Upper South East Dryland Salinity and Flood Management (Project Scheme) Variation Regulations 2009 (SA)
South Australia
Upper South East Dryland Salinity and Flood Management (Project Scheme) Variation Regulations 2009
under the Upper South East Dryland Salinity and Flood Management Act 2002
Contents
Part 1—Preliminary
Short title
Commencement
Variation provisions
Part 2—Variation of Upper South East Dryland Salinity and Flood Management Regulations 2002
Variation of regulation 5—Establishment of Project scheme
Variation of regulation 6—Project Area
Variation of Schedule 1—The Upper South East
Part 1—Preliminary
1—Short title
These regulations may be cited as the Upper South East Dryland Salinity and Flood Management (Project Scheme) Variation Regulations 2009.
2—Commencement
These regulations come into operation on the day on which they are made.
3—Variation provisions
In these regulations, a provision under a heading referring to the variation of specified regulations varies the regulations so specified.
Part 2—Variation of Upper South East Dryland Salinity and Flood Management Regulations 2002
4—Variation of regulation 5—Establishment of Project scheme
Regulation 5(2)—after paragraph (ba) insert:
(bb)the project scheme as described in the document lodged as Deposit No. 31 of 2009 in the General Registry Office as at 25 August 2009 (and described as REFLOWS); and
5—Variation of regulation 6—Project Area
Regulation 6—after "described in" insert:
the revised
Regulation 6—after "Adelaide" insert:
, as at 4 September 2009
6—Variation of Schedule 1—The Upper South East
Schedule 1—after "Colebatch" insert:
Coles
Note—
As required by section 10AA(2) of the Subordinate Legislation Act 1978, the Minister has certified that, in the Minister's opinion, it is necessary or appropriate that these regulations come into operation as set out in these regulations.
Made by the Governor
with the advice and consent of the Executive Council
on 26 November 2009
No 271 of 2009
WBCS09/0023