Medium Neutral Citation: WorkCover Authority of New South Wales v JMW Developments Pty Limited [2015] NSWDC 259 Hearing dates: 08/07/2015 Decision date: 08 July 2015 Jurisdiction: Criminal Before: Kearns DCJ Decision: The defendant is convicted and fined the sum of $75,000 with a moiety to the prosecution. The defendant is to pay the prosecutor’s costs agreed in the sum of $14,000.
Catchwords: Work Health and Safety Act 2011 ss 19(1) and 32 – guilty plea – worker suffered electric shock when placing metal reinforcing in building blocks from scaffolding erected a few meters from live power lines on construction site of residential development – failure by head contractor to ensure scaffolding was installed safe distance from power lines and that appropriate safe work method statement was in place, risk assessment undertaken – foreseeability of risk – foreseeability of consequences – preventability of risk – specific deterrence – general deterrence – no prior convictions – good corporate standing of the defendant – remorse and contrition – discount for early guilty plea and co-operation with regulatory authority – consideration of the parity principle – consideration of whether costs may be taken into account in assessing penalty Legislation Cited: Work Health and Safety Act 2011; Crimes (Sentencing Procedure) Act 1999 Category: Sentence Parties: WorkCover Authority of New South Wales (prosecutor)
JMW Developments Pty Limited (defendant)Representation: Counsel:
Mr C Magee appeared for the prosecutor
Mr S Stanton appeared for the defendant
File Number(s): 13/379509
Judgment
-
Mr Rohimi suffered an electric shock on 26 April 2012. At the time, he was working on a construction of a commercial residential development at 7 Stewart Avenue, Hammondville. He was working on scaffolding on the first floor of the construction. The scaffolding was outside the building. He was placing metal poles in cavities of building blocks. Those building blocks had been used in the construction of a wall. The metal poles were to act as reinforcing for a concrete pour the following day. The scaffolding had been erected within a few metres of live power lines. Mr Rohimi placed a number of poles in position without mishap. On one instance however, a pole he was handling to put in position, contacted the low voltage power line and he suffered the electric shock.
-
The defendant was the head contractor or principal contractor on the site where the development was being undertaken. One of its directors was Mr Dagher. He was responsible for the onsite operations of the defendant. Ultra Group Pty Ltd, had contracted with the defendant to install the scaffolding. E&T Bricklaying Pty Ltd had contracted for the defendant to perform labouring and bricklaying work. Mr Rohimi was employed by E&T as a bricklayer.
-
There is some confusion in the material as to whether the installation of the scaffolding had in fact been completed at the time of the incident. Mr Dagher had a belief that it had been completed. In a record of interview with WorkCover after the event, he stated…
Keep reading for free
Create a free CaseChat account to read WorkCover Authority of New South Wales v JMW Developments Pt... and more:
- Read every judgment in full
- Ask AI and get answers linked to paragraphs
- See how each paragraph was cited in later cases
- Download judgments as PDF or Word
One click creates your free account or signs you in.
By continuing you agree to the Terms and Privacy Policy.
- Case
- [2015] NSWDC 259
- Decision Date
CaseChat Overview and Summary
The court assessed the foreseeability of the risk and concluded that it was reasonably foreseeable that scaffolding placed near live power lines could result in an electric shock. The court also found that the consequences of such a risk were foreseeable, and that the risk was preventable through the implementation of adequate safety measures. In determining the penalty, the court took into account the early guilty plea, cooperation with the regulatory authority, the absence of prior convictions, the good corporate standing of the defendant, and the remorse and contrition expressed by the defendant. The court also considered the principles of specific and general deterrence, as well as the parity principle, which seeks to ensure consistency in penalties for similar offences. The court ultimately determined that a fine of $75,000 was appropriate, with a moiety to the prosecution, and ordered the defendant to pay the prosecutor’s costs in the sum of $14,000.
In summary, the court found JMW Developments Pty Limited guilty of breaching work health and safety laws and imposed a penalty of $75,000, with a moiety to the prosecution, and ordered the defendant to pay agreed costs of $14,000. The court's decision was based on the foreseeability and preventability of the risk, as well as various factors considered in assessing the appropriate penalty.
Orders
Orders of the court
The defendant is convicted and fined the sum of $75,000 with a moiety to the prosecution. The defendant is to pay the prosecutor’s costs agreed in the sum of $14,000.
Background
Background to the litigation
Evidence
Evidence Before The Court
Decision
Reasons for decision
Ratio Decidendi