Upper South East Dryland Salinity and Flood Management (Project Scheme) Variation Regulations 2008 (SA)

Case

South Australia

Upper South East Dryland Salinity and Flood Management (Project Scheme) Variation Regulations 2008

under the Upper South East Dryland Salinity and Flood Management Act 2002

Contents

Part 1—Preliminary

  1. Short title

  2. Commencement

  3. Variation provisions

Part 2—Variation of Upper South East Dryland Salinity and Flood Management Regulations 2002

  1. Variation of regulation 5—Establishment of Project scheme

Part 1—Preliminary

1—Short title

These regulations may be cited as the Upper South East Dryland Salinity and Flood Management (Project Scheme) Variation Regulations 2008.

2—Commencement

These regulations come into operation on the day on which they are made.

3—Variation provisions

In these regulations, a provision under a heading referring to the variation of specified regulations varies the regulations so specified.

Part 2—Variation of Upper South East Dryland Salinity and Flood Management Regulations 2002

4—Variation of regulation 5—Establishment of Project scheme

Regulation 5(2)(ba)—delete paragraph (ba) and substitute:

(ba)the project scheme as described in the documents lodged as Deposit No. 461 of 2004 and Deposit No. 32 of 2007 in the General Registry Office as at 22 November 2007; and

Note—

As required by section 10AA(2) of the Subordinate Legislation Act 1978, the Minister has certified that, in the Minister's opinion, it is appropriate that these regulations come into operation as set out in these regulations.

Made by the Governor

with the advice and consent of the Executive Council

on 17 January 2008

No 2 of 2008

WBCS07/0019

Actions
Download as PDF Download as Word Document


Cases Citing This Decision

0

Cases Cited

0

Statutory Material Cited

0