IN THE HIGH COURT OF NEW ZEALAND AUCKLAND REGISTRY

CIV-2014-404-1182 [2014] NZHC 1454

UNDER THE UNIT TITLES ACT 2010

BETWEEN

BODY CORPORATE 341188
First Plaintiff

DARREN COTTINGHAM AND MICHAEL ELLIOTT as trustees of the LINCOLN TRUST

Second Plaintiffs

AND

STEPHEN ROBERT KELLY AND THE FINAL HARGREAVES TRUST COMPANY LIMITED

First Defendant

ALLENBY GROUP NZ LTD Second Defendant

SOCIAL IMPACT STRATEGIES LIMITED

Third Defendant

Hearing: 17 June 2014

Appearances:

P K McGrath & T M Bates for plaintiff applicants
T Bowler for the first and third defendant repondents

Judgment:

26 June 2014

JUDGMENT OF WINKELMANN J

This judgment was delivered by me on 26 June 2014 at 3.00 pm pursuant to

Rule 11.5 of the High Court Rules.

Registrar/ Deputy Registrar

BODY CORPORATE 341188 v KELLY [2014] NZHC 1454 [26 June 2014]

[1]      The respondents are building on the roof of an existing apartment building in Hargreaves Street, St Mary’s Bay, converting “future development units”1 they own into  residential  apartments.    Beneath  the  development  site  are  four  floors  of residential apartments.  The first applicant is the body corporate for the apartment building, and the second applicants are the registered proprietors of one unit in the apartment  building.    The  applicants  say the  respondents’ construction  work  has

caused damage to the building, allowing water to enter the structure of the building when it rains, and some of the apartments beneath the construction zone.   The applicants allege that the respondents should have taken steps to ensure the building remained watertight before they began building, and that their failure to do so is negligent, a nuisance and a breach of their obligations under the Unit Titles Act

2010.

[2]      As a result of the water ingress, the applicants say that the body corporate’s insurer has now excluded all cover for water damage claims, and for any claims arising from the respondents’ construction work.  It has also signalled its intention to withdraw all cover from 30 June 2014 if the building is not watertight by then.  The applicants also allege that the leaks caused by the respondents have caused physical damage to the building and to some apartments.

[3]      The applicants seek an injunction:

1.Restraining the respondents from carrying out any construction work to any part of the apartment building until the trial of this action.

2.Restraining the respondents from transferring any interest in future development units to any other party, as such a transfer may defeat the restraint of work.

3.        Allowing the applicants or their agents to enter the respondents’ units

on level 5, between 9 am and 5 pm Monday to Saturday to make level

5 watertight.

1      In  terms  of  the  Unit  Titles Act  2010,  a  future  development  unit  is  a  unit  proposed  for development at a later stage of the development, that is shown on a stage unit plan as a future development unit.

[4]      There is some procedural history that must be traversed to make sense of the point now reached in this proceeding.  The application for injunction was initially called…

CaseChat AU logo

Keep reading for free

Create a free CaseChat account to read Body Corporate 341188 v Kelly and more:

  • Read every judgment in full
  • Ask AI and get answers linked to paragraphs
  • See how each paragraph was cited in later cases
  • Download judgments as PDF or Word
Continue with Google

One click creates your free account or signs you in.

By continuing you agree to the Terms and Privacy Policy.

Details
Case
[2014] NZHC 1454
Decision Date

CaseChat Overview and Summary

In Body Corporate 341188 v Kelly, the applicants sought an injunction to restrain the respondents from continuing construction on the roof of an existing apartment building. The applicants, the body corporate and unit owners of the building, alleged that the respondents' construction work had caused water ingress into the building, leading to damage. They sought an injunction to stop the construction work until the trial of the action, and to allow them or their agents to enter the respondents' units to make level 5 watertight. The court appointed an expert to assess the situation, who concluded that construction needed to stop to enable inspection of existing water ingress issues, and that the best solution was a shrinkwrap membrane. The parties were able to negotiate consent orders which were made, but the applicants later sought to vary these orders due to alleged breaches by the respondents. The respondents offered to consent to new orders that they stop work on the exterior of the building, and to shrinkwrap promptly the building in accordance with a detailed quote obtained. However, the applicants were not content with the proposed consent orders. The court considered the principles applying where a mandatory interim injunction is sought, and ultimately declined to make the orders sought by the applicants, but granted orders that the respondents undertake remedial work to the temporary waterproofing, and engage a shrinkwrapping company to undertake the programme of works to create shrinkwrapping of the property. The respondents were also required to engage a project manager with suitable building qualifications, and attend to the shrinkwrapping twice weekly to ensure it remained adequately in place. The costs of the shrinkwrapping were initially to be borne by the respondents.

Orders

Orders of the court

Background

Background to the litigation

Evidence

Evidence Before The Court

Decision

Reasons for decision

Ratio Decidendi

Legal Principle Established