    Michaelmas Term
    [2009] UKSC 13
    On appeal from: [2008] EWCA Civ 1552

    JUDGMENT

    Barratt Homes Limited (Respondents) v Dwr Cymru Cyfyngedig (Welsh Water) (Appellants)
    before
    Lord Phillips, President
    Lord Saville
    Lord Walker
    Lady Hale
    Lord Clarke
    JUDGMENT GIVEN ON

    9 December 2009

    Heard on 27 and 28 July 2009
    Appellant
    Lord Pannick QC
    David Holgate QC
    Maurice Sheridan
    Jessica Simor
    (Instructed by Geldards LLP)
      Respondent
    Anthony Porten QC
    Steven Gasztowicz QC
    Clare Perry
    (Instructed by Darwin Gray)
    LORD PHILLIPS (with whom Lord Saville, Lord Walker and Lord Clarke agree)
    Introduction
  1. This appeal is about the right conferred by the Water Industry Act 1991 ("the Act") on a property owner to connect his private drain or sewer to a public sewer for the purpose of discharging his sewage into the public sewer. The principal issue raised is whether it is the property owner or the sewerage undertaker who is entitled to determine the point at which the property owner's drain or sewer is to connect to the public sewer. This narrow issue of statutory construction conceals, however, wider and more fundamental issues that are less easily resolved. I propose first to resolve the narrow issue, before commenting on these wider issues.
  2. Llanfoist is a village near Abergavenny in Monmouthshire. Its surface water and foul water drainage requirements are met by a public sewerage system that terminates in a waste water treatment works ("the Treament Works") about 1/3 mile to the East of the village and below it. This system is about 60 years old.
  3. Approximately mid-way between the village and the Treatment Works, at manhole SO29125900 ("the CSO"), the sewage pipe that links the two reduces from a diameter of 225 mm to a diameter of 150 mm and continues for a distance of 282m before it increases, at manhole SO29127901 to a diameter of 300mm for the final stretch to the Treatment Works. The narrow section, described as a "pipe bridge" determines the capacity of the system, or at least all that part of it that lies upstream of manhole SO29127901.
  4. The Respondents, "Barratts", are in the process of building a substantial development of 98 houses and a primary school on a greenfield site contiguous to the East side of Llanfoist. They constructed a private sewer to receive the sewage from this development. They claimed a statutory right to connect their private sewer to the public sewer at a point of their own choosing, which was in the close vicinity of their development. This point of connection was not satisfactory to Welsh Water, as it would overload the system upstream of manhole SO29127901. They claimed a statutory right to refuse connection at this point, offering instead connection at manhole SO29127901, an option that would saddle Barratts with the cost of the link from their development to manhole SO29127901. Thus arose the narrow issue of the interpretation of the relevant provisions of the 1991 Act.
  5. At first instance, in a judgment delivered on 1 August 2008, Wyn Williams J found in…
CaseChat AU logo

Keep reading for free

Create a free CaseChat account to read Barratt Homes Ltd v Dwr Cymru Cyfyngedig (Welsh Water) and more:

  • Read every judgment in full
  • Ask AI and get answers linked to paragraphs
  • See how each paragraph was cited in later cases
  • Download judgments as PDF or Word
Continue with Google

One click creates your free account or signs you in.

By continuing you agree to the Terms and Privacy Policy.

Details

Case
[2009] UKSC 13
Decision Date

CaseChat Overview and Summary