by the ANPS should be seen in the context of the statutory framework of the PA 2008, as set out above (see paras 19-38). Section 5(5) authorises the Secretary of State to set out in an NPS the type and size of development appropriate nationally or for a specified area and to identify locations which are either suitable or unsuitable for that development. In addition, the Secretary of State may set out criteria to be applied when deciding the suitability of a location. Section 104(3) requires the Secretary of State to decide an application for a DCO in accordance with a relevant NPS, save in so far as any one or more of the exceptions in section 104(4)-(8) applies, which include the situation where the adverse impacts of a proposal are judged to outweigh its benefits (section 104(7)). Section 106(1) empowers the Secretary of State to disregard a representation objecting to such a proposal in so far as it relates to the merits of a policy contained in the NPS.

61. In the present case, the Secretary of State made it plain in the strategic environmental assessment process that the AoS drew upon and updated the extensive work which had previously been carried out by, and on behalf of, the Airports Commission, including numerous reports to the Airports Commission and its own final report. It is common ground that the Secretary of State was entitled to take that course.

62. Article 6 of the SEA Directive sets out requirements for consultation. Article 6(1) requires that the draft plan or programme and the environmental report be made available to the public and to those authorities designated by a member state under article 6(3) which, by virtue of their specific environmental responsibilities, are likely to be concerned by the environmental effects of implementing plans and programmes. In England, the designated authorities are Natural England, Historic England and the Environment Agency (see regulation 4 of the SEA Regulations). In the case of the ANPS, the Secretary of State also had to consult those designated authorities on the scope and level of detail of the information to be included in the environmental report (article 5(4)).

63.       In relation to the consultation process, article 6(2) provides:

“The authorities referred to in para 3 and the public referred to in para 4 shall be given an early and effective opportunity within appropriate time frames to express their opinion on the draft plan or programme and the accompanying environmental report before the adoption of the plan or programme or its submission to the legislative procedure.”

64. “The public referred to in [article 6(4)]” is a cross-reference to the rules made by each member state for defining the public affected, or likely to be affected by, or having an interest in the decision-making on the plan. Regulation 13(2) of the SEA Regulations leaves this to be determined as a matter of judgment by the plan-making authority.

65. Article 8 requires the environmental report prepared under article 5, the opinions expressed under article 6, and the results of any transboundary consultations under article 7 to be “taken into account during the preparation of the plan or programme and before its adoption or submission to the legislative procedure”.

66. In Cogent Land LLP v Rochford District Council [2012] EWHC 2542 (Admin); [2013] 1 P & CR 2, Singh J held that a defect in the adequacy of an environmental report prepared for the purposes of the SEA Directive may be cured by the production of supplementary material by the plan-making authority, subject to there being consultation on that material (see paras 111-126). He held that articles 4, 6(2) and 8 of the Directive, along with their transposition in the SEA Regulations, are consistent with that conclusion; and that none of the previous authorities on the SEA Directive (which he reviewed) suggested otherwise. He held that SEA is not a single document, still less is it the same thing as the “environmental report”. Rather, it is a process, during the course of which an environmental report must be produced (see para 112). The Court of Appeal endorsed this analysis in No Adastral New Town Ltd v Suffolk Coastal District Council [2015] EWCA Civ 88; [2015] Env LR 28, in deciding that SEA failures in the early stages of an authority’s preparation of its Core Strategy (a statutory development plan) were capable of being, and were in fact, cured by the steps taken in subsequent stages (see paras 48-54). We agree with this analysis.

67. It follows that strategic environmental assessment may properly involve an iterative process; and that it is permissible for a plan-making authority to introduce alterations to its draft plan subject to complying with the information requirements in article 5 and the consultation requirements in articles 6 and 7.

68. Regulation 12 of the SEA Regulations transposes the main requirements in

article 5 of the Directive governing the content of an environmental report as follows
(emphasis added):

“(2) The report shall identify, describe and evaluate the

likely significant effects on the environment of -

(a) implementing the plan or programme; and

(b) reasonable alternatives taking into account the

objectives and the geographical scope of the plan or
programme.

(3) The report shall include such of the information referred to in Schedule 2 to these Regulations as may reasonably be required, taking account of -

(a) current knowledge and methods of assessment;
(b) the contents and level of detail in the plan or

programme;

(c) the stage of the plan or programme in the decision-making process; and

(d) the extent to which certain measures are more

appropriately assessed at different levels in that process
in order to avoid duplication of the assessment.”

Schedule 2 replicates the list of items in Annex I to the SEA Directive. No issue is raised as to the adequacy of that transposition.

69. As the Divisional Court observed, it is plain from the language “as may reasonably be required” that the SEA Regulations, like the SEA Directive, allow the plan-making authority to make a judgment on the nature of the information in Schedule 2 and the level of detail to be provided in an environmental report, whether as published initially or in any subsequent amendment or supplement.

Factual background

70. At the heart of the challenge to the ANPS is the Paris Agreement (para 7 above) which acknowledged that climate change represents “an urgent and potentially irreversible threat to human societies and the planet” (Preamble to the Decision to adopt the Paris Agreement). In article 2 the Paris Agreement sought to enhance the measures to reduce the risks and impacts of climate change by setting a global target of “holding the increase in the global average temperature to well below 2ºC above pre-industrial levels and pursuing efforts to limit the temperature increase to 1.5ºC above pre-industrial levels”. Each signatory of the Paris Agreement undertook to take measures to achieve that long-term global temperature goal “so as to achieve a balance between anthropogenic emissions by sources and removals by sinks of greenhouse gases in the second half of this century …” (article 4(1)). Each party agreed to prepare, communicate and maintain successive nationally determined contributions (“NDCs”) that it intended to achieve and to pursue domestic mitigation measures with the aim of achieving the objectives of such NDCs (article 4(2)). A party’s successive NDC was to progress beyond its current NDC and was to reflect its highest possible ambition (article 4(3)).

71. Notwithstanding the common objectives set out in articles 2 and 4(1), the Paris Agreement did not impose an obligation on any state to adopt a binding domestic target to ensure that those objectives were met. The specific legal obligation imposed in that regard was to meet any NDC applicable to the state in question. So far as concerns the United Kingdom, it is common ground that the relevant NDC is that adopted and communicated on behalf of the EU, which set a binding target of achieving 40% reduction of 1990 emissions by 2030. This is less stringent than the targets which had already been set in the fourth and fifth carbon budgets issued pursuant to section 4 of the CCA 2008, which were respectively a 50% reduction on 1990 levels for the period 2023-2027 and a 57% reduction for the period 2028-2032.

72. Before the United Kingdom had signed or ratified the Paris Agreement two Government Ministers made statements in the House of Commons about the Government’s approach to the Paris Agreement. On 14 March 2016 the Minister of State for Energy, Andrea Leadsom MP, told the House of Commons that the Government “believe we will need to take the step of enshrining the Paris goal of net zero emissions in UK law - the question is not whether, but how we do it, and there is an important set of questions to be answered before we do”. Ten days later (24 March 2016) Amber Rudd MP, Secretary of State for Energy and Climate Change, responded to an oral question on what steps her department was taking to enshrine the net zero emissions commitment of the Paris Climate Change Conference by stating that “the question is not whether we do it but how we do it.”

73. The Government received advice from the CCC on the UK’s response to the Paris goal. At a meeting on 16 September 2016 the CCC concluded that while a new long-term target would be needed to be consistent with the Paris goal, “the evidence was not sufficient to specify that target now”.

74. In October 2016 the CCC published a report entitled “UK Climate Action following the Paris Agreement” on what domestic action the Government should take as part of a fair contribution to the aims of the Paris Agreement. In that report the CCC stated that the goals of the Paris Agreement involved a higher level of global ambition in the reduction of greenhouse gases than that which formed the basis of the UK’s existing emissions reduction targets. But the CCC advised that it was neither necessary nor appropriate to amend the 2050 target in section 1 of the CCA 2008 or alter the level of existing carbon budgets at that time. It advised that there would be “several opportunities to revisit the UK’s targets in the future” and that “the UK 2050 target is potentially consistent with a wide range of global temperature outcomes”. In its executive summary (p 7) the CCC summarised its advice:

“Do not set new UK emissions targets now … The five-yearly cycle of pledges and reviews created by the Paris Agreement provides regular opportunities to consider increasing UK ambition.”

75. In October 2017 the Government published its “Clean Growth Strategy” which set out its policies and proposals to deliver economic growth and decreased emissions. In Annex C in its discussion of UK climate action it acknowledged the risks posed by the growing level of global climate instability. It recorded the global goals of the Paris Agreement and that global emissions of greenhouse gases would need to peak as soon as possible, reduce rapidly thereafter and reach a net zero level in the second half of this century. It recorded the CCC’s advice in these terms:

“In October 2016 the [CCC] said that the Paris Agreement target ‘is more ambitious than both the ambition underpinning the UK 2050 target and previous international agreements’, but that the UK should not set new UK emissions targets now, as it already had stretching targets and achieving them will be a positive contribution to global climate action. The CCC advised that the UK’s fair contribution to the Paris Agreement should include measures to maintain flexibility to go further on UK targets, the development of options to remove greenhouse gases from the air, and that its targets should be kept under review.”

76. In December 2017 Plan B Earth and 11 other claimants commenced judicial review proceedings against the Secretary of State for BEIS and CCC alleging that the Secretary of State had unlawfully failed to revise the 2050 target in section 1 of the CCA 2008 in line with the Paris Agreement.

77.       The Secretary of State pleaded:

“[While] the Government is fully committed to the objectives in the Paris Agreement, the legal obligation upon the Parties is to prepare, communicate and maintain nationally determined contributions to reduce net emissions, with a view to achieving the purpose of holding global average temperature increases to ‘well below 2ºC’ above pre-industrial levels and pursuing efforts to limit them to 1.5ºC. This is not the same as a legal duty or obligation for the Parties, individually or collectively, to achieve this aim.” (Emphasis in original)

The CCC also explained its position in its written pleadings:

“The CCC recommended no change to the existing UK 2050 target (at that time, October 2016), not because a more ambitious target was unfeasible, but rather because the existing UK target was potentially consistent with more ambitious global temperature goals, including that in the Paris Agreement.”

78. At an oral hearing ([2018] EWHC 1892 (Admin); [2019] Env LR 13), Supperstone J refused permission to proceed with the judicial review, holding among other things that the Paris Agreement did not impose any legally binding target on each contracting party, that section 2 of the CCA 2008 gave the Secretary of State the power, but did not impose a duty, to amend the 2050 target in the event of developments in scientific knowledge or European or international law or policy, and that on the basis of the advice of the CCC, the Secretary of State was plainly entitled to refuse to change the 2050 target. Asplin LJ refused permission to appeal on 22 January 2019.

79. In January 2018 the CCC published “An independent assessment of the UK’s Clean Growth Strategy”. In that report the CCC explained that the aim of the Paris Agreement for emissions to reach net zero in the second half of the century was likely to require the UK to revise its statutory 2050 target to seek greater reductions and advised that “it is therefore essential that actions are taken now to enable these deeper reductions to be achieved” (p 21). The CCC invited the Secretary of State for BEIS to seek further advice from it and review the UK’s long-term emissions targets after the publication of the report by the Intergovernmental Panel on Climate Change (“IPCC”) on the implications of the Paris Agreement’s 1.5ºC goal.

80. In January 2018 the Government published “A Green Future: Our 25 Year Plan to Improve the Environment” in which it undertook to continue its work in providing international leadership to meet the goals of the Paris Agreement (for example, p 118). In early 2018 governments, including the UK Government, were able to review a draft of the IPCC report and in early June 2018 the UK Government submitted final comments on the draft of the IPCC report.

165. We respectfully disagree with that approach. The precautionary principle adds nothing to the argument in this context and we construe the judgment as equating the principle with common sense. But a court’s view of common sense is not the same as a finding of irrationality, which is the only relevant basis on which FoE seeks to impugn the designation in its section 10 challenges. In any event we

are satisfied that the Secretary of State’s decision to address only CO₂ emissions in

the ANPS was not irrational.

166. In summary, we agree with the Divisional Court that it is not reasonably arguable that the Secretary of State acted irrationally in not addressing the effect of the non-CO₂ emissions in the ANPS for six reasons. First, his decision reflected the uncertainty over the climate change effects of non-CO₂ emissions and the absence of an agreed metric which could inform policy. Secondly, it was consistent with the advice which he had received from the CCC. Thirdly, it was taken in the context of the Government’s inchoate response to the Paris Agreement. Fourthly, the decision was taken in the context in which his department was developing as part of that response its Aviation Strategy, which would seek to address non-CO₂ emissions. Fifthly, the designation of the ANPS was only the first stage in a process by which permission could be given for the NWR Scheme to proceed and the Secretary of State had powers at the DCO stage to address those emissions. Sixthly, it is clear from both the AoS and the ANPS itself that the applicant for a DCO would have to address the environmental rules and policies which were current when its application would be determined.

Conclusion

167. It follows that HAL succeeds on each of grounds (i) to (iv) of its appeal. It is not necessary therefore to address ground (v) which is concerned with the question whether the court should have granted the relief which it did. We would allow the appeal.

JUDGMENT

R (on the application of Friends of the Earth Ltd

and others) (Respondents) v Heathrow Airport Ltd

(Appellant)

before

Lord Reed, President
Lord Hodge, Deputy President

Lady Black Lord Sales

Lord Leggatt

JUDGMENT GIVEN ON

16 December 2020

Heard on 7 and 8 October 2020