Ngāti Kuku Hapū Trust v Environmental Protection Agency

Link copied
Case Copied 29 min read

IN THE HIGH COURT OF NEW ZEALAND WELLINGTON REGISTRY

I TE KŌTI MATUA O AOTEAROA TE WHANGANUI-A-TARA ROHE

CIV-2025-485-375 [2025] NZHC 2453

UNDERthe Judicial Review Procedure Act 2016 and Part 30 of the High Court Rules 2016

IN THE MATTER             of an application for judicial review in

respect of the Fast-track Approvals Act 2024

BETWEEN  NGĀTI KUKU HAPŪ TRUST

First Applicant

TRUSTEES OF NGĀ HAPŪ O NGĀ MOUTERE TRUST

Second Applicant

ANDENVIRONMENTAL PROTECTION AGENCY

First Respondent

PORT OF TAURANGA LTD
Second Respondent

A PANEL CONVENOR APPOINTED UNDER THE FAST-TRACK APPROVALS ACT 2024

Third Respondent

Hearing:                   19 August 2025

Appearances:           R B Enright and J Pou for Applicants

R J B Fowler KC, T J Condor, C L Lipinski for Second Respondent

No appearances for First and Third Respondent

Judgment:                27 August 2025


JUDGMENT OF BOLDT J


NGĀTI KUKU HAPU TRUST v ENVIRONMENTAL PROTECTION AGENCY [2025] NZHC 2453 [27

August 2025]

Introduction

[1]                  After decades of rapid growth, the Port of Tauranga is now New Zealand’s largest shipping port. It handles around 25 million tonnes of cargo each year. Around 38 per cent of New Zealand’s exports, and 39 per cent of the shipping containers that enter and leave the country, pass through it. The port represents a critical piece of infrastructure, both for the Bay of Plenty and for New Zealand as a whole.

[2]                  Sulphur Point is a peninsula which sits on almost 80 hectares of reclaimed land and juts northwards into Te Awanui, or Tauranga Harbour. The Port of Tauranga operates from two large but separate wharves, one on the eastern side of Sulphur Point and  the  other  at  Mount  Maunganui.  The  wharves  face  each  other  across   Stella Passage, a busy waterway within the harbour which is a little over 500 metres wide at its narrowest point. Sulphur Point houses New Zealand’s largest container port, while the Mount Maunganui side of the port includes numerous bulk cargo wharves and extensive storage facilities.

[3]                  The port’s ability to grow further is restricted by a number of factors. It is currently running at close to maximum capacity and is becoming congested. While the port can accommodate ships that are nearly 350 metres long, the length of the existing berths limits the port’s ability to host even larger vessels. Some of the existing wharves are old and need to be upgraded.

The Stella Passage Development

[4]                  In order to address these constraints, the company which owns the port, Port of Tauranga Limited (PTL)  proposes  to  extend  the  wharves  on  both  sides  of  Stella Passage. PTL proposes a two-stage extension of the Sulphur Point wharf — 285 metres at first, followed in due course by a further extension of 100 metres. It also proposes to extend the Mount Maunganui wharf by 315 metres. If approved, the project — now called the Stella Passage Development — will involve reclamation of around 1.8 hectares of coastal marine area on the Sulphur Point side and 1.77 hectares on the Mount Maunganui side. PTL proposes to…

CaseChat AU logo

Keep reading for free

Create a free CaseChat account to read Ngāti Kuku Hapū Trust v Environmental Protection Agency and more:

  • Read every judgment in full
  • Ask AI and get answers linked to paragraphs
  • See how each paragraph was cited in later cases
  • Download judgments as PDF or Word
Continue with Google

One click creates your free account or signs you in.

By continuing you agree to the Terms and Privacy Policy.

Details
Case
[2025] NZHC 2453
Decision Date

CaseChat Overview and Summary

The case of Ngāti Kuku Hapū Trust v Environmental Protection Agency involves a challenge by two hapū, the Ngāti Kuku Hapū Trust and the trustees of Ngā Hapū o Ngā Moutere Trust, to the decision of the Environmental Protection Agency (EPA) to accept an application from Port of Tauranga Limited (PTL) to extend its wharves under the Fast-track Approvals Act 2024. The applicants argue that the EPA erred in law by accepting PTL's application which sought approval for the extension of both the Sulphur Point and Mount Maunganui wharves, as the description of the listed project in the Act's schedule only refers to the extension of the Sulphur Point wharf. The applicants contend that the inclusion of the Mount Maunganui extension means the application did not relate "solely" to a listed project, as required by s 46(2)(b) of the Fast-track Approvals Act.

The court considered whether the phrase "extend the Sulphur Point wharf" in the schedule should be interpreted to include the extension of the Mount Maunganui wharf. The court found that while it is possible the reference to the Mount Maunganui wharf was omitted by mistake, it was not the only possible explanation. The court noted that the Fast-track Approvals Act was designed to streamline the approval process for major projects, with a reduced emphasis on cultural and environmental considerations compared to the Resource Management Act 1991. Given the unresolved issues and concerns about the Mount Maunganui extension raised in the Environment Court's first interim decision, the court concluded that it would have been understandable if the Minister decided the Mount Maunganui extension required the nuanced balancing that accompanies an application under the Resource Management Act. The court found that the description of the listed project in the schedule was clear and unambiguous, and that the inclusion of the Mount Maunganui extension meant PTL's application did not comply with s 46(2)(b). The court set aside the EPA's decision that the application was within scope.

In light of the court's decision, the parties have been directed to use their best endeavours to agree on any further consequential relief. If they are unable to agree, any further orders that may be necessary will be determined by the court on the basis of written submissions. The parties have leave to apply for any further directions, or any additional time, they might require. Costs are reserved.

Orders

Orders of the court

Background

Background to the litigation

Evidence

Evidence Before The Court

Decision

Reasons for decision

Ratio Decidendi

Legal Principle Established