Town Planning and Development (Easement) Regulations 1983 (WA)
Western Australia
Planning and Development Act 2005 3
These regulations were repealed by the
Western Australia
Western Australia
Planning and Development Act 2005 3Planning and Development Act 2005
These regulations may be cited as the
These regulations shall come into operation on the day on which section 10 of the
In these regulations unless the contrary intention appears —
(1) Where a plan or diagram is approved by the Inspector of Plans and Surveys to be subject to an easement in favour of an authority or person referred to in paragraph (b) of section 27A(1) of the Act for the purposes mentioned in that paragraph, it shall be coloured in accordance with subregulation (2) and marked in accordance with subregulation (3).
(2) An easement in favour of —
(a) a local authority shall be coloured orange;
(b) the Minister for Water Resources or the Metropolitan Water Authority
2 shall be coloured blue; and(c) an electricity corporation shall be coloured yellow.
(3) Every easement under section 27A of the Act shall be marked by reference to the regulation setting out the rights, powers and privileges in relation to that easement and the marking shall be effected by the regulation number encircled and shown in a clear area on the plan or diagram.
Where land is subject to an easement in favour of a local authority for the purpose of drainage or access to drainage works —
(a) persons acting under the authority of the local authority with or without any equipment may, at any time and from time to time, without liability for damage other than damage caused by negligence, enter upon the affected land to carry out all or any of the following works —
(i) to construct, reconstruct, replace, reinstate, extend, improve, alter, maintain, repair, open or cleanse drains and fittings;
(ii) make surveys and take levels of the affected land;
(iii) use or take away any soil, earth, stones, rubbish or other things taken from the affected land; and
(iv) open and break up the soil of the affected land and excavate and sink trenches;
(b) the local authority may use the drains and the fittings for the conveyance of water and may remove any obstruction of the drains or fittings caused or permitted to be caused by the proprietor.
Where land is subject to an easement in favour of the Authority
(a) a person acting under the authority of the Metropolitan Water Authority with or without any equipment may, at any time and from time to time, without liability for damage other than damage caused by negligence enter upon the affected land to carry out all or any of the following works —
(i) to construct, reconstruct, replace, reinstate, extend, improve, alter, maintain, repair, open or cleanse the pipes and fittings;
(ii) make surveys and take levels of the affected land;
(iii) use or take away any soil, earth, stones, rubbish or other things taken from the affected land; and
(iv) open and break up the soil of the affected land and excavate and sink trenches;
(b) the Authority may use the pipes and fittings for the conveyance of water or sewage and may remove any obstruction of the pipes or fittings caused or permitted to be caused by the proprietor;
(c) the Authority may cut away and keep clear all trees and remove all structures or obstructions which in the opinion of the Authority endanger the proper operation or inspection of the pipes or fittings.
Where land is subject to an above ground electric easement in favour of an electricity corporation —
(a) a person acting under the authority of the electricity corporation with or without equipment may, at any time and from time to time, without liability for damage other than damage caused by negligence, enter upon and use the affected land and remain therein so long as necessary for all or any of the following purposes —
(i) to clear the land;
(ii) to construct, alter, inspect, add to, repair, or maintain electrical equipment in, upon and across the affected land; and
(iii) to remove from the affected land electrical equipment;
(b) the electricity corporation may transmit electricity through electrical equipment on the affected land;
(c) the electricity corporation may cut away and keep clear all trees and remove all structures or obstructions which in the opinion of the electricity corporation endanger the proper operation of the electrical equipment;
(d) the electricity corporation is not required to fence off the affected land or any part thereof but may cut and construct gates as the electricity corporation shall require into any fences crossing the affected land.
Where land is subject to an underground electric easement in favour of an electricity corporation —
(a) a person acting under the authority of the electricity corporation with or without equipment may at any time and from time to time, without liability for damage other than damage caused by negligence enter upon and use the affected land and remain therein so long as necessary for all or any of the following purposes —
(i) to clear and break the surface of the affected land and excavate and remove any soil; and
(ii) to lay down, construct, inspect, remove from, repair or maintain upon, over, under or through the surface of the affected land, cables or pipelines together with energy equipment;
(b) the electricity corporation may convey and transmit energy through energy equipment on the affected land;
(c) the electricity corporation may cut away and keep clear all trees, undergrowth, crops and fences from the affected land and remove all structures or obstructions which in the opinion of the electricity corporation affect the proper operation of the energy equipment;
(d) the electricity corporation is not required to fence off the affected land or any part thereof but may cut and construct gates as the electricity corporation shall require into any fences crossing the affected land; and
(e) the energy equipment brought on to, laid or erected upon or buried in or under the affected land by the electricity corporation shall at all times remain the property of the Commission notwithstanding that the same may be affixed to the freehold and shall be removable in whole or part by the Commission.
Where land is subject to a gas easement in favour of the Electricity Generation Corporation, the Electricity Retail Corporation or the Regional Power Corporation —
(a) a person acting under the authority of the corporation with or without equipment, may at any time and from time to time, without liability for damage other than damage caused by negligence, enter upon and use the affected land and remain therein so long as necessary for all or any of the following purposes —
(i) to clear and break the surface of the affected land and excavate and remove any soil; and
(ii) to lay down, construct, inspect, remove from, repair or maintain upon, over, under or through the surface of the affected land a pipeline;
(b) the corporation may convey and transmit gas through the pipeline on the affected land;
(c) the corporation may cut away and keep clear all trees, undergrowth, crops and fences from the affected land and remove all structures or obstructions which in the opinion of the corporation affect the proper operation of the pipeline;
(d) the corporation is not required to fence off the affected land or any part thereof but may cut and construct gates as the corporation shall require into any fences now or hereafter crossing the affected land; and
(e) the pipeline brought on to, laid or erected upon or buried in or under the affected land by the corporation shall at all times remain the property of the corporation notwithstanding that it may be affixed to the freehold and shall be removable in whole or part by the corporation.
Nothing in these regulations affects any right, power or authority conferred by any other Act on a local authority, the Authority
18 Mar 1983 p. 997‑9 | 18 Mar 1983 (see r. 2 and | ||
31 Mar 2006 p. 1299‑57 | 1 Apr 2006 (see r. 2) | ||
Act...................................................................................................................................... 3
affected land...................................................................................................................... 3
Authority........................................................................................................................... 3
drains.................................................................................................................................. 3
easement............................................................................................................................ 3
electrical equipment........................................................................................................ 3
electricity corporation..................................................................................................... 3
Electricity Generation Corporation............................................................................... 3
Electricity Networks Corporation................................................................................. 3
Electricity Retail Corporation........................................................................................ 3
energy equipment............................................................................................................. 3
fittings................................................................................................................................ 3
local authority................................................................................................................... 3
pipeline.............................................................................................................................. 3
proprietor........................................................................................................................... 3
Regional Power Corporation.......................................................................................... 3
the pipes............................................................................................................................. 3
0
0
0