| IN THE COURT OF APPEAL OF NEW ZEALAND I TE KŌTI PĪRA O AOTEAROA |
| CA364/2022 [2023] NZCA 275 |
| BETWEEN | NOVA ENERGY LIMITED |
| AND | ELECTRICITY AUTHORITY |
| AND | MERIDIAN ENERGY LIMITED |
| Hearing: | 19-20 April 2023 |
Court: | French, Miller and Katz JJ |
Counsel: | M N Dunning KC and J A Tocher for Appellant |
Judgment: | 3 July 2023 at 11.00 am |
JUDGMENT OF THE COURT
AThe appeal is dismissed.
BNova Energy Ltd must pay costs as set out at [57].
____________________________________________________________________
REASONS OF THE COURT
(Given by Miller J)
TABLE OF CONTENTS
Introduction [1]
Nova Energy [12]
The Authority’s rationale [15]
The statutory framework for decision [24]
The Code [30]
The grounds of judicial review [31]
Illegality [34]
Irrationality [38]
Failure to undertake cost-benefit analysis of net AMD for co-generation [53]
Disposition [55]
Introduction
Transpower operates the national electricity grid, which transmits electricity in bulk around the country, connecting generation plants to distribution networks through which it is transmitted to consumers. The costs of operating the national grid are around $800M a year. They are recovered from users of electricity under a transmission pricing methodology (TPM) that Transpower must develop in accordance with guidelines set by the Electricity Authority | Te Mana Hiko (the Authority) and given effect in the Electricity Industry Participation Code (the Code).[1]
[1]Under the Electricity Industry Act 2010, s 32; and the Electricity Industry Participation Code 2010, part 12.
In a 2020 decision the Authority developed new guidelines (the 2020 Guidelines) which have now been implemented in a TPM which took effect on 1 April 2023.
The 2020 Guidelines effected substantial change in transmission pricing. The Authority had decided that the existing TPM was no longer fit for purpose because it distorted the cost of transmission, distributed those costs in a way which did not encourage efficient investment in the electricity system, and required that the costs of the high voltage direct current link across Cook Strait must be borne by South Island generation notwithstanding that all users benefit from its output.
The Authority instead adopted a policy of recovering costs from those who benefit from transmission investments. There are three components:
(a)Connection charges are payable by generators, regional lines companies or industrial users who connect directly to the grid. The charges recover the costs of Transpower connection assets needed to connect these users to the grid.
(b)Benefit-based charges cover grid investments made from July 2019. They are payable by those who benefit from such investments.
(c)A “residual charge” recovers costs not allocated to specific transmission investments (such as Transpower’s head office costs) and the remaining costs of all other historical transmission investments.
Initially the residual charge will recover a large proportion — about 56 per cent — of the total costs of the grid, but that proportion is projected to decline to…
Keep reading for free
Create a free CaseChat account to read Nova Energy Limited v Electricity Authority and more:
- Read every judgment in full
- Ask AI and get answers linked to paragraphs
- See how each paragraph was cited in later cases
- Download judgments as PDF or Word
One click creates your free account or signs you in.
By continuing you agree to the Terms and Privacy Policy.
- Case
- [2023] NZCA 275
- Decision Date
CaseChat Overview and Summary
Orders
Orders of the court
Full text does not contain this section.
Background
Background to the litigation
Full text does not contain this section.
Evidence
Evidence Before The Court
Full text does not contain this section.
Decision
Reasons for decision
Full text does not contain this section.
Ratio Decidendi
Legal Principle Established
Full text does not contain this section.