Water Sharing Plan for the Murrumbidgee Regulated River Water Source 2003 (NSW)

Case
No judgment structure available for this case.

Water Sharing Plan for the Murrumbidgee Regulated River Water Source 2003

[2002-1038]


Status information

Currency of version
Historical version for 25 October 2013 to 21 November 2013 (accessed 26 December 2018 at 04:04)
Legislation on this site is usually updated within 3 working days after a change to the legislation.

Provisions in force
The provisions displayed in this version of the legislation have all commenced. See Historical Notes

Does not include amendments by:
Local Land Services Act 2013 No 51 (not commenced — to commence on 1.1.2014)
Note:
In incorporating the amendments made by the Water Management (Minister’s Plans) Order No 2 of 2004, published in Gazette No 110 of 1.7.2004, p 5072, changes have been made to the numbering of some of the provisions to maintain appropriate numerical or alphabetical order.
Note:
This Plan ceases to have effect on 1.7.2014—see cl 3.

Authorisation
This version of the legislation is compiled and maintained in a database of legislation by the Parliamentary Counsel's Office and published on the NSW legislation website, and is certified as the form of that legislation that is correct under section 45C of the Interpretation Act 1987.

File last modified 25 October 2013.

Water Sharing Plan for the Murrumbidgee Regulated River Water Source 2003

[2002-1038]


Contents

Water Sharing Plan for the Murrumbidgee Regulated River Water Source 2003

Part 1 Introduction

1   Name of plan

This Plan is the Water Sharing Plan for the Murrumbidgee Regulated River Water Source 2003 (hereafter this Plan).

2   Nature and status of this Plan

(1) This Plan is made under section 50 of the Water Management Act 2000 as amended (hereafter the Act).
(2) This Plan covers the core provisions of section 20 of the Act for water sharing, and additional provisions of section 21 of the Act, and other relevant matters.

3   Date of commencement

This Plan takes effect on 1 July 2004.

Note.

 

1   

In accordance with section 43 of the Act, this Plan will have effect for 10 years from 1 July 2004.

2   

The Minister may extend this Plan for a further period of 10 years after it is due to expire, in accordance with section 43A of the Act.

4   Water source and waters to which this Plan applies

(1)  This Plan applies to the Murrumbidgee Regulated River Water Source (hereafter this water source) within the Murrumbidgee Water Management Area and the Murray Water Management Area.

Note.

The Murrumbidgee Water Management Area and Murray Water Management Area were constituted by Ministerial order made under section 11 of the Water Management Act 2000 published in the NSW Government Gazette No 180 on 23 November 2001 at page 9389.
(2)  This water source is shown on the Plan Map called Plan Map (WSP0027_Version 1), Water Sharing Plan for the Murrumbidgee Regulated River Water Source 2003 (hereafter the Plan Map) held by the Department.

Note.

 An overview of the Plan Map is shown in Appendix 1. Copies of the Plan Map may be inspected at the office listed in Appendix 2.
(3)  Subject to subclause (4), this water source includes all water:
(a)  between the banks of all rivers from the upper limit of Burrinjuck Dam water storage and Blowering Dam water storage downstream to the junction of the Murrumbidgee River and the Murray River, which at the date of commencement of this Plan, have been declared by the Minister to be regulated rivers,

Note.

 A regulated river is a river that has been declared by the Minister, by Order published in the New South Wales Government Gazette, to be a regulated river.

Note.

 The rivers declared by the Minister to be regulated rivers in the Murrumbidgee Regulated River Water Source are listed in Appendix 3.
(b)  occurring naturally on the surface of the ground or in rivers, lakes and wetlands in the area marked as Lowbidgee shown on the Plan Map.
(4)  This water source does not include water contained in:
(a)  any alluvial sediments, fractured rocks or porous rocks,
(b)  Talpee Creek,
(c)  Lake Tala, and
(d)  Five Mile Lagoon.

5   Interpretation

(1)  Terms that are defined in the Act have the same meaning in this Plan and the effect of these terms may be explained in Notes.
(2)  Additional terms to those identified in subclause (1) are defined in Schedule 1.
(3)  Notes in this Plan do not form part of this Plan.
(4)  Schedules to this Plan form part of this Plan.
(5)  Appendices to this Plan do not form part of this Plan.
(6)  A reference to a supplementary water access licence in this Plan does not include a supplementary water “Lowbidgee” access licence.

6   Effect on licences, authorities and permits under the Water Act 1912

(1)  This Plan applies from the date of commencement to those matters that are being administered under the Act, at that time.
(2)  This Plan applies to other matters from the date the relevant provisions of the Act are commenced.

Note.

 To the extent possible, the rules embodied in this Plan will apply to matters administered under the Water Act 1912 in the interim.

7   State Water Management Outcomes Plan

(1)  This Plan is consistent with the State Water Management Outcomes Plan (hereafter SWMOP) in accordance with section 16 (1) (a) of the Act.
(2)  Schedule 2 identifies the SWMOP targets applicable to this Plan and how this Plan contributes to those targets.

Note.

The SWMOP applying at the commencement of this Plan is that gazetted on 20 December 2002 under section 6 of the Act.

Part 2 Vision, objectives, strategies and performance indicators

8   Vision, objectives, strategies and performance indicators

This Part is made in accordance with section 35 (1) of the Act.

9   Vision

The vision for this Plan is to provide for equitable sharing of limited water resources to sustain a healthy and productive river and the welfare and well being of Murrumbidgee regional communities.

10   Objectives

The objectives of this Plan are to:
(a)  protect and restore in-river and riparian habitats and ecological processes,
(b)  provide for appropriate watering regimes for wetlands,
(c)  sustain and enhance population numbers and diversity of indigenous species,
(d)  protect basic landholder rights, as specified in the Water Management Act 2000, including native title rights,
(e)  maximise early season general security allocations,
(f)  protect town water supply,
(g)  protect end-of-system flows,
(h)  provide for commercial consumptive use,
(i)  provide for identified recreational water needs,
(j)  protect identified indigenous and traditional uses of water, and
(k)  within the ability of this Plan promote the recovery of known threatened species.

11   Strategies

The strategies for reaching the objectives set out in clause 10 are to:
(a)  establish environmental water provisions (Part 3 of this Plan),
(b)  identify water requirements for basic landholder rights (Part 4 of this Plan),
(c)  identify water requirements for access licences (Part 6 of this Plan),
(d)  establish rules for granting of access licences (Part 7 of this Plan),
(e)  establish provisions that place limits on the availability of water (Part 8 of this Plan),
(f)  establish rules for making available water determinations (Part 8 of this Plan),
(g)  establish rules for the operation of water allocation accounts (Part 9 of this Plan),
(h)  establish provisions specifying circumstances under which water may be extracted (Part 9 of this Plan), and
(i)  establish access licence dealing rules (Part 10 of this Plan).

12   Performance indicators

The following indicators are to be used to determine the performance of this Plan against its objectives:
(a)  change in low flows,
(b)  change in moderate to high flows,
(c)  change in water quality in this water source,
(d)  change in ecological condition of this water source and dependent ecosystems,
(e)  change in economic benefits derived from water extraction and use,
(f)  extent to which basic landholder rights requirements have been met,
(g)  extent to which local water utility requirements have been met,
(h)  extent to which native title rights have been met, and
(i)  extent of recognition of spiritual, social and customary values of water to Aboriginal people.

Note.

 Appendix 4 details the objectives to which these performance indicators relate and the methods for assessing indicators.

Part 3 Environmental water provisions

13   Environmental water provisions

This Part is made in accordance with sections 5 (3), 8 (1), 8 (2) and 20 (1) (a) of the Act.

14   Planned environmental water

(1)  This Plan establishes the following planned environmental water rules:
(a)  water volume in excess of the long-term average annual extraction limits in clauses 32 and 32A of this Plan may not be taken from this water source and used for any purpose, and
(b)  access to water is to be managed as specified in clauses 34 and 34A of this Plan to ensure water volume in excess of the long-term extraction limit is not being taken.

Note.

 Based on modelled diversions it is estimated that this Plan will:
(a)  after its 5th year, limit Murrumbidgee extractions to around 1,890,000 megalitres per year, on average over the long term, and
(b)  limit Lowbidgee extractions to around 296,000 megalitres per year, on average over the long term.
By doing this, this Plan will ensure that approximately 50% of the long-term average annual flow in this water source (estimated to be 4,360,000 megalitres per year) will be preserved and contribute to the maintenance of basic ecosystem health.
(2)  Until 1 July 2008 a minimum daily flow of 200 megalitres per day shall be maintained in the Murrumbidgee River at Balranald, when the sum of available water determinations to regulated river (general security) access licences plus water allocations carried over in water allocation accounts, is less than 80% of share components, which cannot be used to meet access licence water requirements or basic landholder rights requirements below Balranald.
(3)  Until 1 July 2008 a minimum daily flow of 300 megalitres per day shall be maintained in the Murrumbidgee River at Balranald, when the sum of available water determinations to regulated river (general security) access licences plus water allocations carried over in water allocation accounts, is equal to or greater than 80% of share components, which cannot be used to meet access licence water requirements or basic landholder rights requirements below Balranald.
(4)  From 1 July 2008 a minimum daily flow shall be maintained in the Murrumbidgee River at Balranald, throughout the water year, which cannot be used to meet access licence water requirements or basic landholder rights requirements below Balranald and is calculated using the following formula:

where the 95th percentile natural daily flow is the computer model generated natural, that is pre-regulation, daily flows for each month, over the entire modelled period, that is exceeded in 95% of days in that month, as calculated using the hydrologic computer model that, at the time, is approved by the Minister for determining natural flows in this water source.

15   Planned environmental water

(1)  This clause establishes the planned environmental water rules for this Plan.
(2)  Transparent releases shall be made from Blowering Dam water storage in accordance with the following rules:
(a)  when natural inflows are less than 560 megalitres per day then the release from Blowering Dam must be greater than or equal to natural inflows plus any water use (other than basic landholder rights use) expected to occur between the dam and the confluence with the Murrumbidgee River, and
(b)  when natural inflows are greater than 560 megalitres per day then the minimum release from Blowering Dam is to be 560 megalitres per day plus the volume of water use (other than basic landholder rights use) expected to occur between the dam and the confluence with the Murrumbidgee River.
(3)  A transparent release volume for Burrinjuck Dam water storage shall be calculated each day and shall be the lesser of:
(a)  the volume of inflows to the storage over the previous 24 hour period, and
(b)  615 megalitres.
(4)  On each day between 22 April and 21 October, when Burrinjuck Dam water storage inflows are greater than 615 megalitres per day, the catchment condition for the Burrinjuck Dam catchment will be assessed by:
(a)  comparing the average flow in the Goodradigbee River at Wee Jasper over the preceding 24 hour period with the flows listed for the corresponding date in the table in Schedule 3,
(b)  when the Goodradigbee flow is less than or equal to the flow listed in column 2 of the table in Schedule 3 the catchment condition shall be deemed to be dry,
(c)  when the Goodradigbee flow is greater than the flow listed in column 2 of the table in Schedule 3 but less than the flow listed in column 3 of the table in Schedule 3 the catchment condition shall be deemed to be normal, and
(d)  when the Goodradigbee flow is equal to or greater than the flow listed in column 3 of the table in Schedule 3 the catchment condition shall be deemed to be wet.
(5)  On each day between 22 April and 21 October a Burrinjuck Dam translucent release volume shall be calculated by multiplying the calculated Burrinjuck Dam water storage inflow over the previous 24 hours and the appropriate percentage from the table in Schedule 4, using the catchment condition classification determined in subclause (4), and at all other times the translucent release volume shall be zero.
(6)  Unless operational constraints prevent all or part of this release being made, the release during the succeeding 24 hours from Burrinjuck Dam shall be made according to the following:
(a)  if the volume calculated under subclause (3) and subclause (5) is less than 300 megalitres, the release shall be 300 megalitres,
(b)  if the volume calculated under subclause (3) is greater than or equal to the volume calculated under subclause (5), the release shall be made according to the following:
(i)  if the volume calculated under subclause (3) is greater than 300 megalitres but less than or equal to 450 megalitres, the release shall be that volume, and
(ii)  if the volume calculated under subclause (3) is greater than 450 megalitres but less than or equal to 615 megalitres, the release shall be 450 megalitres,
(c)  if the volume calculated under subclause (5) is greater than the volume calculated under subclause (3), the release shall be made according to the following:
(i)  if the volume calculated under subclause (5) is less than 1,000 megalitres, the release shall be the volume calculated under subclause (5) less 315 megalitres per day, and
(ii)  if the volume calculated under subclause (5) is greater than 1,000 megalitres and less than 10,000 megalitres, the release shall be the volume calculated under subclause (5) less the sum of:
(1)  where the daily release balance (hereafter the DRB) volume (as per subclause (23)) is greater than zero, the lesser of 10% of the volume calculated under subclause (5) or the DRB volume, and
(2)  315 megalitres per day, and
(iii)  if the volume calculated under subclause (5) is greater than, or equal to 10,000 megalitres, the release shall be the volume calculated under subclause (5),
(d)  the daily release shall be equal to the inflow to the storage over the previous 24 hours or 300 megalitres (whichever is the greater), plus the volume of any water use (other than basic landholder rights use) expected to occur between Burrinjuck Dam and the Tumut River confluence, up to a maximum of 615 megalitres, if either of the following conditions are met:
(i)  if the release made over each of the previous 10 days has been 450 megalitres, and the release otherwise calculated under subclause (6) would again be 450 megalitres, or
(ii)  a release was made under subclause (6) (d) (i) over the previous 24 hour period but not the 24 hour period preceding it, and
(e)  where the volume necessary to supply access licence requirements and other requirements identified in this Plan exceeds the release volume calculated under subclauses (a) to (d), it shall be taken as the release.
(7)  If some or all of the volume determined in subclause (6) cannot be released in the succeeding 24 hours due to system operation constraints, then the shortfall shall be added to the minimum release requirement (up to the limit of system operational constraints) for the succeeding day(s) until released.
(8)  An environmental water allowance (hereafter EWA1) shall be established and managed according to the following:
(a)  the EWA1 shall be credited when the sum of available water determinations for regulated river (general security) access licences during the water year and the water carried over in regulated river (general security) access licence water allocation accounts from the previous water year is equivalent to or greater than 0.6 megalitres multiplied by the total number of unit shares specified in regulated river (general security) access license share components,
(b)  the volume credited to the EWA1 shall be the volume of water in excess of that required to meet the trigger specified in subclause (8) (a), up to a maximum of 50,000 megalitres in any water year, subject to subclause (8) (d) (iv),
(c)  releases of EWA1 cannot be used by access licences or to meet water requirements in another water source that result from an assignment of water allocations from an access licence water allocation account,
(d)  up to 50,000 megalitres may be made available for use as additional EWA1 in the current water year, subject to the following:
(i)  the additional volume shall be made available from the second provisional storage volume established under clause 62 (3), and shall not exceed the water available in the second provisional storage volume,
(ii)  a need for releases under subclause (11) has occurred,
(iii)  there is no water remaining in the EWA1, the second environmental water allowance established under subclause (9) and the third environmental water allowance established under subclause (10), and
(iv)  the volume credited to EWA1 in the following year shall be reduced by the additional volume made available from the second provisional storage volume under subclause (8),
(e)  any EWA1 remaining at the end of each water year may be carried over to the next water year, up to a maximum of 50,000 megalitres,
(f)  during any flow event where water is spilled from Blowering Dam or Burrinjuck Dam, EWA1 carried over from the previous water year will be reduced in proportion to the volume of water spilled, up to a limit of 50% of the volume of EWA1 carried over from the previous water year, and
(g)  at the commencement of this plan a volume equivalent to the water remaining in the environmental contingency allowance immediately prior to the commencement of this Plan, shall exist in the EWA1.
(9)  A second environmental water allowance (hereafter EWA2) shall be established and managed according to the following:
(a)  whenever a transparent release from Burrinjuck Dam is made under subclause (6) (b), the EWA2 shall be credited with a volume equal to the lesser of:
(i)  the inflow to the storage over the previous 24 hours, or
(ii)  615 megalitres,
minus 300 megalitres,
(b)  each day that translucent releases from Burrinjuck Dam are made under subclause (6) (c), a volume of 315 megalitres shall be credited to the EWA2,
(c)  releases of EWA2 cannot be used by access licence holders or to meet water requirements in another water source that result from a transfer of access licence account water,
(d)  any water remaining in the EWA2 at the end of each water year that was not carried forward from the previous water year may be carried over to the following water year without limit, and
(e)  water remaining in the EWA2 at the end of each water year that was carried over from the previous water year may not be carried over again to the following water year.
(10)  A third environmental water allowance (hereafter EWA3) shall be established and managed according to the following:
(a)  the EWA3 shall have a maximum limit each water year, which shall be the total of:
(i)  the cumulative total of the difference between the translucent release volume from subclause (6) (c) and the translucent release volume calculated using Schedule 5, prior to 1 November in that water year, and
(ii)  the cumulative total of the difference between the translucent release volume from subclause (6) (c) and the translucent release volume calculated using Schedule 5 for the period 22 April to 30 June of the previous water year,

Note.

 This is the difference between the translucent releases in Schedule 4 and Schedule 5, which is known as foregone translucent release.
(b)  the EWA3 shall be credited when the sum of available water determinations made for regulated river (general security) access licences plus water carried over in regulated river (general security) access licence water allocation accounts from the previous water year are equivalent to or greater than 0.8 megalitres multiplied by the total number of unit shares specified in regulated river (general security) access licence share components, and
(c)  the volume credited to the EWA3 shall be the volume of water in excess of the trigger specified in subclause 10 (b), subject to:
(i)  the maximum limit of the EWA3 at the time when available resources are assessed, between 1 July and 31 October,
(ii)  between 1 November and 31 December, the EWA3 shall be credited with 50% of the water determined using the trigger specified in subclause (10) (b),
(iii)  the other 50% of the water determined using the trigger specified in subclause (10) (b) but not credited to the EWA3 shall be credited to the second provisional storage volume established under clause 62 (3),
(iv)  the EWA3 shall not be credited from 1 January to 30 June of the current water year,
(v)  releases of the EWA3 cannot be used by access licence holders or to meet water requirements in another water source that result from a transfer of access licence account water,
(vi)  on 1 November, 50% of the EWA3 at that time, shall be transferred to the second provisional storage volume established under clause 62 (3), and
(vii)  on 1 January all remaining EWA3 shall be transferred to the second provisional storage volume established under clause 62 (3).
(11)  Release of the EWA1, EWA2 and EWA3 are to be made to provide environmentally beneficial outcomes for water bird breeding, wetland inundation, fish passage and breeding and water quality,
(12)  Release of the EWA1, EWA2 and EWA3 shall endeavour to provide maximum environmental benefit and be made to the maximum extent possible,
(13)  Release of the EWA1, EWA2 and EWA3 shall be made in the following order:
(a)  the EWA3 first,
(b)  then the EWA2 that has been carried over from the previous water year,
(c)  then the remaining EWA2,
(d)  then the EWA1 that has been carried over from the previous water year,
(e)  then the EWA1, and
(f)  then the EWA1 made available from the second provisional storage volume.
(14)  Before the commencement of each water year, detailed release rules for the EWA1, EWA2 and EWA3 should be developed which address the ecological objectives specified in subclauses (11) and (12),
(15) An Environmental Water Allowance Reference Group should be established by the Minister under section 388 of the Act for the purpose of providing advice on the release rules developed under subclause (14).

Note.

 The Environmental Water Allowance Reference Group should be established prior to the commencement of this Plan
(16)  In providing advice in accordance with subclause (15) the Environmental Water Allowance Reference Group should have regard to:
(a)  the objectives of this Plan,
(b)  the principles of adaptive management, and
(c)  the ecological objectives specified in subclauses (11) and (12).
(17)  If advice cannot be provided by the Environmental Water Allowance Reference Group under subclause (15) releases from the environmental water account shall be approved by the Minister, in accordance with the ecological objectives specified in subclauses (11) and (12) and the release rule specified in subclause (13).
(18)  The Environmental Water Allowance Reference Group established under subclause (15) should consist of 9 members each with a nominated alternate member representing:
(a)  Nature Conservation Council or its subsequent organisation,
(b)  Murrumbidgee Field Naturalists or its subsequent organisation,
(c)  Murrumbidgee Customer Service Committee (upper river) or its subsequent organisation,
(d)  Murrumbidgee Customer Service Committee (mid river) or its subsequent organisation,
(e)  Lowbidgee League or its subsequent organisation,
(f)  New South Wales Fisheries, or its subsequent organisation,
(g)  New South Wales National Parks and Wildlife Service, or its subsequent organisation,
(h)  State Water or its subsequent organisation, and
(i)  the Department of Infrastructure Planning and Natural Resources or its subsequent organisation.
(19)  Members of the Environmental Water Allowance Reference Group should be appointed for a period of 5 years.
(20)  Members of the Environmental Water Allowance Reference Group should elect the Chair.
(21)  A quorum of the Environmental Water Allowance Reference Group should be two community representatives and two representatives of Government Agencies.
(22)  The Environmental Water Allowance Reference Group should report and communicate on its activities in accordance with procedures established by the Minister.
(23)  A DRB volume shall be calculated according to the following:
(a)  whenever a dam release made over a 24 hour period under subclause (6) (b) is greater than 300 megalitres, the DRB volume shall be increased by the release less 300 megalitres,
(b)  whenever releases are made under subclause (6) (c) (ii) the DRB volume shall be reduced by 10% of the volume calculated under subclause (5) for the previous 24 hours, until the DRB volume is calculated to be zero, and
(c)  the DRB volume shall be calculated continuously from each water year to the next.

Note.

 The DRB is calculated to maintain a continuous record of the net difference between the minimum translucent dam releases made under this Plan and water credited to environmental water allowances under this Plan.
(24)  Pursuant to section 45 (1) (b) of the Act and clause 72 of this Plan, the Minister may amend the planned environmental water rules under clause 15 to the extent specified in clause 72.

16   Adaptive environmental water

(1)  At any time an access licence holder may, by a process determined by the Minister, commit all or part of their licence as adaptive environmental water.
(2) The Minister may grant an access licence in a water source to which this Plan applies if the licence is subject to an adaptive environmental water condition and arises through water savings in the system made in that water source as referred to in section 8C (1) of the Act.
(2A) The Minister may change the category or subcategory of an access licence in a water source to which this Plan applies if the licence is subject to an adaptive environmental water condition that arises through water savings as referred to in section 8D of the Act.
(3)  At the commencement of this Plan there are no access licences committed to an environmental purpose in accordance with section 8 (1) (c) of the Act.

Part 4 Basic landholder rights

17   Basic landholder rights

This Part is made in accordance with sections 5 (3) and 20 (1) (b) of the Act.

18   Domestic and stock rights

Note.

 It is not recommended that the water from this water source be consumed without prior treatment. Land use activities may have polluted the water in some areas.
(1)  At the commencement of this Plan the water requirements of holders of domestic and stock rights are estimated to be 4,560 megalitres per year.
(2)  This Plan recognises that the exercise of domestic and stock rights may increase during the term of this Plan.

Note.

 Increase in use of domestic and stock rights may occur as a result of an increase in the number of landholdings fronting this water source or as a result of an increase in the exercise of domestic and stock rights by existing landholders.

Note.

 At the commencement of Part 2 of Chapter 3 of the Act in the area marked as Lowbidgee on the Plan Map, the water requirements of holders of domestic and stock rights in the area marked as Lowbidgee on the Plan Map are estimated to total 34 megalitres per year.
(3)  The water supply system shall be managed so that it would be capable of maintaining supply to those exercising domestic and stock rights through a repeat of the worst period of low inflows to this water source represented in flow information held by the Department of Land and Water Conservation.
(4)  To achieve subclause (3) sufficient volumes of water must be set aside from assured inflows into this water source or in reserves held in Burrinjuck Dam water storage, Blowering Dam water storage or other water storage.

Note.

The Minister may issue an Order under section 323 or 328 of the Act to restrict the exercise of domestic and stock rights from this water source to protect the environment, for reasons of public health, or to preserve basic landholder rights.

18A   Harvestable rights

The requirement for water under harvestable rights in this water source is equal to the total amount of water that owners or occupiers of landholdings are entitled to capture and store pursuant to a harvestable rights order made under Division 2 of Part 1 of Chapter 3 of the Act.

19   Native title rights

Note.

 It is not recommended that the water from this water source be consumed without prior treatment. Land use activities may have polluted the water in some areas.
(1)  At the commencement of this Plan there are no holders of native title rights and therefore the water requirements for native title rights are estimated to be a total of 0 megalitres per year.
(2)  This Plan recognises that the exercise of native title rights may increase during the term of this Plan.

Note.

 Increase in use of native title rights may occur as a result of the granting of native title rights under the Commonwealth’s Native Titles Act 1993.
(3)  The water supply system shall be managed so that it would be capable of maintaining supply to those exercising native title rights through a repeat of the worst period of low inflows to this water source represented in flow information held by the Department of Land and Water Conservation.
(4)  To achieve subclause (3) sufficient volumes of water must be set aside from assured inflows into this water source or in reserves held in Burrinjuck Dam water storage, Blowering Dam storage or other water storage.

Part 5 Bulk access regime

20   Bulk access regime

(1)  This Part is made in accordance with section 20 (1) (d) of the Act.
(2)  This Plan establishes a bulk access regime for the extraction of water under access licences in this water source having regard to:
(a)  the environmental water provisions established under Part 3 of this Plan,
(b)  the requirements for basic landholder rights identified under Part 4 of this Plan, and
(c)  the requirements for water for extraction under access licences identified under Part 6 of this Plan.
(3)  The bulk access regime established under subclause (2):
(a)  establishes rules according to which access licences are granted as provided for in Part 7 of this Plan,
(b)  recognises and is consistent with the limits to the availability of water as provided for in Part 8 of this Plan,
(c)  establishes rules according to which available water determinations are to be made as provided for in Part 8 of this Plan,
(d)  recognises the effect of climatic variability on the availability of water as provided for in Part 8 of this Plan,
(e)  establishes rules with respect to the priorities according to which access licences are to be adjusted as a consequence of any reduction of the availability of water as provided for in Part 8 of this Plan, and
(f)  establishes rules according to which access licences are managed as provide for in Part 9 of this Plan.

Part 6 Requirements for water under access licences

21   Requirements for water under access licences

This Part is made in accordance with section 20 (1) (c) of the Act.

Note.

 The following clauses in this Part represent the total volumes or unit shares specified in the share components of access licences in this water source. The actual volume of water available at any time will depend on climate, access licence priority and the rules in this Plan.

22   Share component for domestic and stock access licences

It is estimated that at the time of commencement of Part 2 of Chapter 3 of the Act, the volume of domestic and stock access licences authorised to extract water from this water source will total approximately 35,572 megalitres per year.

23   Share component for local water utility access licences

It is estimated that at the time of commencement of Part 2 of Chapter 3 of the Act, the volume of local water utility access licences authorised to extract water from this water source will total approximately 23,403 megalitres per year.

24   Share component for regulated river (high security) access licences

It is estimated that at the time of commencement of Part 2 of Chapter 3 of the Act, the volume of regulated river (high security) access licences authorised to extract water from this water source will total approximately 298,021 unit shares.

25   Share component for regulated river (general security) access licences

It is estimated that at the time of commencement of Part 2 of Chapter 3 of the Act, the volume of regulated river (general security) access licences authorised to extract water from this water source will total approximately 2,043,432 unit shares.

26   Share component for Murrumbidgee Irrigation (conveyance) access licence

At the time of commencement of Part 2 of Chapter 3 of the Act, the share component of the Murrumbidgee Irrigation (conveyance) access licence will be 243,000 unit shares.

Note.

 This licence volume and the associated available water determinations in clause 40 reflects the increase in conveyance losses that Murrumbidgee Irrigation experience as regulated river (general security) access licence allocations increase.

27   Share component for Coleambally Irrigation (conveyance) access licence

At the time of commencement of Part 2 of Chapter 3 of the Act, the share component of the Coleambally Irrigation (conveyance) access licence will be 130,000 unit shares.

Note.

 This licence volume and the associated available water determinations in clause 41 reflects the increase in conveyance losses that Coleambally Irrigation Corporation Limited experience as regulated river (general security) access licence allocations increase.

28   Share component for supplementary water access licences

It is estimated that at the time of commencement of Part 2 of Chapter 3 of the Act, the volume of supplementary water access licences authorised to extract water from this water source will total approximately 220,000 unit shares.

28A   Share component for supplementary water (Lowbidgee) access licences

It is estimated that at the time of commencement of Part 2 of Chapter 3 of the Act in the area marked as Lowbidgee on the Plan Map, the volume of supplementary water (Lowbidgee) access licences authorised to extract water from this water source will total approximately 747,000 unit shares.

29   Changes to total share component

This Plan recognises that total requirements for extraction under access licences in each access licence category may change during the term of this Plan as a result of:
(a)  the granting, surrender, cancellation or non renewal of access licences, or
(b) variations to local water utility access licences arising from section 66 of the Act.

Part 7 Rules for granting access licences

30   Rules for granting access licences

(1)  This Part is made in accordance with section 20 (2) (b) and 63 of the Act, having regard to the limits to water availability in this water source and the need to protect its ecological health.
(2)  Access licences may be granted in this water source subject to any embargo on the making of applications for access licences made under Chapter 3 Part 2 Division 7 of the Act.
(3) The Minister should declare and embargo on the making of applications for access licences in this water source, other than for access licences of the following kinds:
(a)  local water utility access licences,

Note.

 Pursuant to sections 66 (3) and 66 (4) of the Act, the Minister may also vary a local water utility’s share component at 5 year intervals, or on application of the local water utility where there is rapid growth in population.
(b)  domestic and stock (domestic only) access licences,
(c)  regulated river (high security) (Aboriginal cultural) access licences, subject to the sum of regulated river (high security) (Aboriginal cultural) access licence share components not exceeding 2,150 megalitres per year,
(d)  specific purpose access licences for which applications are provided for under the regulations in accordance with section 61 (1) (a) of the Act, or
(e)  an access licence which will receive water allocations that reflect the volume of water saved as a result of works or other actions taken under the Snowy Water Inquiry Outcomes Implementation Deed.
(4)  In applying for a new access licence, the applicant must establish the purpose and circumstance relating to that access licence, and that the share or extraction component sought will be the minimum required to meet that purpose and circumstance.
(5)  Subclause (4) does not apply to an application for a new access licence arising from:
(a)  section 61 (1) (c), of the Act, where the right has been acquired by auction, tender or other open market process, or
(b)  an access licence dealing.

Part 8 Limits to the availability of water

Division 1 Long-term average annual extraction limit

31   Limits to the availability of water

(1)  This Division is made in accordance with sections 20 (2) (a) of the Act.
(2)  For the purposes of this Part, all extractions under:
(a)  supplementary water (Lowbidgee) access licences,
(b)  basic landholder rights in the area marked as Lowbidgee on the Plan Map, and
(c)  floodplain harvesting access licences issued for floodplain harvesting activities in the area marked as Lowbidgee on the Plan Map,
will be known as Lowbidgee extractions.
(3)  For the purposes of this Part, all extractions from this water source, excluding Lowbidgee extractions, will be known as Murrumbidgee extractions.

32   Volume of the long-term average annual extraction limit for Murrumbidgee extractions

(1)  This Plan establishes a long-term average annual extraction limit for Murrumbidgee extractions in this water source, which is the lesser of:
(a)  the long-term average annual extractions from this water source, excluding Lowbidgee extractions, that would occur with the water storages, access licence share components and water use development that existed in 1999/2000, and the water management rules defined in this Plan, or
(b)  the long-term average annual extractions, excluding Lowbidgee extractions, from this water source that would occur under the baseline conditions used for assessment of Cap under Schedule F of the Murray-Darling Basin Agreement.

Note.

 An assessment of the long-term average annual extractions that would result under the conditions specified under subclause (1) (a) has been made using the Murrumbidgee Integrated Quantity Quality Model scenario run number ‘50 EWA1 plus TT’. This indicates that at the commencement of this Plan a long-term average annual extraction volume of 1,925,000 megalitres would result.

Note.

 An assessment of the long-term average annual extractions that would result under the baseline conditions in subclause (1) (b) has been made using the Murrumbidgee Integrated Quantity Quality Model Cap scenario run number ‘721capm4’. This indicates a long-term average annual extraction volume of 1,980,000 megalitres would result.

Note.

 The long-term average annual extraction limit recognises the effect of climatic variability on the availability of water, in accordance with section 20 (2) (c) of the Act, as historic climate and river flow information is used in its determination.
(2) The values referred to in subclauses (1) (a) and (1) (b) shall be adjusted for any access licence dealing under section 71R or 71U of the Act.
(3)  If an access licence is cancelled as part of an arrangement to provide additional water to the Snowy River under the Snowy Water Inquiry Outcomes Implementation Deed the values referred to in subclauses (1) (a) and (1) (b) shall be reduced by a volume which appropriately reflects the licence share of water made available in this water source.
(4)  For the purposes of establishing the long-term average annual extraction limit specified in subclause (1) and auditing compliance with it, the following will be included:
(a)  all water extractions by all categories of access licences in accordance with the rules used for accounting of Cap diversions for Schedule E of the Murray-Darling Basin Agreement,
(b)  domestic and stock rights and native title rights extractions,
(c)  floodplain harvesting diversions determined to be taken for use in conjunction with extractions from this water source, and
(d)  assignment of water allocations from the water allocation accounts of access licences in this water source to the water allocation accounts of access licences in other water sources,
excluding Lowbidgee extractions.
(5)  For the purposes of establishing the long-term average annual extraction limit specified in subclause (1) and auditing compliance with it, the following will not be included:
(a)  minimum daily flows made in accordance with clause 64 of this Plan,
(b)  use of water pursuant to the planned environmental water rules under clauses 14 and 15 of this Plan, and
(c)  Lowbidgee extractions.
(6)  For the purposes of establishing the long-term average annual extraction limit specified in subclause (1) and auditing compliance with it, the assessed volume of extractions will be reduced by the volume of water allocations being assigned from the water allocation accounts of access licences in other water sources to the water allocation accounts of access licences in this water source.

Note.

Under section 8F of the Act the long-term average annual extraction limit is taken to be varied by the amount of any change to the amount of water committed as licensed environmental water. Water committed as licensed environmental water is not to be accounted for as extraction against the long-term average annual extraction limit. The variation in the long-term average annual extraction limit is to be determined in accordance with a methodology approved by the Minister and published in the Gazette.
(7)  The volume of reduction in relation to subclause (6) shall be that which is representative of:
(a)  practices as they existed in 1999/2000 in the case of an assessment under clause 33 (2) of the long-term average annual extraction volume resulting from subclause (1) (a),
(b)  baseline conditions used for assessment of Cap under Schedule F of the Murray Darling Basin Agreement in the case of an assessment under clause 33 (2) of the long-term average annual extraction volume resulting from subclause 1 (b), and
(c)  current day practices in the case of an assessment under clause 33 (3).

32A   Volume of the long-term average annual extraction limit for Lowbidgee extractions

(1)  This clause establishes a long-term average annual extraction limit for Lowbidgee extractions.
(2)  Subject to any variation under subclause (3), the long-term average annual extraction limit for Lowbidgee extractions in this water source is the long-term average annual extractions, excluding Murrumbidgee extractions, from this water source that would occur under Cap baseline conditions as agreed under the Murray-Darling Basin Agreement in Schedule 1 of the Water Act 2007 (of the Commonwealth).

Note.

 An assessment of the long-term average annual extraction that would result from the Cap baseline conditions specified in subclause (2) has been made using the Murrumbidgee Cap IQQM computer model with system file capppe20.iqq. This indicates a long-term average annual extraction volume of 296,000 ML at the commencement of this Plan.
(3) Following the surrender under section 77 of the Act and then the cancellation under section 77A (6) of the Act of an access licence used to supply water to the area marked as Lowbidgee on the Plan Map, the Minister may vary the respective long-term average annual extraction limit.

Note.

Under section 8F of the Act the long-term average annual extraction limit is taken to be varied by the amount of any change to the amount of water committed as licensed environmental water. Water committed as licensed environmental water is not to be accounted for as extraction. The variation in the long-term average annual extraction limit is to be determined in accordance with a methodology approved by the Minister and published in the Gazette.

33   Assessment of the long-term average annual extraction limit and current level of long-term average annual Murrumbidgee extractions

(1)  Assessment of the long-term average annual extraction limit established in clause 32 and the current level of long-term average annual Murrumbidgee extractions shall be carried out after the end of each water year, using the hydrologic computer model that, at the time, is approved by the Minister for assessing expected long-term Murrumbidgee extractions.
(2)  To assess the long-term average annual extraction limit established in clause 32, the model referred to in subclause (1) shall be set to represent as closely as possible the development and management conditions referred to in clause 32 (1) (a) and (b).
(3)  To assess the current level of long-term average annual Murrumbidgee extractions, the model referred to in subclause (1) shall be set to represent as closely as possible all water use development, supply system management and other factors affecting the quantity of long-term average annual Murrumbidgee extractions at the time of assessment.

34   Compliance with the long-term average annual extraction limit for Murrumbidgee extractions

(1)  The level of long-term average annual Murrumbidgee extractions may not be permitted to exceed the long-term average annual extraction limit specified in clause 32 (1).
(2)  Pursuant to subclause (1), if the volume specified in clause 32 (1) (a) is less than the volume specified in clause 32 (1) (b), the maximum available water determination in any water year for supplementary water access licences and, if necessary, the maximum sum of available water determinations for regulated river (general security) access licences shall, be reduced if it has been assessed that the current long-term average annual Murrumbidgee extractions exceed the long-term average annual extraction limit specified in clause 32 (1) by 3%, or half the difference between the volume specified in clause 32 (1) (a) and the volume specified in clause 32 (1) (b).
(3)  Pursuant to subclause (1), if the volume specified in clause 32 (1) (a) is not less than the volume specified in clause 32 (1) (b), the maximum available water determination in any water year for supplementary water access licences and, if necessary, the maximum sum of available water determinations for regulated river (general security) access licences, shall be reduced if it has been assessed that the current long-term average annual Murrumbidgee extractions exceeds the volume specified in clause 32 (1) (b).
(4)  The degree of reduction under subclauses (2) or (3) shall be to the degree that is assessed as necessary to return Murrumbidgee extractions to the levels defined by the long-term average annual extraction limit established in clause 32.
(5)  The first reduction method used under subclause (2) or (3) shall be to reduce the maximum available water determination that may be made for supplementary water access licences for any water year.
(6)  Once no extractions by supplementary water access licences are allowed as a result of subclause (5) then the maximum sum of available water determinations in any water year that may be made for regulated river (general security) access licences, is to be reduced.

Note.

 Subclauses (5) and (6) do not relate to supplementary water (Lowbidgee) access licences as extraction under these licences is accounted for as Lowbidgee extractions. Compliance with average annual extraction limit for Lowbidgee extractions are dealt with in clauses 34A–34C.
(7)  If action has been taken under subclause (2) or (3) and a subsequent assessment under clause 33 indicates that the current level of long-term average annual Murrumbidgee extractions is below the long-term average annual extraction limit established in clause 32 by more than 3%, then previous reductions under subclause (2) or (3) may be reversed to the degree that it is assessed necessary to return long-term average annual Murrumbidgee extractions to the long-term average annual extraction limit.
(8)  Any reversal of previous reductions under subclause (7) shall:
(a) be applied to higher priority categories of licence as set out in section 58 of the Act, first, and
(b)  not exceed the previous reductions made under subclause (2).
(9)  The assessment of the degree of reduction required under subclause (2) or (3) or degree of reversal under subclause (7) shall be made using the same computer model used to carry out assessments under clause 33.

34A   Calculation of the long-term average annual extraction limit and current levels of annual Lowbidgee extractions

(1)  After each water year following the water year in which Part 2 of Chapter 3 of the Act commenced in the area marked as Lowbidgee on the Plan Map, the long-term average annual extraction limit as defined in clause 32A may be reassessed to incorporate new information.
(2)  The total volume of water taken during that water year by Lowbidgee extractions must be calculated.
(3)  The long-term average annual extraction limit and current levels of long-term average annual extraction will be calculated after each water year following the water year in which Part 2 of Chapter 3 of the Act commenced in the area marked as Lowbidgee on the Plan Map using the hydrologic computer model that, at the time, is approved by the Minister for assessing long-term extraction from this water source.
(4)  The calculation of the long-term average annual extraction limit, as defined in clause 32A, and current levels of long-term average annual extraction will comprise all Lowbidgee extractions.

Note.

 The reassessment of the long-term average annual extraction limit in subclause (1) assists in meeting the Plan objective of adaptive management of this water source.

34B   Assessment of average annual extraction against the long-term annual extraction limit for Lowbidgee extractions

(1)  Assessment of the long-term average annual extraction limit established in clause 32A and the current level of long-term average annual Lowbidgee extraction shall be carried out by the Minister after the end of each water year following the water year in which Part 2 of Chapter 3 of the Act commenced in the area marked as Lowbidgee on the Plan Map, using the hydrologic computer model that, at the time, is approved by the Minister for assessing expected long-term Lowbidgee extractions.
(2)  To assess the long-term average annual extraction limit established in clause 32A, the model referred to in subclause (1) shall be set to represent as closely as possible the development and management conditions referred to in clause 32A (2).
(3)  To assess the current level of long-term average annual Lowbidgee extraction, the model referred to in subclause (1) shall be set to represent as closely as possible all water use development, supply system management and other factors affecting the quantity of long-term average annual Lowbidgee extractions at the time of assessment.

34C   Compliance with the long-term average annual extraction limit for Lowbidgee extractions

(1)  Compliance with the long-term average annual extraction limit for Lowbidgee extractions established for this water source is to be managed in accordance with this clause.
(2)  At the commencement of each water year after the water year in which Part 2 of Chapter 3 of the Act commenced in the area marked as Lowbidgee on the Plan Map, if in the Minister’s opinion the assessment under clause 34B demonstrates that current modelled long-term average annual Lowbidgee extractions have exceeded the long-term average annual extraction limit as defined in clause 32A by 3% or more, then the available water determination for supplementary water (Lowbidgee) access licences will be reduced for the following water year in accordance with subclause (3).
(3)  The reduction under subclause (2) is to be of an amount that, in the Minister’s opinion, is necessary to return long-term average annual Lowbidgee extractions in the water source to the long-term average annual extraction limit established in clause 32A.

Division 2 Available water determinations

35   Available water determinations

(1)  This Division is made in accordance with section 20 (2) (b) of the Act.
(2)  All available water determinations in this water source shall be expressed as either:
(a)  a percentage of the share component for all access licences where share components are specified as megalitres per year, or
(b)  megalitres per unit share for all regulated river (high security) access licences, regulated river (general security) access licences, Murrumbidgee Irrigation (conveyance) access licences, Coleambally Irrigation (conveyance) access licences, supplementary water access licences and supplementary water (Lowbidgee) access licences.
(3) In making available water determinations under section 59 of the Act for access licences with share components that specify this water source, the Minister should consider the requirements of this Division.

36   Available water determinations for domestic and stock access licences

(1)  The water supply system shall be managed so that available water determinations for domestic and stock access licences of 100% of share components can be maintained through a repeat of the worst period of low inflows to this water source represented in flow information held by the Department.
(2)  Sufficient volumes of water must be set aside from assured inflows into this water source and in reserves held in Burrinjuck Dam water storage, Blowering Dam water storage or other water storage to provide for subclause (1).
(3)  The available water determination for domestic and stock access licences made for the commencement of each water year shall provide an allocation of 100% of share components whenever possible.
(4)  The sum of available water determinations made for domestic and stock access licences in any water year shall not exceed 100% of share components.
(5)  This Plan recognises that the water requirement of domestic and stock access licences may increase during the term of this Plan in accordance with clause 30.
(6)  The volumes of water set aside from assured inflows into this water source and in reserves held in Burrinjuck Dam water storage, Blowering Dam water storage or other water storage shall be adjusted as required over the course of this Plan if necessary to do so, to ensure subclause (1) is satisfied.

37   Available water determinations for local water utility access licences

(1)  The water supply system shall be managed so that available water determinations for local water utility access licences of 100% of share components can be maintained through a repeat of the worst period of low inflows to this water source represented in flow information held by the Department.
(2)  Sufficient volumes of water must be set aside from assured inflows into this water source and in reserves held in Burrinjuck Dam water storage, Blowering Dam water storage or other water storage to provide for subclause (1).
(3)  The available water determination for local water utility access licences made for the commencement of each water year shall provide an allocation of 100% of share components whenever possible.
(4)  The sum of available water determinations made for local water utility access licences in any water year shall not exceed 100% of share components.
(5)  This Plan recognises that the water requirement of local water utility access licences may increase during the term of this Plan in accordance with clause 30.
(6)  The volumes of water set aside from assured inflows into this water source and in reserves held in Burrinjuck Dam water storage, Blowering Dam water storage or other water storage shall be adjusted as required over the course of this Plan if necessary to do so, to ensure subclause (1) is satisfied.

38   Available water determinations for regulated river (high security) access licences

(1)  The water supply system shall be managed so that available water determinations for regulated river (high security) access licences of 0.95 megalitres per unit share can be maintained through a repeat of the worst period of low inflows to this water source represented in flow information held by the Department.
(2)  Sufficient volumes of water must be set aside from assured inflows into this water source and in reserves held in Burrinjuck Dam water storage, Blowering Dam water storage or other water storage to provide for subclause (1).
(3)  The available water determination for regulated river (high security) access licences made for the commencement of each year shall, whenever possible be the greater of:
(a)  0.95 megalitres per unit share,
(b)  0.01 megalitres per unit share more than the sum of available water determinations for regulated river (general security) access licences when the sum of available water determinations for regulated river (general security) access licences is less than 1 megalitre per unit share, or
(c)  1 megalitre per unit share when the sum of available water determinations for regulated river (general security) access licences is 1 megalitre per unit share.
(4)  If the sum of available water determinations made under subclause (3) is less than 1 megalitre per unit share, then further available water determinations for regulated river (high security) access licences shall be made at least monthly, if water can be provided to them.
(5)  The available water determinations made under subclause (4) shall provide whenever possible additional water allocations such that the sum of available water determinations for regulated river (high security) access licences for the water year is the greater of:
(a)  0.95 megalitres per unit share,
(b)  0.01 megalitres per unit share more than the sum of available water determinations for regulated river (general security) access licences when the sum of available water determinations for regulated river (general security) access licences is less than 1 megalitre per unit share, or
(c)  1 megalitre per unit share when the sum of available water determinations for regulated river (general security) access licences is 1 megalitre per unit share.
(6)  The sum of available water determinations made for regulated river (high security) access licences in any water year shall not exceed 1 megalitre per unit share.
(7)  Available water determinations made for regulated river (high security) access licences must take into account:
(a)  the environmental water provisions established by this Plan,
(b)  requirements for domestic and stock and native title rights,
(c)  requirements for domestic and stock access licences,
(d)  requirements for local water utility access licences,
(e)  volumes remaining in water accounts from previous available water determinations,
(f)  water losses associated with holding and delivery of water to meet the requirements specified in subclauses (a) to (e),
(g)  an appropriate volume to meet water losses associated with the holding and delivery of water resulting from the available water determination, and
(h)  any other relevant matters.

39   Available water determinations for regulated river (general security) access licences

(1)  An available water determination is not to be made for regulated river (general security) access licences in any water year until the sum of available water determinations for regulated river (high security) access licences for the water year is equivalent to 0.95 megalitres per unit share.
(2)  An available water determination for regulated river (general security) access licences shall be made at the commencement of each water year if water can be provided to them.
(3)  If the available water determination resulting from subclause (2) is less than the percentage specified in subclause (4) then further available water determinations shall be made at least monthly if additional water can be provided.
(4)  The sum of available water determinations for regulated river (general security) access licences in any water year shall not exceed 1 megalitre per unit share, or such lower amount as results from clause 34 (2), (3) or (4).
(5)  Available water determinations made for regulated river (general security) access licences must take into account any relevant operational requirements identified in Part 12 of this Plan and:
(a)  the environmental water provisions established by this Plan,
(b)  requirements for domestic and stock and native title rights,
(c)  requirements for domestic and stock access licences,
(d)  requirements for local water utility access licences,
(e)  requirements for regulated river (high security) access licences,
(f)  requirements for Murrumbidgee Irrigation (conveyance) access licences,
(g)  requirements for Coleambally Irrigation (conveyance) access licences,
(h)  allocations remaining in water accounts from previous available water determinations,
(i)  water losses associated with holding and delivery of water to meet the requirements specified in subclauses (a) to (h),
(j)  an appropriate volume to meet water losses associated with the holding and delivery of water resulting from the available water determination, and
(k)  any other relevant matters.
(6)  Whenever the effective available water for regulated river (general security) access licences for that water year is less than or equal to 0.7 megalitres per unit share, available water determinations made for regulated river (general security) access licences shall also indicate that:
(a)  water may be extracted without debit to regulated river (general security) access licence water allocation accounts whenever access to water by supplementary water access licences is permitted under clause 51,
(b)  the total amount of water that may be extracted without debit to the water allocation account under subclause (6) (a) in any water year is limited to the equivalent of 0.85 megalitres per unit share minus the effective available water for that year, and
(c)  if at any time during the water year:
(i)  the effective available water for regulated river (general security) access licences for that water year is less than 0.85 megalitres per unit share, and
(ii)  the effective available water for regulated river (general security) access licences for that water year and the total volume of extractions taken under subclause (6) (b) exceed 0.85 megalitres per unit share,
then a volume of water that is equal to the volume of exceedance minus the volume of any previous debits made under this subclause shall be withdrawn from the regulated river (general security) access licence water allocation account, and
(d)  if at any time during the water year the effective available water for regulated river (general security) access licences for that water year increases to greater than 0.85 megalitres per unit share, then a volume of water equal to the volume that has been taken pursuant to subclause (6) (b) less the volume of any previous debits made under this subclause or subclause (6) (c) shall be withdrawn from the regulated river (general security) access licence water allocation account.
(7) The Minister may under section 45 (1) (b) of the Act and by notice published in the Gazette vary the provisions of subclause (6) following an amendment to the maximum carryover percentages specified in clauses 48 (2) (a) and 48 (3), to maintain the frequency of access to water under subclause (6) that existed prior to the variation.

40   Available water determinations for Murrumbidgee Irrigation (conveyance) access licences

Available water determinations for Murrumbidgee Irrigation (conveyance) access licences shall be made at the commencement of each water year and as required, during the water year, to provide a total volume of water for those access licences that is equal to:
(a)  98,000 megalitres, of which 80,000 megalitres is available for delivery prior to the end of February in any water year, and
(b)  243,000 megalitres when the sum of available water determinations made for regulated river (general security) access licences in that water year is greater than 0.60 megalitres per unit share, and
(c)  a further 550 megalitres per 0.01 megalitres per unit share of available water determinations made for regulated river (high security) access licences in that water year, when the sum of available water determinations for regulated river (high security) access licences for the water year is less than or equal to 0.95 megalitres per unit share, and
(d)  a further 550 megalitres per 0.01 megalitres per unit share of total available water determinations made for regulated river (general security) access licences in that water year when the sum of available water determinations for regulated river (general security) access licences for the water year is less than or equal to 0.2 megalitres per unit share, and
(e)  a further 1,650 megalitres per 0.01 megalitres per unit share of total available water determinations made for regulated river (general security) access licences in that water year when the sum of available water determinations for regulated river (general security) access licences for the water year is greater than 0.2 megalitres per unit share but less than or equal to 0.5 megalitres per unit share, and
(f)  a further 3,200 megalitres per 0.01 megalitres per unit share of total available water determinations made for regulated river (general security) access licences in that water year when the sum of available water determinations for regulated river (general security) access licences for the water year is greater than 0.5 megalitres per unit share but less than or equal to 0.6 megalitres per unit share,
provided that the sum of available water determinations made for Murrumbidgee Irrigation (conveyance) access licences in any water year must not exceed a volume equivalent to 1.0 megalitre per unit share of Murrumbidgee Irrigation (conveyance) access licence.

Note.

 The effect of clause 40 is that incremental available water determinations may be made over the course of a water year for Murrumbidgee Irrigation (conveyance) access licences depending on the amount of water available and the available water determinations made for other access licences, subject to a limit that is equal to a volume equivalent to 1.0 megalitre per unit share of Murrumbidgee Irrigation (conveyance) access licence.

41   Available water determinations for Coleambally Irrigation (conveyance) access licences

(1)  Available water determinations for Coleambally Irrigation (conveyance) access licence shall be made for the commencement of each water year and as required, during the water year, to provide a total volume of water to licences in this category during the water year that is equal to:
(a)  111,600 megalitres when the sum of available water determinations for regulated river (general security) access for the water year is less than or equal to 0.35 megalitres per unit share,
(b)  111,600 megalitres plus 760 megalitres for each 0.01 megalitre per unit share of available water determinations made for regulated river (general security) access licences in the water year when the sum of available water determinations for regulated river (general security) access licences for the water year is greater than 0.35 megalitres per unit share but less than 0.4 megalitres per unit share,
(c)  115,400 megalitres plus 243.3 megalitres for each 0.01 megalitre per unit share of available water determinations made for regulated river (general security) access licences in the water year when the sum of available water determinations for regulated river (general security) access licences for the water year is greater than 0.4 megalitres per unit share but less than 1 megalitre per unit share, or
(d)  130,000 megalitres when the sum of available water determinations for regulated river (general security) access licences for the water year is equal to 1 megalitre per unit share.
(2) The Minister may under section 45 (1) (b) of the Act and by notice published in the Gazette vary the provisions of subclause (1) (a), (1) (b) and (1) (c) if the Minister considers it is necessary to do so to reflect the actual losses experienced by Coleambally Irrigation.

42   Available water determinations for supplementary water access licences

(1)  In making available water determinations for supplementary water access licences, the Minister should consider the rules in this clause.
(2)  At the commencement of each water year, an available water determination of 1 ML per unit of share component or such lower amount that results from clause 34 (2), (3) or (4), should be made for supplementary water access licences with a share component that specifies this water source.

Note.

 Clause 34 provides for available water determinations for supplementary water access licences to be reduced where the long-term average annual extraction limit for Murrumbidgee extractions has been assessed to have been exceeded, as per clause 34.

42A   Available water determinations for supplementary water (Lowbidgee) access licences

(1)  In making available water determinations for supplementary water (Lowbidgee) access licences, the Minister should consider the rules in this clause.
(2)  At the commencement of each water year, an available water determination of 1 ML per unit of share component or such lower amount that results from clause 34C, should be made for supplementary water (Lowbidgee) access licences with a share component that specifies this water source.

Note.

 Clause 34C provides for available water determinations for supplementary water (Lowbidgee) access licences to be reduced where the long-term average annual extraction limit for Lowbidgee extractions has been assessed to have been exceeded, as per clauses 34A–34C.

Part 9 Rules for managing access licences and water supply works

43   Rules for managing access licences and water supply works

This Part is made in accordance with sections 20 (2) (b), 20 (2) (e), 21 (a) and 21 (c) of the Act having regard to:
(a)  the environmental water rules established in Part 3 of this Plan,
(b)  requirements for water to satisfy basic landholder rights identified in Part 4 of this Plan, and
(c)  requirements for water for extraction under access licences in Part 6 of this Plan.

Division 1 Water allocation account management

44   Water allocation accounts

In accordance with section 85 of the Act, a water allocation account shall be established for each access licence in this water source.

45   Accrual of water allocations

(1)  Water allocations will be accrued into water allocation accounts in accordance with the available water determinations made for the access licence category.
(2)  The sum of water allocations credited to a regulated river (general security) access licences account from available water determinations in a water year plus the volume of water carried over from the previous year under clause 48 (2) (a) shall not exceed a volume equal to 1 megalitre multiplied by the number of unit shares specified in the share component.

46   Volume taken under access licences

Note.

Section 341 of the Act makes it unlawful to take a volume of water under an access licence that exceeds the volume of water allocation which at the time of water extraction is credited to the access licence.
(1)  The water allocation taken under a domestic and stock access licence, local water utility access licence, regulated river (high security) access licence, regulated river (general security) access licence, Murrumbidgee Irrigation (conveyance) access licence and Coleambally Irrigation (conveyance) access licence will be assessed as:
(a)  the volume of water extracted by the approved works nominated by the access licence, or
(b)  the greater of:
(i)  the volume of water extracted by the approved works nominated by the access licence, or
(ii)  the volume of water ordered for extraction by the approved works nominated by the access licence,
where the Minister has applied such a discretionary condition to the access licence.
(2) The Minister should only apply a discretionary condition in relation to subclause (1) (b) where this has been provided for in an approved compliance management strategy.

Note.

 It is intended that the discretionary condition referred to above should only be applied where water orders have been exceeding the volume of water being taken under an access licence and this cannot be explained by rainfall or other unavoidable factors.
(3)  The water allocation taken from the water allocation accounts of supplementary water access licences and supplementary water (Lowbidgee) access licences will be the volume of water extracted in accordance with announcements and access licence conditions by the approved works nominated by the access licences.

47   Accounting of assigned water allocations and return flows

(1)  Water allocations assigned from a water allocation account under Part 2 Division 4 of the Act will be debited from that water allocation account and water allocations assigned to a water allocation account under Part 2 Division 4 of the Act will be credited to that water allocation account.
(2) Water allocations may also be re-credited to access licence water allocation accounts under section 76 of the Act, in accordance with water return flow rules established under section 75 of the Act.

48   Account forfeits/limits/carryover

(1)  Water allocations remaining in the water allocation accounts of domestic and stock access licences, local water utility access licences, regulated river (high security) access licences, supplementary water access licences and supplementary water (Lowbidgee) access licences cannot be carried over from one water year to the next.
(2)  The following rules shall apply to the management of water allocations in the water allocation accounts of regulated river (general security) access licences:
(a)  the maximum volume of water allocation that may be carried over in the water allocation account from one water year to the next shall be equal to 0.3 megalitres multiplied by the number of unit shares specified in the share component,
(b)  the maximum volume that may be credited to an account in any water year from available water determinations shall be equivalent to the maximum sum of available water determinations permitted under clause 39 (4) multiplied by the number of unit shares specified in the share component, minus the volume of water that was carried over in the account from the previous water year, and
(c)  when the sum of available water determinations to regulated river (general security) access licenses is equivalent to or less than 0.7 megalitres per unit share, and access to water by supplementary water access licences is permitted under clause 51 then water extracted by regulated river (general security) access licences will not be debited against their water allocation account in accordance with clause 39 (6).
(3)  The following rules shall apply to the management of water allocations in the water allocation accounts of Murrumbidgee Irrigation (conveyance) access licences and Coleambally Irrigation (conveyance) access licences:
(a)  the maximum volume of water allocation that may be carried over in the water allocation account from one water year to the next shall be equal to 0.3 megalitres multiplied by the number of unit shares specified in the share component, and
(b)  the maximum volume that may be credited to an account in any water year from available water determinations shall be the maximum total volume of available water determination permitted under clause 40, in relation to Murrumbidgee Irrigation (conveyance) access licences and clause 41, in relation to Coleambally Irrigation (conveyance) access licences, minus the volume of water that was carried over in the account from the previous water year.
(4) The Minister may, under section 45 (1) (b) of the Act and by notice published in the Gazette, increase the maximum carryover percentage specified in subclause (2) (a) and (3) up to a maximum of 0.5 megalitres per unit share and or apply different maximum carryover figures for regulated river (general security) access licence water accounts based on different zones within this water source, following the completion of a review of the possible impact associated with such changes.
(5)  The review under subclause (4) should be undertaken within the first three years of this Plan.

Division 2 Extraction conditions

49   General priority of extractions

Where extraction components of an access licence do not specify the rate as a share of supply capacity or a volume per unit of time, then whenever supply capability is insufficient to satisfy all orders for water in any section of this water source at any time then:
(a)  water will be supplied to domestic and stock access licences, local water utility access licences and regulated river (high security) access licences that have placed orders for water, and
(b)  then any remaining supply capability will be shared between regulated river (general security) access licences that have placed an order for water, in proportion to the share components specified on the access licence.

50   Numerical specification of extraction components

(1)  At any time during the term of this Plan, the Minister may, in accordance with the mandatory conditions on licences, amend the extraction components of access licences in this water source, or in any section of this water source.
(2)  Action under subclause (1) should be undertaken as follows:
(a)  the specified rate in the extraction component of each access licence should be a volume per unit of time or a share of supply capability,
(b)  the specified rate in the extraction component of each domestic and stock, local water utility and regulated river (high security) access licence should be sufficient to satisfy the maximum daily water needs, and
(c)  after satisfying subclause (2) (b) the remaining supply capability should be distributed among regulated river (general security) access licences in proportion to the share component of each access licence.
(3)  When action under subclause (1) is undertaken the Minister may also, in accordance with mandatory conditions on access licences, amend the extraction components of access licences in other sections of this water source to re-specify their extraction components to exclude extractions in sections of this water source affected by action under subclause (1).

51   Extraction of water under supplementary water access licences and supplementary water (Lowbidgee) access licences

(1)  The taking of water under supplementary water access licences and supplementary water (Lowbidgee) access licences should only be permitted in accordance with announcements made by the Minister.

Note.

Supplementary water may only be taken in accordance with an order in force under section 70 of the Act that authorises the taking of water pursuant to supplementary water access licences. It is an offence under section 60A of the Water Management Act 2000 for a person to take supplementary water otherwise than in accordance with the terms of an order in force under section 70.
(2)  The maximum volume that may be taken under supplementary water access licences during each period of time to which an announcement applies may be expressed as a number of megalitres per unit share.

Note.

 At the gazettal of this Plan, this was not the practice for the Murrumbidgee Regulated River Water Source but may need to occur at some stage during the term of this Plan.

Schedule 3 Goodradigbee flow classification table

The following table indicates the average daily flows in the Goodradigbee River at Wee Jasper, which are to be used for the purpose of classifying the catchment condition for Burrinjuck Dam water storage.
Column 1
Column 2
Column 3
Date
Upper limit of “dry conditions” flows—ML/day
Upper limit of “normal conditions” flows—ML/day
22-Apr
131
486
23-Apr
127
399
24-Apr
129
368
25-Apr
131
349
26-Apr
137
354
27-Apr
137
339
28-Apr
143
321
29-Apr
147
339
30-Apr
159
382
01-May
152
348
02-May
156
365
03-May
154
613
04-May
158
458
05-May
154
407
06-May
151
364
07-May
171
398
08-May
157
340
09-May
152
304
10-May
165
343
11-May
184
437
12-May
183
376
13-May
178
671
14-May
175
787
15-May
166
507
16-May
177
483
17-May
182
521
18-May
201
636
19-May
208
774
20-May
204
572
21-May
194
473
22-May
200
452
23-May
222
531
24-May
228
870
25-May
243
743
26-May
244
670
27-May
306
737
28-May
301
834
29-May
252
683
30-May
246
1058
31-May
314
1294
01-Jun
270
951
02-Jun
271
799
03-Jun
320
917
04-Jun
277
776
05-Jun
297
851
06-Jun
268
845
07-Jun
251
916
08-Jun
276
843
09-Jun
272
756
10-Jun
294
936
11-Jun
324
1376
12-Jun
426
1338
13-Jun
378
1070
14-Jun
338
831
15-Jun
318
772
16-Jun
311
745
17-Jun
317
804
18-Jun
315
1054
19-Jun
328
1230
20-Jun
381
987
21-Jun
358
977
22-Jun
354
1009
23-Jun
337
1036
24-Jun
361
917
25-Jun
398
1171
26-Jun
381
1354
27-Jun
375
1655
28-Jun
399
1217
29-Jun
441
1319
30-Jun
460
1593
01-Jul
422
1502
02-Jul
459
1603
03-Jul
478
1769
04-Jul
522
1982
05-Jul
502
2205
06-Jul
610
3464
07-Jul
622
2660
08-Jul
576
2453
09-Jul
554
1887
10-Jul
606
1703
11-Jul
568
1716
12-Jul
574
1699
13-Jul
521
1510
14-Jul
495
1667
15-Jul
505
1422
16-Jul
547
1415
17-Jul
599
1770
18-Jul
528
2043
19-Jul
509
2001
20-Jul
480
1604
21-Jul
499
1822
22-Jul
483
2565
23-Jul
553
2470
24-Jul
493
2883
25-Jul
596
2955
26-Jul
646
3208
27-Jul
681
2280
28-Jul
866
2118
29-Jul
883
2418
30-Jul
961
2143
31-Jul
883
2074
01-Aug
804
1871
02-Aug
766
1611
03-Aug
769
1616
04-Aug
689
1642
05-Aug
695
1662
06-Aug
927
2527
07-Aug
899
2444
08-Aug
867
2200
09-Aug
803
2067
10-Aug
792
1900
11-Aug
824
1737
12-Aug
859
1747
13-Aug
855
1951
14-Aug
836
1958
15-Aug
854
2241
16-Aug
945
2427
17-Aug
896
2206
18-Aug
932
2127
19-Aug
881
2056
20-Aug
878
1997
21-Aug
869
2675
22-Aug
835
2656
23-Aug
828
2685
24-Aug
851
2361
25-Aug
865
2229
26-Aug
899
2432
27-Aug
862
2992
28-Aug
877
2421
29-Aug
849
2203
30-Aug
907
2151
31-Aug
909
2394
01-Sep
1006
2448
02-Sep
1057
2324
03-Sep
1134
2321
04-Sep
1188
2161
05-Sep
1154
2247
06-Sep
1061
2067
07-Sep
1050
1933
08-Sep
1027
2215
09-Sep
1024
2352
10-Sep
1078
2206
11-Sep
1134
2188
12-Sep
1161
2325
13-Sep
1167
2215
14-Sep
1145
2274
15-Sep
1059
2092
16-Sep
993
1971
17-Sep
1111
2126
18-Sep
1216
2670
19-Sep
1166
2551
20-Sep
1160
2186
21-Sep
1109
2101
22-Sep
983
2081
23-Sep
917
1995
24-Sep
857
1834
25-Sep
803
2110
26-Sep
791
1926
27-Sep
759
2128
28-Sep
806
1879
29-Sep
807
1896
30-Sep
806
1701
01-Oct
747
1483
02-Oct
741
1366
03-Oct
780
1713
04-Oct
714
3234
05-Oct
706
2499
06-Oct
687
1828
07-Oct
704
1614
08-Oct
689
1445
09-Oct
701
1592
10-Oct
655
1629
11-Oct
630
1502
12-Oct
626
1365
13-Oct
636
1262
14-Oct
627
1227
15-Oct
587
1273
16-Oct
584
1287
17-Oct
602
1241
18-Oct
601
1689
19-Oct
584
1714
20-Oct
573
1676
21-Oct
565
1501

Schedule 4 Burrinjuck Dam translucency percentage table

DATE
BURRINJUCK EFFECTIVE VOLUME < 30% FULL SUPPLY VOLUME OF BURRINJUCK
30% FULL SUPPLY VOLUME OF BURRINJUCK < BURRINJUCK EFFECTIVE VOLUME < 50% FULL SUPPLY VOLUME OF BURRINJUCK
BURRINJUCK EFFECTIVE VOLUME > 50% FULL SUPPLY VOLUME OF BURRINJUCK
WET
NORMAL
DRY
WET
NORMAL
DRY
WET
NORMAL
DRY
22-APR
0
1
0
0
1
0
0
1
0
23-APR
0
2
0
0
2
0
0
2
0
24-APR
0
3
0
0
3
0
0
3
0
25-APR
0
4
0
0
4
0
0
4
0
26-APR
0
5
0
0
5
0
0
5
0
27-APR
0
6
0
0
6
0
0
6
0
28-APR
0
7
0
0
7
0
0
7
0
29-APR
0
8
0
0
8
0
0
8
0
30-APR
0
9
0
0
9
0
0
9
0
01-MAY
0
10
0
0
10
0
0
10
0
02-MAY
5
11
0
5
11
0
5
11
0
03-MAY
12
12
0
12
12
0
12
12
0
04-MAY
18
13
0
18
13
0
18
13
0
05-MAY
25
14
0
25
14
0
25
14
0
06-MAY
31
15
0
31
15
0
31
15
0
07-MAY
37
16
0
37
16
0
37
16
0
08-MAY
43
17
0
43
17
0
43
17
0
09-MAY
48
18
0
48
18
0
48
18
0
10-MAY
50
20
0
54
20
0
54
20
0
11-MAY
50
21
0
59
21
0
59
21
0
12-MAY
50
22
0
65
22
0
65
22
0
13-MAY
50
23
0
70
23
0
70
23
0
14-MAY
50
24
0
74
24
0
74
24
0
15-MAY
50
25
0
79
25
0
79
25
0
16-MAY
50
26
2
83
26
2
83
26
2
17-MAY
50
27
3
88
27
3
88
27
3
18-MAY
50
28
4
91
28
4
91
28
4
19-MAY
50
29
5
95
29
5
95
29
5
20-MAY
50
30
6
99
30
6
99
30
6
21-MAY
50
31
7
100
31
7
100
31
7
22-MAY
50
32
8
100
32
8
100
32
8
23-MAY
50
34
9
100
34
9
100
34
9
24-MAY
50
35
10
100
35
10
100
35
10
25-MAY
50
36
11
100
36
11
100
36
11
26-MAY
50
37
12
100
37
12
100
37
12
27-MAY
50
38
13
100
38
13
100
38
13
28-MAY
50
39
14
100
39
14
100
39
14
29-MAY
50
40
15
100
40
15
100
40
15
30-MAY
50
41
16
100
41
16
100
41
16
31-MAY
50
42
17
100
42
17
100
42
17
01-JUN
50
43
18
100
43
18
100
43
18
02-JUN
50
44
19
100
44
19
100
44
19
03-JUN
50
45
20
100
45
20
100
45
20
04-JUN
50
46
21
100
46
21
100
46
21
05-JUN
50
47
22
100
47
22
100
47
22
06-JUN
50
48
23
100
48
23
100
48
23
07-JUN
50
49
24
100
49
24
100
49
24
08-JUN
50
50
25
100
50
25
100
50
25
09-JUN
50
50
26
100
50
26
100
51
26
10-JUN
50
50
26
100
50
26
100
52
26
11-JUN
50
50
27
100
50
27
100
53
27
12-JUN
50
50
28
100
50
28
100
54
28
13-JUN
50
50
29
97
50
29
97
55
29
14-JUN
50
50
30
93
50
30
93
56
30
15-JUN
50
50
31
89
50
31
89
57
31
16-JUN
50
50
31
84
50
31
84
58
31
17-JUN
50
50
32
78
50
32
78
59
32
18-JUN
50
50
33
72
50
33
72
60
33
19-JUN
50
50
34
66
50
34
66
61
34
20-JUN
50
50
34
59
50
34
59
62
34
21-JUN
50
50
35
52
50
35
52
63
35
22-JUN
45
50
36
45
50
36
45
64
36
23-JUN
37
50
37
37
50
37
37
64
37
24-JUN
29
50
37
29
50
37
29
65
37
25-JUN
20
50
38
20
50
38
20
66
38
26-JUN
11
50
39
11
50
39
11
67
39
27-JUN
1
50
39
1
50
39
1
68
39
28-JUN
0
50
40
0
50
40
0
69
40
29-JUN
0
50
40
0
50
40
0
69
40
30-JUN
0
50
41
0
50
41
0
70
41
01-JUL
0
50
41
0
50
41
0
71
41
02-JUL
0
50
42
0
50
42
0
72
42
03-JUL
0
50
42
0
50
42
0
72
42
04-JUL
0
50
43
0
50
43
0
73
43
05-JUL
0
50
43
0
50
43
0
74
43
06-JUL
0
50
44
0
50
44
0
75
44
07-JUL
0
50
44
0
50
44
0
75
44
08-JUL
0
50
45
0
50
45
0
76
45
09-JUL
0
50
45
0
50
45
0
77
45
10-JUL
0
50
45
0
50
45
0
77
45
11-JUL
0
50
46
0
50
46
0
78
46
12-JUL
0
50
46
0
50
46
0
79
46
13-JUL
0
50
46
0
50
46
0
79
46
14-JUL
0
50
46
0
50
46
0
80
46
15-JUL
0
50
47
0
50
47
0
80
47
16-JUL
0
50
47
0
50
47
0
81
47
17-JUL
0
50
47
0
50
47
0
81
47
18-JUL
0
50
47
0
50
47
0
82
47
19-JUL
0
50
47
0
50
47
0
82
47
20-JUL
0
50
47
0
50
47
0
83
47
21-JUL
0
50
47
0
50
47
0
83
47
22-JUL
0
50
47
0
50
47
0
84
47
23-JUL
0
50
47
0
50
47
0
84
47
24-JUL
0
50
47
0
50
47
0
84
47
25-JUL
0
50
47
0
50
47
0
85
47
26-JUL
0
50
47
0
50
47
0
85
47
27-JUL
0
50
47
0
50
47
0
86
47
28-JUL
0
50
46
0
50
46
0
86
46
29-JUL
0
50
46
0
50
46
0
86
46
30-JUL
0
50
46
0
50
46
0
86
46
31-JUL
0
50
46
0
50
46
0
87
46
01-AUG
0
50
45
0
50
45
0
87
45
02-AUG
0
50
45
0
50
45
0
87
45
03-AUG
0
50
45
0
50
45
0
87
45
04-AUG
0
50
44
0
50
44
0
87
44
05-AUG
0
50
44
0
50
44
0
87
44
06-AUG
0
50
43
0
50
43
0
88
43
07-AUG
0
50
43
0
50
43
0
88
43
08-AUG
0
50
42
0
50
42
0
88
42
09-AUG
0
50
41
0
50
41
0
88
41
10-AUG
0
50
41
0
50
41
0
88
41
11-AUG
0
50
40
0
50
40
0
88
40
12-AUG
0
50
39
0
50
39
0
88
39
13-AUG
0
50
39
0
50
39
0
88
39
14-AUG
0
50
38
0
50
38
0
87
38
15-AUG
0
50
37
0
50
37
0
87
37
16-AUG
0
50
36
0
50
36
0
87
36
17-AUG
0
50
35
0
50
35
0
87
35
18-AUG
0
50
34
0
50
34
0
87
34
19-AUG
0
50
33
0
50
33
0
86
33
20-AUG
0
50
32
0
50
32
0
86
32
21-AUG
0
50
31
0
50
31
0
86
31
22-AUG
0
50
30
0
50
30
0
86
30
23-AUG
0
50
29
0
50
29
0
85
29
24-AUG
0
50
28
0
50
28
0
85
28
25-AUG
0
50
26
0
50
26
0
84
26
26-AUG
0
50
25
0
50
25
0
84
25
27-AUG
0
50
24
0
50
24
0
84
24
28-AUG
0
50
22
0
50
22
0
83
22
29-AUG
0
50
21
0
50
21
0
82
21
30-AUG
0
50
19
0
50
19
0
82
19
31-AUG
0
50
18
0
50
18
0
81
18
01-SEP
0
50
16
0
50
16
0
81
16
02-SEP
0
50
15
0
50
15
0
80
15
03-SEP
0
50
13
0
50
13
0
79
13
04-SEP
0
50
11
0
50
11
0
79
11
05-SEP
0
50
9
0
50
9
0
78
9
06-SEP
0
50
8
0
50
8
0
77
8
07-SEP
0
50
6
0
50
6
0
76
6
08-SEP
0
50
4
0
50
4
0
75
4
09-SEP
0
50
2
0
50
2
0
74
2
10-SEP
0
50
0
0
50
0
0
73
0
11-SEP
0
50
0
0
50
0
0
72
0
12-SEP
0
50
0
0
50
0
0
71
0
13-SEP
0
50
0
0
50
0
0
70
0
14-SEP
0
50
0
0
50
0
0
69
0
15-SEP
0
50
0
0
50
0
0
68
0
16-SEP
0
50
0
0
50
0
0
67
0
17-SEP
0
50
0
0
50
0
0
66
0
18-SEP
0
50
0
0
50
0
0
65
0
19-SEP
0
50
0
0
50
0
0
63
0
20-SEP
0
50
0
0
50
0
0
62
0
21-SEP
0
50
0
0
50
0
0
61
0
22-SEP
0
50
0
0
50
0
0
59
0
23-SEP
0
50
0
0
50
0
0
58
0
24-SEP
0
50
0
0
50
0
0
57
0
25-SEP
0
50
0
0
50
0
0
55
0
26-SEP
0
50
0
0
50
0
0
54
0
27-SEP
0
50
0
0
50
0
0
52
0
28-SEP
0
50
0
0
50
0
0
50
0
29-SEP
0
49
0
0
49
0
0
49
0
30-SEP
0
47
0
0
47
0
0
47
0
01-OCT
0
45
0
0
45
0
0
45
0
02-OCT
0
44
0
0
44
0
0
44
0
03-OCT
0
42
0
0
42
0
0
42
0
04-OCT
0
40
0
0
40
0
0
40
0
05-OCT
0
38
0
0
38
0
0
38
0
06-OCT
0
36
0
0
36
0
0
36
0
07-OCT
0
34
0
0
34
0
0
34
0
08-OCT
0
32
0
0
32
0
0
32
0
09-OCT
0
30
0
0
30
0
0
30
0
10-OCT
0
28
0
0
28
0
0
28
0
11-OCT
0
26
0
0
26
0
0
26
0
12-OCT
0
24
0
0
24
0
0
24
0
13-OCT
0
21
0
0
21
0
0
21
0
14-OCT
0
19
0
0
19
0
0
19
0
15-OCT
0
17
0
0
17
0
0
17
0
16-OCT
0
14
0
0
14
0
0
14
0
17-OCT
0
12
0
0
12
0
0
12
0
18-OCT
0
9
0
0
9
0
0
9
0
19-OCT
0
7
0
0
7
0
0
7
0
20-OCT
0
4
0
0
4
0
0
4
0
21-OCT
0
2
0
0
2
0
0
2
0

Schedule 5 Initial “unclipped” translucency percentage table

DATE
BURRINJUCK EFFECTIVE VOLUME < 30% FULL SUPPLY VOLUME OF BURRINJUCK
30% FULL SUPPLY VOLUME OF BURRINJUCK < BURRINJUCK EFFECTIVE VOLUME < 50% FULL SUPPLY VOLUME OF BURRINJUCK
BURRINJUCK EFFECTIVE VOLUME > 50% FULL SUPPLY VOLUME OF BURRINJUCK
WET
NORMAL
DRY
WET
NORMAL
DRY
WET
NORMAL
DRY
22-APR
0
1
0
0
1
0
0
1
0
23-APR
0
2
0
0
2
0
0
2
0
24-APR
0
3
0
0
3
0
0
3
0
25-APR
0
4
0
0
4
0
0
4
0
26-APR
0
5
0
0
5
0
0
5
0
27-APR
0
6
0
0
6
0
0
6
0
28-APR
0
7
0
0
7
0
0
7
0
29-APR
0
8
0
0
8
0
0
8
0
30-APR
0
9
0
0
9
0
0
9
0
01-MAY
0
10
0
0
10
0
0
10
0
02-MAY
5
11
0
5
11
0
5
11
0
03-MAY
12
12
0
12
12
0
12
12
0
04-MAY
18
13
0
18
13
0
18
13
0
05-MAY
25
14
0
25
14
0
25
14
0
06-MAY
31
15
0
31
15
0
31
15
0
07-MAY
37
16
0
37
16
0
37
16
0
08-MAY
43
17
0
43
17
0
43
17
0
09-MAY
48
18
0
48
18
0
48
18
0
10-MAY
54
20
0
54
20
0
54
20
0
11-MAY
59
21
0
59
21
0
59
21
0
12-MAY
65
22
0
65
22
0
65
22
0
13-MAY
70
23
0
70
23
0
70
23
0
14-MAY
74
24
0
74
24
0
74
24
0
15-MAY
79
25
0
79
25
0
79
25
0
16-MAY
83
26
2
83
26
2
83
26
2
17-MAY
88
27
3
88
27
3
88
27
3
18-MAY
91
28
4
91
28
4
91
28
4
19-MAY
95
29
5
95
29
5
95
29
5
20-MAY
99
30
6
99
30
6
99
30
6
21-MAY
100
31
7
100
31
7
100
31
7
22-MAY
100
32
8
100
32
8
100
32
8
23-MAY
100
34
9
100
34
9
100
34
9
24-MAY
100
35
10
100
35
10
100
35
10
25-MAY
100
36
11
100
36
11
100
36
11
26-MAY
100
37
12
100
37
12
100
37
12
27-MAY
100
38
13
100
38
13
100
38
13
28-MAY
100
39
14
100
39
14
100
39
14
29-MAY
100
40
15
100
40
15
100
40
15
30-MAY
100
41
16
100
41
16
100
41
16
31-MAY
100
42
17
100
42
17
100
42
17
01-JUN
100
43
18
100
43
18
100
43
18
02-JUN
100
44
19
100
44
19
100
44
19
03-JUN
100
45
20
100
45
20
100
45
20
04-JUN
100
46
21
100
46
21
100
46
21
05-JUN
100
47
22
100
47
22
100
47
22
06-JUN
100
48
23
100
48
23
100
48
23
07-JUN
100
49
24
100
49
24
100
49
24
08-JUN
100
50
25
100
50
25
100
50
25
09-JUN
100
51
26
100
51
26
100
51
26
10-JUN
100
52
26
100
52
26
100
52
26
11-JUN
100
53
27
100
53
27
100
53
27
12-JUN
100
54
28
100
54
28
100
54
28
13-JUN
97
55
29
97
55
29
97
55
29
14-JUN
93
56
30
93
56
30
93
56
30
15-JUN
89
57
31
89
57
31
89
57
31
16-JUN
84
58
31
84
58
31
84
58
31
17-JUN
78
59
32
78
59
32
78
59
32
18-JUN
72
60
33
72
60
33
72
60
33
19-JUN
66
61
34
66
61
34
66
61
34
20-JUN
59
62
34
59
62
34
59
62
34
21-JUN
52
63
35
52
63
35
52
63
35
22-JUN
45
64
36
45
64
36
45
64
36
23-JUN
37
64
37
37
64
37
37
64
37
24-JUN
29
65
37
29
65
37
29
65
37
25-JUN
20
66
38
20
66
38
20
66
38
26-JUN
11
67
39
11
67
39
11
67
39
27-JUN
1
68
39
1
68
39
1
68
39
28-JUN
0
69
40
0
69
40
0
69
40
29-JUN
0
69
40
0
69
40
0
69
40
30-JUN
0
70
41
0
70
41
0
70
41
01-JUL
0
71
41
0
71
41
0
71
41
02-JUL
0
72
42
0
72
42
0
72
42
03-JUL
0
72
42
0
72
42
0
72
42
04-JUL
0
73
43
0
73
43
0
73
43
05-JUL
0
74
43
0
74
43
0
74
43
06-JUL
0
75
44
0
75
44
0
75
44
07-JUL
0
75
44
0
75
44
0
75
44
08-JUL
0
76
45
0
76
45
0
76
45
09-JUL
0
77
45
0
77
45
0
77
45
10-JUL
0
77
45
0
77
45
0
77
45
11-JUL
0
78
46
0
78
46
0
78
46
12-JUL
0
79
46
0
79
46
0
79
46
13-JUL
0
79
46
0
79
46
0
79
46
14-JUL
0
80
46
0
80
46
0
80
46
15-JUL
0
80
47
0
80
47
0
80
47
16-JUL
0
81
47
0
81
47
0
81
47
17-JUL
0
81
47
0
81
47
0
81
47
18-JUL
0
82
47
0
82
47
0
82
47
19-JUL
0
82
47
0
82
47
0
82
47
20-JUL
0
83
47
0
83
47
0
83
47
21-JUL
0
83
47
0
83
47
0
83
47
22-JUL
0
84
47
0
84
47
0
84
47
23-JUL
0
84
47
0
84
47
0
84
47
24-JUL
0
84
47
0
84
47
0
84
47
25-JUL
0
85
47
0
85
47
0
85
47
26-JUL
0
85
47
0
85
47
0
85
47
27-JUL
0
86
47
0
86
47
0
86
47
28-JUL
0
86
46
0
86
46
0
86
46
29-JUL
0
86
46
0
86
46
0
86
46
30-JUL
0
86
46
0
86
46
0
86
46
31-JUL
0
87
46
0
87
46
0
87
46
01-AUG
0
87
45
0
87
45
0
87
45
02-AUG
0
87
45
0
87
45
0
87
45
03-AUG
0
87
45
0
87
45
0
87
45
04-AUG
0
87
44
0
87
44
0
87
44
05-AUG
0
87
44
0
87
44
0
87
44
06-AUG
0
88
43
0
88
43
0
88
43
07-AUG
0
88
43
0
88
43
0
88
43
08-AUG
0
88
42
0
88
42
0
88
42
09-AUG
0
88
41
0
88
41
0
88
41
10-AUG
0
88
41
0
88
41
0
88
41
11-AUG
0
88
40
0
88
40
0
88
40
12-AUG
0
88
39
0
88
39
0
88
39
13-AUG
0
88
39
0
88
39
0
88
39
14-AUG
0
87
38
0
87
38
0
87
38
15-AUG
0
87
37
0
87
37
0
87
37
16-AUG
0
87
36
0
87
36
0
87
36
17-AUG
0
87
35
0
87
35
0
87
35
18-AUG
0
87
34
0
87
34
0
87
34
19-AUG
0
86
33
0
86
33
0
86
33
20-AUG
0
86
32
0
86
32
0
86
32
21-AUG
0
86
31
0
86
31
0
86
31
22-AUG
0
86
30
0
86
30
0
86
30
23-AUG
0
85
29
0
85
29
0
85
29
24-AUG
0
85
28
0
85
28
0
85
28
25-AUG
0
84
26
0
84
26
0
84
26
26-AUG
0
84
25
0
84
25
0
84
25
27-AUG
0
84
24
0
84
24
0
84
24
28-AUG
0
83
22
0
83
22
0
83
22
29-AUG
0
82
21
0
82
21
0
82
21
30-AUG
0
82
19
0
82
19
0
82
19
31-AUG
0
81
18
0
81
18
0
81
18
01-SEP
0
81
16
0
81
16
0
81
16
02-SEP
0
80
15
0
80
15
0
80
15
03-SEP
0
79
13
0
79
13
0
79
13
04-SEP
0
79
11
0
79
11
0
79
11
05-SEP
0
78
9
0
78
9
0
78
9
06-SEP
0
77
8
0
77
8
0
77
8
07-SEP
0
76
6
0
76
6
0
76
6
08-SEP
0
75
4
0
75
4
0
75
4
09-SEP
0
74
2
0
74
2
0
74
2
10-SEP
0
73
0
0
73
0
0
73
0
11-SEP
0
72
0
0
72
0
0
72
0
12-SEP
0
71
0
0
71
0
0
71
0
13-SEP
0
70
0
0
70
0
0
70
0
14-SEP
0
69
0
0
69
0
0
69
0
15-SEP
0
68
0
0
68
0
0
68
0
16-SEP
0
67
0
0
67
0
0
67
0
17-SEP
0
66
0
0
66
0
0
66
0
18-SEP
0
65
0
0
65
0
0
65
0
19-SEP
0
63
0
0
63
0
0
63
0
20-SEP
0
62
0
0
62
0
0
62
0
21-SEP
0
61
0
0
61
0
0
61
0
22-SEP
0
59
0
0
59
0
0
59
0
23-SEP
0
58
0
0
58
0
0
58
0
24-SEP
0
57
0
0
57
0
0
57
0
25-SEP
0
55
0
0
55
0
0
55
0
26-SEP
0
54
0
0
54
0
0
54
0
27-SEP
0
52
0
0
52
0
0
52
0
28-SEP
0
50
0
0
50
0
0
50
0
29-SEP
0
49
0
0
49
0
0
49
0
30-SEP
0
47
0
0
47
0
0
47
0
01-OCT
0
45
0
0
45
0
0
45
0
02-OCT
0
44
0
0
44
0
0
44
0
03-OCT
0
42
0
0
42
0
0
42
0
04-OCT
0
40
0
0
40
0
0
40
0
05-OCT
0
38
0
0
38
0
0
38
0
06-OCT
0
36
0
0
36
0
0
36
0
07-OCT
0
34
0
0
34
0
0
34
0
08-OCT
0
32
0
0
32
0
0
32
0
09-OCT
0
30
0
0
30
0
0
30
0
10-OCT
0
28
0
0
28
0
0
28
0
11-OCT
0
26
0
0
26
0
0
26
0
12-OCT
0
24
0
0
24
0
0
24
0
13-OCT
0
21
0
0
21
0
0
21
0
14-OCT
0
19
0
0
19
0
0
19
0
15-OCT
0
17
0
0
17
0
0
17
0
16-OCT
0
14
0
0
14
0
0
14
0
17-OCT
0
12
0
0
12
0
0
12
0
18-OCT
0
9
0
0
9
0
0
9
0
19-OCT
0
7
0
0
7
0
0
7
0
20-OCT
0
4
0
0
4
0
0
4
0
21-OCT
0
2
0
0
2
0
0
2
0

Appendix 1 Overview of the Plan Map

Appendix 2 Inspection of Plan Map

Copies of the Plan Map may be inspected at the following offices:

NSW Office of Water
Chelmsford Place
LEETON NSW 2705

Appendix 3 Rivers and lakes declared to be regulated rivers in the Murrumbidgee Regulated River Water Source

At the making of the Water Sharing Plan for the Murrumbidgee Regulated River Water Source Amendment Order 2012 the following rivers and lakes have been declared to be regulated rivers within the Murrumbidgee Regulated River Water Source:
(1)  Adelong Creek, that part which adjoins the generally northwestern boundary of portion 113 REM., Parish of Willie Ploma, County of Wynyard.
(2)  Back Creek from its confluence with unnamed watercourse within portion 73, Parish of Uroly, County of Boyd, to its confluence with Pine Watercourse and Washpen Creek within portion 72, Parish of Uroly, County of Boyd.
(3)  Beavers Creek.
(4)  Billabong Creek from its junction with Colombo Creek to its confluence with the Edward River.
(5)  Billabong Creek upstream from its confluence with Colombo Creek to the concrete dam situated between portion 63, Parish of Cocketgedong and portion 24, Parish of Nowranie both in the County of Urana.
(6)  Bombowlee Creek from its confluence with the Tumut River within Portion 199, parish of Killimicat, County of Buccleuch, to its intersection with the northern boundary of the road between the aforesaid portion and Portion 75, Parish of Mundongo, County of Buccleuch.
(7)  Bullenbong Creek from its junction with Old Man Creek to a point 305 metres upstream.
(8)  Bundidgerry Creek from western boundary of portion 67, Parish of Berrembed, County of Bourke, downstream to western boundary of portion 253, Parish of Narrandera, County of Cooper.
(9)  Colombo Creek from its offtake from Yanco Creek to its confluence with Billabong Creek.
(10)  Coonooncoocabil Lagoon, County of Cooper.
(11)  Cowabbie Creek from the western boundary of portion 224, Parish of Berrembed, County of Bourke, downstream to its confluence with Bundidgerry Creek.
(12)  Cuddell Creek form the intersection point of creek bank and the common boundary between portions 4 and 5, Parish of Cuddell, County of Mitchell, to its confluence with Yanco Creek.
(13)  Eringowarra Creek from its effluence with the Murrumbidgee River within portion 20, Parish of Bilda, County of Clarendon, downstream to a point 100 metres south of portion 18, within portion 34, parish of Bilda, County of Clarendon.
(14)  Forest Creek from its offtake from Billabong Creek within T.S.R. 30139, Parish of Thulabin, County of Townsend downstream to Warriston Weir.
(15)  Killimicat Creek from its juction with Nimbo Creek downstream to its junction with Brungle Creek.
(16)  Island Creek offtaking from the Murrumbidgee River between portions 138 and 139, Parish of Tenandra, County of Clarenden.
(17)  Island Lagoon in its entirety from its common effluence/confluence with the Murrumbidgee River, located within portion 209, Parish of Tooyal, County of Bourke.
(18)  Murrumbidgee River from Taemas Bridge with the storage of Burrinjuck Dam downstream to the Murray River.
(19)  Nimbo Creek.
(20)  Nowranie Creek upstream from its confluence with Billabong Creek to the concrete dam situated within portion 27, Parish of Nowranie, County of Urana.
(21)  Old Man Creek.
(22)  Sheepwash Creek form its confluence with Billabong Creek within portion 49, Parish of Wanganella, County of Townsend, upstream to its intersection with the eastern boundary of said portion, parish and county.
(23)  Tumut River from the upper limit of the storage of Blowering Dam downstream to the Murrumbidgee River.
(24)  Unnamed watercourse (known locally as “The Washaway”) offtaking from the Tumut River within portion 40, Parish of Blowering, County of Buccleuch.
(25)  Unnamed watercourse offtaking from the Murrumbidgee River within portion 21, Parish of Borambula, County of Wynyard, to its confluence with the Murrumbidgee River within portion 102, Parish of Borambula, County of Wynyard.
(26)  Unnamed watercourse offtaking from the Murrumbidgee River in portion 39, Parish of Mundarlo, County of Wynyard, downstream to its confluence with the Murrumbidgee River.
(27)  Unnamed watercourse offtaking from the Murrumbidgee River within portion 94, Parish of Uri, County of Boyd.
(28)  Unnamed watercourse offtaking at two points from the Murrumbidgee River within portion 136, Parish of Tenandra, County of Clarenden.
(29)  Unnamed watercourse formerly offtaking from a bend in the Murrumbidgee River within portion 13, Parish of Burt, County of Boyd and now cut off from a supply by construction of Gogeldrie Weir. Alternative supply is now obtained from diversion works constructed by the Crown in the form of a cutting and regulator offtaking from the pool of this weir in portion 8 of the said parish.
(30)  Unnamed lagoon and unnamed watercourse located within portions 38, 15 and C.R. 482, Parish of Bundidgerry, County of Cooper.
(31)  Unnamed watercourse connection an unnamed lagoon with Bundidgerry Creek within C.R. 482, Parish of Bundidgerry, County of Cooper.
(32)  Unnamed lagoon, form its upstream effluence to its downstream confluence with Colombo Creek both located adjacent to Morundah Racecourse all within Reserve 67478, Parish of Waugh, County of Urana.
(33)  Unnamed watercourse, from it confluence with Yanco Creek within portion 22, Parish of Moonbria, County of Townsend, to the earth dam located 158 metres upstream within portion 3, Parish of Moonbria, County of Townsend.
(34)  Unnamed watercourse offtaking from Yanco Creek within portion 159, Parish of Bundure, County of Urana, to its upper limits within portion 58, Parish of Douglas, County of Urana.
(35)  Unnamed watercourse from its offtake from an unnamed watercourse within portion 57, Parish of Douglas, County of Urana, and traversing portions 58, 61 and 156, Parish of Douglas, County of Urana.
(36)  Unnamed watercourse (artificially improved), from its confluence with Yanco Creek within WR 1630 adjacent to portion 73, Parish of Uroly, County of Boyd, to its confluence with Back Creek within said portion.
(37)  Unnamed watercourse from its offtake from Colombo Creek within Reserve 1631, east of Portion 127, Parish of Bingagong, County of Urana, downstream to its confluence with Yanco Creek within Portion 114, Parish of Bingagong, County of Urana.
(38)  Unnamed watercourse from its junction with Yanco Creek, within Reserve 1630, fronting Portion 128, Parish of Uroly, County of Boyd, to its junction with another unnamed watercourse within Portion 132, Parish of Uroly, County of Boyd, at a point approximately 870 metres east from the western boundary and 50 metres south from the northern boundary of the said portion.
(39)  Uri Creek from its junction with the Unnamed Watercourse offtaking from the Murrumbidgee River within portion 94, Parish of Uri, County of Boyd, downstream to its confluence with the Murrumbidgee River.
(40)  Washpen Creek from its confluence with Pine Watercourse and Back Creek within portion 72, Parish of Uroly, County of Boyd to its confluence with Pine Watercourse and Woolshed Creek within the Road Reserve located between portions 163 and 176, Parish of Howell, County of Boyd.
(41)  Woolshed Creek from its confluence with Pine Watercourse and Washpen Creek within Road Reserve between portions 163 and 176, Parish of Howell, County of Boyd, to its confluence with Yanco Creek within WR 1684 adjacent to portion 142, Parish of Howell, County of Urana.
(42)  Yanco Creek from its offtake from the Murrumbidgee River to its confluence with Billabong Creek.

Appendix 4 Performance indicators

Performance indicators for the Murrumbidgee Regulated River Water Sharing Plan
Performance indicator
Related objective
Assessed by:
Commentary
Change in low flows.

10 (a)
10 (b)
10 (c)
10 (g)

•  Number of days per water year where flow is below natural 95th and 80th percentiles.
•  Average and maximum number of days per water year of continuous periods of flow which is below natural 95th and 80th percentiles.
•  Measurement at end of system and specified key sampling sites.
•  River Flow Objectives (RFOs) 1 and 6.
RFOs are the objectives agreed to by the NSW Government aimed at safeguarding river flows for environmental health.

Note.

 Not every objective is relevant to every river in NSW.
•  Analysis would need to incorporate reference to seasonal indicators.
•  Long-term modelling will reflect the influence of climate on flows.
•  Appropriate data relating to flow distribution, such as summer/winter cropping balance, agronomical practices, on farm storage development, management and operation of environmental releases etc.
•  Baseline audit should be the modelled water sharing plan scenario (rather than natural flows).
Change in moderate to high flows.

10 (a)
10 (b)
10 (c)

•  Number of days per water year where flow is above natural 30th 15th and 5th percentiles.
•  Average and maximum number of days per water year of continuous periods of flow which is above natural 30th, 15th and 5th percentiles.
•  Measurement at end of system and other key sampling sites in the water source.
•  RFO 3.
Change in water quality in this water source.

10 (a)
10 (c)

•  Assessment and statistical analysis of key water quality parameters, and relationship to flow.
•  Plan rules will contribute to a long-term change in water quality by affecting flow regimes and flow management to address issues such as algal management.
•  Note that there are many non-water sharing plan related factors that affect water quality (eg land-based activities and thermal pollution).
Change in ecological condition of this water source and dependent ecosystems.

10 (a)
10 (b)
10 (c)

•  Monitoring of ecological response to changed flow regimes, by integrated monitoring of environmental flows (IMEF). Each water source will have specific hypotheses from the set developed under the IMEF model.
•  Other relevant studies as may be undertaken in specific water sources.
•  IMEF tests a number of hypotheses to indicate how elements of river ecology respond to different aspects of the flow regime (including environmental flow regimes, irrigation flows, and floods and wetland connectivity).
Change in economic benefits derived from water extraction and use.

10 (e)
10 (h)

•  Change in regional gross margins versus annual total extractions based on year 1 benchmarks (as represented in IQQM).
•  Movement of water to higher value crops as measured by increases in area and/or water extracted by these enterprises versus lower value uses.
•  Change in unit price of water transferred.
•  Annual total volume of access licence transferred in each water year.
•  Note that there are many factors affecting economic status of a region, such as commodity prices, other sources of water (eg groundwater).
•  The performance indicator is intended to isolate as much as possible the effects of water availability and price on the gross margin returns at a regional level.
•  Assessment undertaken as part of plan performance monitoring will make assumptions to attempt to identify the impact of the plan provisions.
Extent to which basic landholder rights requirements have been met
10 (d)
•  Basic rights allowances made according to plan provisions/implementation program requirements.
•  Flows adequate to meet basic rights requirements (taking into consideration allowances for delivery).
•  Basic rights usage figures in water sharing plans are estimated volumes (not actual use).
•  Basic rights represents a very small proportion of water extraction in regulated systems.
Extent to which local water utility requirements have been met.
10 (f)
•  Percentage of years that reserves were adequate to satisfy urban water requirements.
Extent to which native title rights have been met.
10 (j)
•  Native title rights allowances made according to plan provisions and implementation program requirements.
Extent of recognition of spiritual, social and customary values of water to Aboriginal people.
10 (j)
•  Assessment of amount and type of information collected to identify the range of values of water to Aboriginal people.
•  The collection of information on the values associated with water is considered the first step in addressing the objects of the Act. It would be expected that at the end of five years there should be relevant information collected for each water source, as a minimum requirement.

Appendix 5 (Repealed)

Historical notes

The following abbreviations are used in the Historical notes:
AmamendedLWlegislation websiteSchSchedule
ClclauseNonumberSchsSchedules
CllclausesppageSecsection
DivDivisionpppagesSecssections
DivsDivisionsRegRegulationSubdivSubdivision
GGGovernment GazetteRegsRegulationsSubdivsSubdivisions
InsinsertedReprepealedSubstsubstituted
Table of amending instruments

Water Sharing Plan for the Murrumbidgee Regulated River Water Source 2003 published in Gazette No 264 of 27.12.2002, p 11348 and amended as follows:
Water Management Act 2000 No 92. Assented to 8.12.2000. Date of commencement of Sch 12, 1.1.2006, sec 2 (1) of the Water Management Amendment Act 2005 and GG No 157 of 16.12.2005, p 10884. Amended by Water Management Amendment Act 2005 No 118. Assented to 7.12.2005. Date of commencement of Sch 1 [58], 1.1.2006, sec 2 (1) and GG No 157 of 16.12.2005, p 10884.
Water Management (Ministers’ Plans) Amendment Order 2003 (GG No 101 of 20.6.2003, p 5804 (see also GG No 104 of 27.6.2003, p 6352))
Water Management (Ministers’ Plans) Further Amendment Order 2003 (GG No 197 of 19.12.2003, p 11451)
Water Management (General) Regulation 2004 (GG No 110 of 1.7.2004, p 5008)
Water Management (Minister’s Plans) Order No 2 of 2004 (GG No 110 of 1.7.2004, p 5072)
Statute Law (Miscellaneous Provisions) Act (No 2) 2004 No 91. Assented to 10.12.2004. Date of commencement of Sch 2.109, assent, sec 2 (2).

2006
(54)

Water Sharing Plan for the Murrumbidgee Regulated River Water Source (Amendment) Order No 1 of 2005. GG No 23 of 17.2.2006, p 848.
Date of commencement, on gazettal.

No 58

Statute Law (Miscellaneous Provisions) Act 2006. Assented to 20.6.2006.
Date of commencement of Sch 2.79, assent, sec 2 (2).

2008
(534)

Order. GG No 150 of 21.11.2008, p 11303.
Date of commencement, on gazettal.

2011
(340)

Water Sharing Plan for the Murrumbidgee Regulated River Water Source Amendment Order 2011. LW 1.7.2011.
Date of commencement, on publication on LW, cl 2.

2012
(491)

Water Sharing Plan for the Murrumbidgee Regulated River Water Source Amendment Order 2012. LW 4.10.2012.
Date of commencement, on publication on LW, cl 2.

2013
(611)

Water Sharing Plan for the Murrumbidgee Regulated River Water Source Amendment Order 2013. LW 25.10.2013.
Date of commencement, on publication on LW, cl 2.

Table of amendments

Cl 3
Am 20.6.2003; 19.12.2003; 2012 (491), Sch 1 [1] [2].
Cl 4
Am 1.7.2004. Subst 2012 (491), Sch 1 [3].
Cl 5
Am 2013 (611), Sch 1 [1].
Cl 14
Am 1.7.2004; 2012 (491), Sch 1 [4]–[6].
Cl 15
Am 1.7.2004.
Cl 16
Am 2000 No 92, Sch 12, Part 1 (ins 2005 No 118, Sch 1 [58]).
Cl 18
Am 2012 (491), Sch 1 [7].
Cl 18A
Ins 2012 (491), Sch 1 [8].
Cl 21
Am 1.7.2004.
Cll 24–28
Subst 1.7.2004.
Cl 28A
Ins 2012 (491), Sch 1 [9].
Cl 30
Am 1.7.2004.
Part 8, Div 1, heading
Am 2012 (491), Sch 1 [10].
Cl 31
Subst 2012 (491), Sch 1 [11].
Cl 32
Am 1.7.2004; 2004 No 91, Sch 2.109 [1]; 2012 (491), Sch 1 [12]–[15].
Cl 32A
Ins 2012 (491), Sch 1 [16].
Cl 33
Subst 2012 (491), Sch 1 [17].
Cl 34
Subst 2012 (491), Sch 1 [18].
Cll 34A–34C
Ins 2012 (491), Sch 1 [19].
Cl 35
Am 1.7.2004; 2011 (340), Sch 1 [1]; 2012 (491), Sch 1 [20].
Cll 36, 37
Am 1.7.2004.
Cl 38
Subst 1.7.2004.
Cl 39
Subst 1.7.2004. Am 2008 (534), Sch 1 [1].
Cl 40
Subst 1.7.2004. Am 2006 (54), Sch [1]. Subst 2011 (340), Sch 1 [2].
Cl 41
Subst 1.7.2004.
Cl 42
Subst 1.7.2004; 2012 (491), Sch 1 [21].
Cl 42A
Ins 2012 (491), Sch 1 [22].
Part 9, heading
Am 2012 (491), Sch 1 [23].
Cl 43
Am 2012 (491), Sch 1 [24].
Cl 45
Am 1.7.2004.
Cl 46
Am 2012 (491), Sch 1 [25].
Cl 48
Subst 1.7.2004. Am 2008 (534), Sch 1 [2] [3]; 2012 (491), Sch 1 [26].
Cl 51
Am 1.7.2004. Subst 2012 (491), Sch 1 [27].
Cl 51A
Ins 2012 (491), Sch 1 [28].
Cl 52, notes
Am 1.7.2004
Cl 53
Subst 1.7.2004. Am 2004 No 91, Sch 2.109 [2]; 2008 (534), Sch 1 [4]; 2011 (340), Sch 1 [3]; 2012 (491), Sch 1 [29].
Cl 53A
Ins 2011 (340), Sch 1 [4]. Am 2012 (491), Sch 1 [30].
Cl 54
Am 2012 (491), Sch 1 [31]–[34].
Cl 55
Subst 1.7.2004.
Cl 56
Am 2012 (491), Sch 1 [35].
Cl 57
Subst 1.7.2004. Am 2006 No 58, Sch 2.79; 2012 (491), Sch 1 [36].
Cl 58
Am 2012 (491), Sch 1 [37].
Cl 59
Am 1.7.2004; 2012 (491), Sch 1 [38] [39].
Cl 60
Subst 1.7.2004. Am 2012 (491), Sch 1 [40].
Cl 62
Am 1.7.2004.
Cl 63
Rep 2011 (340), Sch 1 [5].
Cl 67
Subst 2012 (491), Sch 1 [41].
Cl 69
Am 1.7.2004. Rep 2012 (491), Sch 1 [42].
Cl 70, notes
Subst 1.7.2004.
Cl 71
Subst 1.7.2004.
Cl 72
Am 1.7.2004; 2012 (491), Sch 1 [43].
Cl 73
Am 1.7.2004. Subst 2012 (491), Sch 1 [44].
Cl 74
Subst 1.7.2004. Am 2011 (340), Sch 1 [6].
Cl 75
Ins 2000 No 92, Sch 12, Part 2 (ins 2005 No 118, Sch 1 [58]).
Cl 76
Ins 2000 No 92, Sch 12, Part 3 (ins 2005 No 118, Sch 1 [58]).
Sch 1
Am 2004 No 91, Sch 2.109 [3]; 2008 (534), Sch 1 [5]; 2012 (491), Sch 1 [45] [46].
Appendix 1
Subst 1.7.2004; 2012 (491), Sch 1 [47].
Appendices 2, 3
Subst 2012 (491), Sch 1 [47].
Appendix 5
Rep 1.7.2004.
The whole plan
Am 1.7.2004 (“section 42 (2)” omitted wherever occurring in relation to references to the Water Management Act 2000, “section 45 (1) (b)” inserted instead; “section 71A” omitted wherever occurring in relation to references to the Water Management Act 2000, “section 71M” inserted instead; “section 71B”, “section 71C”, “section 71D”, “section 71E”, “section 71F”, “section 71G”, “section 71H”, “section 71I”, “section 71J”, “section 71K” and “section 71L” omitted wherever occurring in relation to references to the Water Management Act 2000, “section 71O”, “section 71P”, “section 71Q”, “section 71R”, “section 71S”, “section 71T”, “section 71U”, “section 71V”, “section 71W”, “section 71Y” and “section 71Z” inserted instead, respectively; “environmental health water” and “supplementary environmental water” omitted wherever occurring, “planned environmental water” inserted instead).
Actions
Download as PDF Download as Word Document


Cases Citing This Decision

0

Cases Cited

0

Statutory Material Cited

0