Penalty: In the case of –
Penalty: In the case of –
| | | | ||||||
| | | | | |||||
| | | | | | | | ||
| 1. | Design plans and specifications | Not required | Not required | Required | Required | Required | Required | Required |
| 2. | Pre-construction investigation, design and report | Not required | Not required | Required | Required | Required | Required | Required |
| 3. | Supervision of construction and decommissioning | Not required | Required | Required | Required | Required | Required | Required |
| 4. | WAE report | Required | Required | Required | Required | Required | Required | Required |
| 5. | Dam safety emergency plans where there is the potential for loss of life in the event of dam failure | Not required | Not required | Not required | Required | Required | Required | Required |
| 6. | Comprehensive surveillance inspections and reports | Not required | Not required | Required | Required | Required | Required | Required |
| 7. | Safety reviews (consequence category assessment) | Required | Required | Required | Required | Required | Required | Required |
| 8. | Dam incident investigation and report | Required | Required | Required | Required | Required | Required | Required |
Penalty: In the case of –
| | | | ||||||
| | | | | |||||
| | | | | | | | ||
| 1. | Design plans and specifications | Required | Required | Required | Required | Required | Required | Required |
| 2. | Pre-construction investigation, design and report | Required | Required | Required | Required | Required | Required | Required |
| 3. | Supervision of construction and decommissioning | Required | Required | Required | Required | Required | Required | Required |
| 4. | WAE report | Required | Required | Required | Required | Required | Required | Required |
| 5. | Dam safety emergency plans where there is the potential for loss of life in the event of dam failure | Not required | Not required | Not required | Required | Required | Required | Required |
| 6. | Comprehensive surveillance inspections and reports | Not required | Not required | Required | Required | Required | Required | Required |
| 7. | Safety reviews (consequence category assessment) | Required | Required | Required | Required | Required | Required | Required |
| 8. | Dam incident investigation and report | Required | Required | Required | Required | Required | Required | Required |
Penalty: In the case of –
| | | | ||||||
| | | | | |||||
| | | | | | | | ||
| 1. | Design plans and specifications | Required | Required | Required | Required | Required | Required | Required |
| 2. | Pre-construction investigation, design and report | Required | Required | Required | Required | Required | Required | Required |
| 3. | Supervision of construction and decommissioning | Required | Required | Required | Required | Required | Required | Required |
| 4. | WAE report | Required | Required | Required | Required | Required | Required | Required |
| 5. | Dam safety emergency plans where there is the potential for loss of life in the event of dam failure | Not required | Not required | Not required | Required | Required | Required | Required |
| 6. | Comprehensive surveillance inspections and reports | Not required | Not required | Required | Required | Required | Required | Required |
| 7. | Safety reviews (consequence category assessment) | Required | Required | Required | Required | Required | Required | Required |
| 8. | Dam incident investigation and report | Required | Required | Required | Required | Required | Required | Required |
Penalty: In the case of –
| | | | ||||||
| | | | | |||||
| | | | | | | | ||
| 1. | Geotechnical and earthquake engineering investigations | Not required | Not required | Required every raise | Required every raise | Required every raise | Required every raise | Required every raise |
| 2. | Design plans and specifications | Required every raise | Required every raise | Required every raise | Required every raise | Required every raise | Required every raise | Required every raise |
| 3. | Pre-construction investigation, design and report | Required every raise | Required every raise | Required every raise | Required every raise | Required every raise | Required every raise | Required every raise |
| 4. | Spillway and decant design | Required every raise | Required every raise | Required every raise | Required every raise | Required every raise | Required every raise | Required every raise |
| 5. | Dam safety emergency plans where there is potential for loss of life in the event of dam failure, or where infrastructure or environmental values could be at risk should the dam collapse or fail | Not required | Not required | Required every raise | Required every raise | Required every raise | Required every raise | Required every raise |
| 6. | Supervision of construction and decommissioning | Required every raise | Required every raise | Required every raise | Required every raise | Required every raise | Required every raise | Required every raise |
| 7. | WAE report | Required every raise | Required every raise | Required every raise | Required every raise | Required every raise | Required every raise | Required every raise |
| 8. | Comprehensive surveillance inspections and reports | Not required | Not required | Required | Required | Required | Required | Required |
Penalty: In the case of –
| | | | ||||||
| | | | | |||||
| | | | | | | | ||
| 1. | Design plans and specifications | No specific class of competence required | No specific class of competence required | Class 1 competence | Class 1 competence | Expert team | Expert team | Expert team |
| 2. | Pre-construction investigation, design and report | No specific class of competence required | No specific class of competence required | Class 1 or Class 3 competence | Class 1 or Class 3 competence | Expert team | Expert team | Expert team |
| 3. | Supervision of construction and decommissioning | No specific class of competence required | Class 2 competence | Class 1 competence | Class 1 competence | Expert team | Expert team | Expert team |
| 4. | WAE report | No specific class of competence required | Class 2 competence | Class 1 competence | Class 1 competence | Expert team | Expert team | Expert team |
| 5. | Dam safety emergency plans & operation and maintenance manuals | No specific class of competence required | No specific class of competence required | Class 1 competence | Class 1 competence | Expert team | Expert team | Expert team |
| 6. | Intermediate surveillance inspections and reports | No specific class of competence required | Class 2 competence | Class 2 competence | Class 2 competence | Class 2 competence | Class 2 competence | Class 2 competence |
| 7. | Comprehensive surveillance inspections and reports | No specific class of competence required | Class 2 competence | Class 2 competence | Class 1 competence | Expert team | Expert team | Expert team |
| 8. | Safety reviews (consequence category assessment) | Class 2 competence or authorised safety reviewer | Class 2 competence or authorised safety reviewer | Class 2 competence | Class 1 competence | Expert team | Expert team | Expert team |
| 9. | Dam incident investigation and report | Class 2 competence | Class 2 competence | Class 1 or Class 3 competence | Class 1 or Class 3 competence | Expert team | Expert team | Expert team |
Penalty: In the case of –
| | | | ||||||
| | | | | |||||
| | | | | | | | ||
| 1. | Design plans and specifications | Class 2 competence | Class 1 competence | Class 1 competence | Class 1 competence | Expert team | Expert team | Expert team |
| 2. | Pre-construction investigation, design and report | Class 2 competence | Class 1 or Class 3 competence | Class 1 or Class 3 competence | Class 1 or Class 3 competence | Expert team | Expert team | Expert team |
| 3. | Supervision of construction and decommissioning | Class 2 competence | Class 1 competence | Class 1 competence | Class 1 competence | Expert team | Expert team | Expert team |
| 4. | WAE report | Class 2 competence | Class 1 competence | Class 1 competence | Class 1 competence | Expert team | Expert team | Expert team |
| 5. | Dam safety emergency plans & operation and maintenance manuals | No specific class of competence required | No specific class of competence required | Class 1 competence | Class 1 competence | Expert team | Expert team | Expert team |
| 6. | Intermediate surveillance inspections and reports | Class 2 competence | Class 2 competence | Class 2 competence | Class 2 competence | Class 2 competence | Class 2 competence | Class 2 competence |
| 7. | Comprehensive surveillance inspections and reports | Class 2 competence | Class 2 competence | Class 1 competence | Class 1 competence | Expert team | Expert team | Expert team |
| 8. | Safety reviews (consequence category assessment) | Class 2 competence or authorised safety reviewer | Class 2 competence | Class 1 competence | Class 1 competence | Expert team | Expert team | Expert team |
| 9. | Dam incident investigation and report | Class 2 competence | Class 2 competence | Class 1 or Class 3 competence | Class 1 or Class 3 competence | Expert team | Expert team | Expert team |
Penalty: In the case of –
| | | | ||||||
| | | | | |||||
| | | | | | | | ||
| 1. | Design plans and specifications | Expert team | Expert team | Expert team | Expert team | Expert team | Expert team | Expert team |
| 2. | Pre-construction investigation, design and report | Expert team | Expert team | Expert team | Expert team | Expert team | Expert team | Expert team |
| 3. | Supervision of construction and decommissioning | Expert team | Expert team | Expert team | Expert team | Expert team | Expert team | Expert team |
| 4. | WAE report | Expert team | Expert team | Expert team | Expert team | Expert team | Expert team | Expert team |
| 5. | Dam safety emergency plans & operation and maintenance manuals | No specific class of competence required | No specific class of competence required | Class 1 competence | Class 1 competence | Expert team | Expert team | Expert team |
| 6. | Intermediate surveillance inspections and reports | Class 2 competence | Class 2 competence | Class 2 competence | Class 2 competence | Class 1 competence | Class 1 competence | Class 1 competence |
| 7. | Comprehensive surveillance inspections and reports | Expert team | Expert team | Expert team | Expert team | Expert team | Expert team | Expert team |
| 8. | Safety reviews (consequence category assessment) | Class 2 competence or authorised safety reviewer | Expert team | Expert team | Expert team | Expert team | Expert team | Expert team |
| 9. | Dam incident investigation and report | Class 2 competence | Class 2 competence | Class 1 or Class 3 competence | Class 1 or Class 3 competence | Expert team | Expert team | Expert team |
Penalty: In the case of –
| | | | ||||||
| | | | | |||||
| | | | | | | | ||
| 1. | Geotechnical and earthquake engineering investigations | No specific class of competence required | No specific class of competence required | Class 1 or Class 3 competence | Class 1 or Class 3 competence | Class 1 or Class 3 competence | Class 1 or Class 3 competence | Class 1 or Class 3 competence |
| 2. | Design plans and specifications | Class 1 or Class 3 competence | Class 1 or Class 3 competence | Class 1 or Class 3 competence | Class 1 or Class 3 competence | Class 1 or Class 3 competence | Class 1 or Class 3 competence | Class 1 or Class 3 competence |
| 3. | Pre-construction investigation, design and report | Class 1 or Class 3 competence | Class 1 or Class 3 competence | Class 1 or Class 3 competence | Class 1 or Class 3 competence | Expert team | Expert team | Expert team |
| 4. | Spillway and decant design | Class 1 or Class 3 competence | Class 1 or Class 3 competence | Class 1 or Class 3 competence | Class 1 or Class 3 competence | Expert team | Expert team | Expert team |
| 5. | Dam safety emergency plans | No specific class of competence required | No specific class of competence required | Class 1 or Class 3 competence | Class 1 or Class 3 competence | Class 1 or Class 3 competence | Class 1 or Class 3 competence | Class 1 or Class 3 competence |
| 6. | Supervision of construction and decommissioning | Class 1 competence | Class 1 competence | Class 1 competence | Class 1 competence | Class 1 competence | Class 1 competence | Class 1 competence |
| 7. | WAE report | Class 1 competence | Class 1 competence | Class 1 competence | Class 1 competence | Expert team | Expert team | Expert team |
| 8. | Intermediate surveillance inspections and reports | No specific class of competence required | No specific class of competence required | Class 1 or Class 3 competence | Class 1 or Class 3 competence | Class 1 or Class 3 competence | Class 1 or Class 3 competence | Class 1 or Class 3 competence |
| 9. | Comprehensive surveillance inspections and reports | No specific class of competence required | Class 1 competence | Class 1 competence | Class 1 or Class 3 competence | Class 1 or Class 3 competence | Class 1 or Class 3 competence | Class 1 or Class 3 competence |
| 10. | External (third party) review | No specific class of competence required | No specific class of competence required | No specific class of competence required | Class 1 or Class 3 competence | Class 1 or Class 3 competence | Class 1 or Class 3 competence | Class 1 or Class 3 competence |
Penalty: In the case of –
1. | For meals, travelling and accommodation: | The same rate and on the same terms as prescribed from time to time for the equivalent allowance in the General Conditions of Service Award made under the Industrial Relations Act 1984 in respect of persons who are State Service officers or State Service employees |
2. | For loss of salary, wages or income resulting from a person’s attendance at the inquiry or examination, if the person is not an expert witness (for each hour, or part of an hour): | The actual loss incurred, up to a maximum of 2.5% of the seasonally adjusted average weekly earnings of a full-time adult employee in Tasmania as published by the Australian Bureau of Statistics for the December quarter for the previous year |
3. | For loss of salary, wages or income resulting from a person’s attendance at the inquiry or examination, if the person is an expert witness: | The amount that the inquirer considers just and reasonable in the circumstances |
Regulation 10
Regulation 19
Water Management (Safety of Dams) Regulations 2011 (No. 84 of 2011) |
Displayed and numbered in accordance with the
Notified in the
These regulations are administered in the Department of Primary Industries, Parks, Water and Environment.
0
0
0