IN THE HIGH COURT OF NEW ZEALAND CHRISTCHURCH REGISTRY
CIV-2013-409-000046 [2014] NZHC 1322
BETWEEN EXTERIOR BUILDING CARE
GOLEMAN LIMITED Plaintiff
AND
AFO INDUSTRIAL LIMITED (IN LIQUIDATION) (FORMERLY CALLED AIR FLUID OTAGO LIMITED) Defendant
AND
TREVOR EDWIN LAING AS LIQUIDATOR OF DEFENDANT COMPANY
Associated Respondent
Hearing: 26 and 27 May 2014 Appearances:
D A Webb and R G McCrea for Plaintiff
No Appearance for Defendant
No Appearance for Liquidator of DefendantJudgment:
12 June 2014
JUDGMENT OF GENDALL J
Introduction and factual background
[1] This case concerns the supply of goods and services by AFO Industrial Limited (In Liquidation) (AFO) for a construction project undertaken by the plaintiff Exterior Building Products Goleman Limited (Goleman) involving technical rock stabilisation work after the Canterbury earthquakes.
[2] The rock stabilisation work to be undertaken by Goleman involved the securing of a cliff face at McCormacks Bay, Christchurch, against the risk of rock fall.
Part of the work involved the drilling of anchors into the rock face to which netting
EXTERIOR BUILDING CARE GOLEMAN LIMITED v AFO INDUSTRIAL LIMITED (IN LIQUIDATION) (FORMERLY CALLED AIR FLUID OTAGO LIMITED) [2014] NZHC 1322 [12 June 2014]
systems could then be attached. The anchors were to be placed in deep holes in the rock face and secured by grout.
[3] Goleman’s role was to carry out the stabilisation work under a subcontract with Fulton Hogan Limited (Fulton Hogan) implementing an arrangement with the Stronger Christchurch Infrastructure Rebuild Team (SCIRT).
[4] The goods and services supplied by AFO to Goleman to enable it to carry out the subcontract, were the components for a specialist simultaneously drilling and grouting system (the SDA system). The rock face drilling required a suspended drilling mechanism (a wagon drill unit) with grout injected into the drilled hole using a grout pump. In this case the contract was unusual because it seems on the advice of AFO, Goleman decided to use the SDA system method by which over 700 anchors of 50 mm diameter were themselves to be drilled into what was a mixture of pyroclastic material and competent basalt rock and simultaneously secured by grout, in each case to significant depths varying between four and eight metres. This method was to use what are known as self drilling anchors (SDAs), and as I understand the position, it, was the largest contract of its type to be completed in New Zealand in 2012.
[5] The contractual arrangements between Goleman and AFO included:
(a) The purchase of one wagon drill and a grout pump at a price of
$67,235 plus GST of which $33,618 plus GST has been paid by
Goleman.
(b)The hire of one other wagon drill and a grout pump at the rate of $445 per day. No payments have been made under that contract.
(c) The sale of a substantial quantity of SDAs and ancillary components at a price of $179,141.40 plus GST. This sum has been paid in full by Goleman.
(d)Goleman claims that it was also agreed AFO would provide ongoing support…
Keep reading for free
Create a free CaseChat account to read Exterior Building Care Goleman Limited v Laing and more:
- Read every judgment in full
- Ask AI and get answers linked to paragraphs
- See how each paragraph was cited in later cases
- Download judgments as PDF or Word
One click creates your free account or signs you in.
By continuing you agree to the Terms and Privacy Policy.
- Case
- [2014] NZHC 1322
- Decision Date
CaseChat Overview and Summary
Orders
Orders of the court
Background
Background to the litigation
Evidence
Evidence Before The Court
Decision
Reasons for decision
Ratio Decidendi