| IN THE COURT OF APPEAL OF NEW ZEALAND |
| CA420/2015 [2015] NZCA 567 |
| BETWEEN | NORTHERN FARM SERVICES LIMITED |
| AND | CODYLAN FARMS LIMITED |
| Hearing: | 23 September 2015 |
Court: | Harrison, Dobson and Gilbert JJ |
Counsel: | P J Napier and N J Pye for Appellant |
Judgment: | 23 November 2015 at 3 pm |
JUDGMENT OF THE COURT
AThe appeal is allowed.
B The judgment entered for the respondent against the appellant in the High Court for $140,881.81 is set aside.
CJudgment is entered for the appellant.
DThe cross-appeal is dismissed.
EThe respondent must pay the appellant’s costs as for a standard appeal on a Band A basis together with usual disbursements.
____________________________________________________________________
REASONS OF THE COURT
(Given by Harrison J)
Introduction
Codylan Farms Limited (CFL) contracted Northern Farm Services Ltd (NFS) to install a temporary riser pipe and temporary pump within a new water bore on its farm in Taranaki. Shortly after installation the pipe broke and a large section of it together with the pump fell down the bore. CFL incurred costs of $140,881 in repairing the resulting damage caused to new screens which had been placed at the bottom of the bore. Its material damage indemnifier, Vero Insurance NZ Ltd, incurred an additional expenditure of $32,332 for the same purpose.
CFL and Vero alleged that NFS’ negligence caused their losses. Both parties issued proceedings against NFS in the High Court at New Plymouth. After a five day trial, Peters J found for CFL but dismissed Vero’s claim. She also found for NFS on its counterclaim for fees of $36,984. Judgment was entered accordingly.[1]
[1]Codylan Farms Ltd v Vero Insurance New Zealand Ltd [2015] NZHC 1678 and Codylan Farms Ltd v Vero Insurance New Zealand Ltd [2015] NZHC 1763 (judgment entered for GST-inclusive amounts).
NFS appeals. CFL opposes and seeks to support the judgment on other grounds. CFL also cross-appeals by applying for leave to amend its statement of claim, to include the damages of $32,332 originally claimed by Vero and for judgment for the increased amount of $173,213.
Background
The facts are set out in clear detail in the High Court judgment. For the purposes of this appeal we can summarise them more briefly. The relevant events fall into two distinct chronological categories. The first stage was as follows:
(1)In August 2012 David Smith of CFL requested Herbert Fisher of NFS to investigate why an existing five inch (diameter) bore on its farm was performing poorly. NFS is a long established business in Taranaki, offering services relating to pump equipment and machinery to the dairy industry.
(2)After conducting an investigation, Mr Fisher concluded that the existing bore was past its useful date. He advised Mr Smith to engage Jamie Thomas of Total Control Drilling Ltd (TCD) to drill a new bore. TCD provides drilling services and systems for a range of applications throughout New Zealand. Mr Smith accepted this advice.
(3)Messrs Smith and Thomas agreed that TCD should drill a 10 inch bore, capable of…
Keep reading for free
Create a free CaseChat account to read Northern Farm Services Limited v Codylan Farms Limited and more:
- Read every judgment in full
- Ask AI and get answers linked to paragraphs
- See how each paragraph was cited in later cases
- Download judgments as PDF or Word
One click creates your free account or signs you in.
By continuing you agree to the Terms and Privacy Policy.
- Case
- [2015] NZCA 567
- Decision Date
CaseChat Overview and Summary
The Court of Appeal held that the absence of industry practice did not establish NFS's breach of contract for failing to install a safety wire. The court found that the failure to install lugs was not obviously negligent given the temporary nature of the installation and the remote risk of pipe breakage. The court held that the size of the bore, the work expended in constructing it and CFL's requirement for a substantial and consistent supply of water had no bearing upon the risk of pipe failure and its consequences. The court also held that the failure to install lugs was not obviously negligent given the temporary nature of the installation and the remote risk of pipe breakage. The best evidence for CFL, from the metallurgist, Mr Purdie, was equivocal. He asserted that the breakage of the riser pipe must have been caused by the pump's cyclic movement and vibration. However, under cross-examination he accepted that he had no knowledge of how a pump moves inside a well liner; and that he had assumed the pump caused the breakage because he was unaware of any other sources of cyclic stress on the pipe. NFS's pump installation expert, Mr Burrows, was not challenged on his opinion that because a shroud was installed there would have been little or no turbulence within the well with the result that the riser pipe would not have moved appreciably. Also, as Mr Napier emphasised, CFL's own pump installation expert, Mr Hitchcock, was of the opinion that the pump would not move during operation. The court found that NFS was not negligent in failing to install lugs to the riser pipe assembly.
Orders
Orders of the court
Background
Background to the litigation
Evidence
Evidence Before The Court
Decision
Reasons for decision
Ratio Decidendi