Nova Energy Limited v Electricity Authority

Link copied
Case Copied 28 min read

IN THE COURT OF APPEAL OF NEW ZEALAND

I TE KŌTI PĪRA O AOTEAROA

 CA364/2022
 [2023] NZCA 275

BETWEEN

NOVA ENERGY LIMITED
Appellant

AND

ELECTRICITY AUTHORITY
First Respondent

AND

MERIDIAN ENERGY LIMITED
Second Respondent

Hearing:

19-20 April 2023

Court:

French, Miller and Katz JJ

Counsel:

M N Dunning KC and J A Tocher for Appellant
D A Laurenson KC, J H Stevens and L J Hardcastle for First Respondent
J D Every-Palmer KC and T Mijatov for Second Respondent
T D Smith for Transpower as Intervenor

Judgment:

3 July 2023 at 11.00 am

JUDGMENT OF THE COURT

AThe appeal is dismissed.

BNova Energy Ltd must pay costs as set out at [57].

____________________________________________________________________

REASONS OF THE COURT

(Given by Miller J)

TABLE OF CONTENTS

Introduction  [1]
Nova Energy  [12]
The Authority’s rationale  [15]
The statutory framework for decision  [24]
The Code  [30]
The grounds of judicial review  [31]
Illegality  [34]
Irrationality  [38]
Failure to undertake cost-benefit analysis of net AMD for co-generation       [53]
Disposition  [55]

Introduction

  1. Transpower operates the national electricity grid, which transmits electricity in bulk around the country, connecting generation plants to distribution networks through which it is transmitted to consumers.  The costs of operating the national grid are around $800M a year.  They are recovered from users of electricity under a transmission pricing methodology (TPM) that Transpower must develop in accordance with guidelines set by the Electricity Authority | Te Mana Hiko (the Authority) and given effect in the Electricity Industry Participation Code (the Code).[1]

    [1]Under the Electricity Industry Act 2010, s 32; and the Electricity Industry Participation Code 2010, part 12. 

  2. In a 2020 decision the Authority developed new guidelines (the 2020 Guidelines) which have now been implemented in a TPM which took effect on 1 April 2023. 

  3. The 2020 Guidelines effected substantial change in transmission pricing.  The Authority had decided that the existing TPM was no longer fit for purpose because it distorted the cost of transmission, distributed those costs in a way which did not encourage efficient investment in the electricity system, and required that the costs of the high voltage direct current link across Cook Strait must be borne by South Island generation notwithstanding that all users benefit from its output. 

  4. The Authority instead adopted a policy of recovering costs from those who benefit from transmission investments.  There are three components:

    (a)Connection charges are payable by generators, regional lines companies or industrial users who connect directly to the grid.  The charges recover the costs of Transpower connection assets needed to connect these users to the grid. 

    (b)Benefit-based charges cover grid investments made from July 2019.  They are payable by those who benefit from such investments. 

    (c)A “residual charge” recovers costs not allocated to specific transmission investments (such as Transpower’s head office costs) and the remaining costs of all other historical transmission investments. 

  5. Initially the residual charge will recover a large proportion — about 56 per cent — of the total costs of the grid, but that proportion is projected to decline to…

CaseChat AU logo

Keep reading for free

Create a free CaseChat account to read Nova Energy Limited v Electricity Authority and more:

  • Read every judgment in full
  • Ask AI and get answers linked to paragraphs
  • See how each paragraph was cited in later cases
  • Download judgments as PDF or Word
Continue with Google

One click creates your free account or signs you in.

By continuing you agree to the Terms and Privacy Policy.

Details
Case
[2023] NZCA 275
Decision Date

CaseChat Overview and Summary

Nova Energy Limited appealed against the Electricity Authority's decision to implement a new transmission pricing methodology, specifically challenging the allocation of the residual charge based on gross anytime maximum demand (AMD) for co-generation plants. The Court of Appeal found that the Authority had acted rationally in implementing the new methodology and upheld the decision. The Authority had considered the statutory objective of promoting competition, reliable supply, and efficient operation of the electricity industry for the long-term benefit of consumers, and had applied a gross AMD approach to achieve these objectives in the least distortionary manner possible. The Court found that the Authority's decision to implement the gross AMD approach was consistent with its objectives and based on available information. The appeal was dismissed, and the Authority was entitled to costs for a complex appeal on a Band A basis with usual disbursements. Meridian Energy Ltd also had costs on the same basis, as it was a respondent and fully participated in the appeal.

Orders

Orders of the court

Full text does not contain this section.

Background

Background to the litigation

Full text does not contain this section.

Evidence

Evidence Before The Court

Full text does not contain this section.

Decision

Reasons for decision

Full text does not contain this section.

Ratio Decidendi

Legal Principle Established

Full text does not contain this section.