Therapeutic Goods Legislation Amendment (Fees) Regulations 2021 (Cth)
I, General the Honourable David Hurley AC DSC (Retd), Governor‑General of the Commonwealth of Australia, acting with the advice of the Federal Executive Council, make the following regulations.
Dated 27 May 2021
David Hurley
Governor‑General
By His Excellency’s Command
Greg Hunt
Minister for Health and Aged Care
Contents
This instrument is the
Therapeutic Goods Legislation Amendment (Fees) Regulations 2021 .
(1) Each provision of this instrument specified in column 1 of the table commences, or is taken to have commenced, in accordance with column 2 of the table. Any other statement in column 2 has effect according to its terms.
The whole of this instrument | 1 July 2021. | 1 July 2021 |
Note: This table relates only to the provisions of this instrument as originally made. It will not be amended to deal with any later amendments of this instrument.
(2) Any information in column 3 of the table is not part of this instrument. Information may be inserted in this column, or information in it may be edited, in any published version of this instrument.
This instrument is made under the
Therapeutic Goods Act 1989 .
Each instrument that is specified in a Schedule to this instrument is amended or repealed as set out in the applicable items in the Schedule concerned, and any other item in a Schedule to this instrument has effect according to its terms.
1 | Schedule 5, Part 1, item 1.1 | 1,040 | 1,050 |
2 | Schedule 5, Part 1, item 1.1A | 10,200 | 10,300 |
3 | Schedule 5, Part 1, item 1.2, paragraph (a) | 8,970 | 9,060 |
4 | Schedule 5, Part 1, item 1.2, paragraph (b) | 9,020 | 9,110 |
5 | Schedule 5, Part 1, item 1.3, paragraph (a) | 54,800 | 55,400 |
6 | Schedule 5, Part 1, item 1.3, paragraph (b) | 42,300 | 42,700 |
7 | Schedule 5, Part 1, item 1.3A, paragraph (a) | 31,000 | 31,300 |
8 | Schedule 5, Part 1, item 1.3A, paragraph (b) | 66,000 | 66,700 |
9 | Schedule 5, Part 1, item 1.3A, paragraph (c) | 16,000 | 16,200 |
10 | Schedule 5, Part 1, item 1.3A, paragraph (d) | 3,890 | 3,930 |
11 | Schedule 5, Part 1, item 1.3A, paragraph (e) | 42,700 | 43,100 |
12 | Schedule 5, Part 1, item 1.3A, paragraph (f) | 27,200 | 27,500 |
13 | Schedule 5, Part 1, item 1.4A | 4,660 | 4,710 |
14 | Schedule 5, Part 1, items 1.4B and 1.4C | 2,560 | 2,590 |
15 | Schedule 5, Part 1, item 1.4D | 76,100 | 76,900 |
16 | Schedule 5, Part 1, items 1.4E and 1.4F | 54,600 | 55,200 |
17 | Schedule 5, Part 1, item 1.5, paragraphs (a) and (b) | 1,370 | 1,380 |
18 | Schedule 5, Part 1, item 1.5, paragraphs (c), (d) and (e) | 1,060 | 1,070 |
19 | Schedule 5, Part 1, item 1.5, paragraph (g) | 550 | 560 |
20 | Schedule 5, Part 1, item 1.5, paragraph (h) | 1,060 | 1,070 |
21 | Schedule 5, Part 1, item 1.5A | 10,200 | 10,300 |
22 | Schedule 5, Part 1, item 1.7 | 19,000 | 19,200 |
23 | Schedule 5, Part 1, item 1.9, paragraph (a) | 30,900 | 31,200 |
24 | Schedule 5, Part 1, item 1.9, paragraph (b) | 60,700 | 61,300 |
25 | Schedule 5, Part 1, item 1.9, paragraph (c) | 42,300 | 42,700 |
26 | Schedule 5, Part 1, item 1.9, paragraph (d) | 29,600 | 29,900 |
27 | Schedule 5, Part 1, item 1.9, paragraph (e) | 27,000 | 27,300 |
28 | Schedule 5, Part 1, item 1.9, paragraph (f) | 23,100 | 23,300 |
29 | Schedule 5, Part 1, item 1.9A, paragraph (a) | 31,000 | 31,300 |
30 | Schedule 5, Part 1, item 1.9A, paragraph (b) | 66,000 | 66,700 |
31 | Schedule 5, Part 1, item 1.9A, paragraph (c) | 16,000 | 16,200 |
32 | Schedule 5, Part 1, item 1.9A, paragraph (d) | 3,890 | 3,930 |
33 | Schedule 5, Part 1, item 1.9A, paragraph (e) | 42,700 | 43,100 |
34 | Schedule 5, Part 1, item 1.9A, paragraph (f) | 27,200 | 27,500 |
35 | Schedule 5, Part 1, item 1.10, paragraph (a) | 18,600 | 18,800 |
36 | Schedule 5, Part 1, item 1.10, paragraph (b) | 36,600 | 37,000 |
37 | Schedule 5, Part 1, item 1.10, paragraph (c) | 25,500 | 25,800 |
38 | Schedule 5, Part 1, item 1.10, paragraph (d) | 16,000 | 16,200 |
39 | Schedule 5, Part 1, item 1.10, paragraph (e) | 14,100 | 14,200 |
40 | Schedule 5, Part 1, item 1.13 | 3,990 | 4,030 |
41 | Schedule 5, Part 1, item 1.14 | 7,310 | 7,390 |
42 | Schedule 5, Part 1, item 1.14A | 7,130 | 7,200 |
43 | Schedule 5, Part 1, item 1.14B | 66,000 | 66,700 |
44 | Schedule 5, Part 1, item 1.14C | 16,000 | 16,200 |
45 | Schedule 5, Part 1, item 1.15, paragraphs (a) and (b) | 490 | 500 |
46 | Schedule 5, Part 1, item 1.17 | 1,060 | 1,070 |
Insert:
9B | Evaluation fee (if an evaluation is necessary) for assessing, for the purposes of paragraph 26(1)(d) of the Act, whether a disinfectant is not safe for the purposes for which it is to be used | 19,200 |
1 | Paragraph 43AAJ(1)(b) | 101,800 | 102,900 |
2 | Paragraph 43AC(2)(a) | 4,160 | 4,200 |
3 | Paragraph 43AC(2)(b) | 6,980 | 7,050 |
4 | Paragraph 43AC(2)(c) | 9,100 | 9,200 |
5 | Paragraph 43ACA(2)(aa) | 1,090 | 1,100 |
6 | Paragraph 43ACA(2)(ab) | 7,920 | 8,000 |
7 | Paragraph 43ACA(2)(a) | 4,200 | 4,240 |
8 | Paragraph 43ACA(2)(b) | 6,570 | 6,640 |
9 | Paragraph 43ACA(2)(c) | 9,710 | 9,810 |
10 | Paragraph 45(6)(a) | 1,140 | 1,150 |
11 | Paragraph 45(6)(b) | 4,540 | 4,590 |
12 | Schedule 9, clause 3, item 1A, paragraphs (a) and (b) | 490 | 500 |
13 | Schedule 9, clause 3, item 1, paragraph (a) | 1,790 | 1,810 |
14 | Schedule 9, clause 3, item 1, paragraph (b) | 22,300 | 22,500 |
15 | Schedule 9, clause 3, item 1AA | 13,000 | 13,100 |
16 | Schedule 9, clause 3, item 1AB | 4,700 | 4,750 |
17 | Schedule 9, clause 3, item 1ABA | 8,570 | 8,660 |
18 | Schedule 9, clause 3, item 1AC, paragraph (a) | 49,900 | 50,400 |
19 | Schedule 9, clause 3, item 1AC, paragraph (b) | 29,800 | 30,100 |
20 | Schedule 9, clause 3, item 1AD, paragraph (a) | 260,300 | 263,000 |
21 | Schedule 9, clause 3, item 1AD, paragraph (b) | 171,700 | 173,500 |
22 | Schedule 9, clause 3, item 1AE | 29,700 | 30,000 |
23 | Schedule 9, clause 3, item 1AF | 125,200 | 126,500 |
24 | Schedule 9, clause 3, item 1AG | 17,900 | 18,100 |
25 | Schedule 9, clause 3, item 1B | 13,000 | 13,100 |
26 | Schedule 9, clause 3, item 2, paragraph (ba) | 49,800 | 50,300 |
27 | Schedule 9, clause 3, item 2, paragraph (bb) | 16,500 | 16,700 |
28 | Schedule 9, clause 3, item 2, paragraph (bc) | 33,200 | 33,500 |
29 | Schedule 9, clause 3, item 2, paragraph (bca) | 52,700 | 53,300 |
30 | Schedule 9, clause 3, item 2, paragraph (bd) | 29,700 | 30,000 |
31 | Schedule 9, clause 3, item 2, subparagraph (be)(i) | 9,870 | 9,970 |
32 | Schedule 9, clause 3, item 2, subparagraph (be)(ii) | 6,440 | 6,510 |
33 | Schedule 9, clause 3, item 2, subparagraph (bf)(i) | 19,900 | 20,100 |
34 | Schedule 9, clause 3, item 2, subparagraph (bf)(ii) | 12,900 | 13,000 |
35 | Schedule 9, clause 3, item 2, paragraph (bfa) | 31,400 | 31,700 |
36 | Schedule 9, clause 3, item 2, paragraph (bg) | 19,200 | 19,400 |
37 | Schedule 9, clause 3, item 2, paragraph (bh) | 3,140 | 3,170 |
38 | Schedule 9, clause 3, item 2, paragraph (bi) | 19,400 | 19,600 |
39 | Schedule 9, clause 3, item 2, paragraphs (bj) and (bk) | 1,140 | 1,150 |
40 | Schedule 9, clause 3, item 2, paragraph (c) | 4,530 | 4,580 |
41 | Schedule 9, clause 3, item 2, paragraph (d) | 2,260 | 2,280 |
42 | Schedule 9, clause 3, item 2, paragraph (d) | 13,200 | 13,300 |
43 | Schedule 9, clause 3, item 2A, paragraph (a) | 1,740 | 1,760 |
44 | Schedule 9, clause 3, item 2AC | 1,140 | 1,150 |
45 | Schedule 9, clause 3, item 2B | 5,680 | 5,740 |
46 | Schedule 9, clause 3, item 2C | 4,540 | 4,590 |
47 | Schedule 9, clause 3, item 2CA | 5,680 | 5,740 |
48 | Schedule 9, clause 3, items 2CB, 2CC and 2CD | 830 | 840 |
49 | Schedule 9, clause 3, item 2CE, paragraphs (a) and (b) | 830 | 840 |
50 | Schedule 9, clause 3, item 3, paragraph (b) | 860 | 870 |
51 | Schedule 9, clause 3, item 4, paragraph (a) | 199,500 | 201,600 |
52 | Schedule 9, clause 3, item 4, subparagraphs (aa)(i) and (ii) | 66,600 | 67,300 |
53 | Schedule 9, clause 3, item 4, subparagraph (aa)(iii) | 132,700 | 134,100 |
54 | Schedule 9, clause 3, item 4, paragraph (ab) | 211,000 | 213,200 |
55 | Schedule 9, clause 3, item 4, paragraph (b) | 118,400 | 119,600 |
56 | Schedule 9, clause 3, item 4, subparagraph (bb)(i) | 39,500 | 39,900 |
57 | Schedule 9, clause 3, item 4, subparagraph (bb)(i) | 25,600 | 25,900 |
58 | Schedule 9, clause 3, item 4, subparagraph (bb)(ii) | 39,500 | 39,900 |
59 | Schedule 9, clause 3, item 4, subparagraph (bb)(ii) | 25,600 | 25,900 |
60 | Schedule 9, clause 3, item 4, subparagraph (bb)(iii) | 78,900 | 79,700 |
61 | Schedule 9, clause 3, item 4, subparagraph (bb)(iii) | 51,600 | 52,100 |
62 | Schedule 9, clause 3, item 4, paragraph (bc) | 4,540 | 4,590 |
63 | Schedule 9, clause 3, item 4, paragraph (bd) | 125,500 | 126,800 |
64 | Schedule 9, clause 3, item 4, paragraph (c) | 76,200 | 77,000 |
65 | Schedule 9, clause 3, item 4, paragraph (d) | 12,500 | 12,600 |
66 | Schedule 9, clause 3, item 4, paragraph (g) | 77,200 | 78,000 |
67 | Schedule 9, clause 3, item 4, paragraph (h) | 4,540 | 4,590 |
68 | Schedule 9, clause 3, item 6AA | 660 | 670 |
69 | Schedule 9, clause 3, item 6AB | 710 | 720 |
70 | Schedule 9, clause 3, item 6ABA | 2,530 | 2,560 |
71 | Schedule 9, clause 3, item 6AC | 1,200 | 1,210 |
72 | Schedule 9, clause 3, item 6B | 3,810 | 3,850 |
73 | Schedule 9, clause 3, item 6C | 8,270 | 8,360 |
74 | Schedule 9, clause 3, item 6D, paragraph (a) | 10,900 | 11,000 |
75 | Schedule 9, clause 3, item 6D, paragraph (b) | 14,100 | 14,200 |
76 | Schedule 9, clause 3, item 6D, paragraph (c) | 19,200 | 19,400 |
77 | Schedule 9, clause 3, item 6D, paragraph (d) | 25,400 | 25,700 |
78 | Schedule 9, clause 3, item 6D, paragraph (e) | 38,100 | 38,500 |
79 | Schedule 9, clause 3, item 6D, paragraph (f) | 50,800 | 51,300 |
80 | Schedule 9, clause 3, item 6D, paragraph (g) | 76,200 | 77,000 |
81 | Schedule 9, clause 3, item 7A, paragraph (a) | 10,900 | 11,000 |
82 | Schedule 9, clause 3, item 7A, subparagraph (b)(i) | 10,900 | 11,000 |
83 | Schedule 9, clause 3, item 7A, subparagraph (b)(ii) | 14,100 | 14,200 |
84 | Schedule 9, clause 3, item 7A, subparagraph (b)(iii) | 19,200 | 19,400 |
85 | Schedule 9, clause 3, item 7A, subparagraph (b)(iv) | 25,400 | 25,700 |
86 | Schedule 9, clause 3, item 7A, subparagraph (b)(v) | 38,100 | 38,500 |
87 | Schedule 9, clause 3, item 7A, subparagraph (b)(vi) | 50,800 | 51,300 |
88 | Schedule 9, clause 3, item 7A, subparagraph (b)(vii) | 76,200 | 77,000 |
89 | Schedule 9, clause 3, item 7B, paragraph (a) | 10,900 | 11,000 |
90 | Schedule 9, clause 3, item 7B, subparagraph (b)(i) | 10,900 | 11,000 |
91 | Schedule 9, clause 3, item 7B, subparagraph (b)(ii) | 14,100 | 14,200 |
92 | Schedule 9, clause 3, item 7B, subparagraph (b)(iii) | 19,200 | 19,400 |
93 | Schedule 9, clause 3, item 7B, subparagraph (b)(iv) | 25,400 | 25,700 |
94 | Schedule 9, clause 3, item 7B, subparagraph (b)(v) | 38,100 | 38,500 |
95 | Schedule 9, clause 3, item 7B, subparagraph (b)(vi) | 50,800 | 51,300 |
96 | Schedule 9, clause 3, item 7B, subparagraph (b)(vii) | 76,200 | 77,000 |
97 | Schedule 9, clause 3, item 7C | 1,080 | 1,090 |
98 | Schedule 9, clause 3, item 8, paragraph (a) | 810 | 820 |
99 | Schedule 9, clause 3, item 8, paragraph (b) | 1,060 | 1,070 |
100 | Schedule 9, clause 3, items 8A, 8B and 8C | 810 | 820 |
101 | Schedule 9, clause 3, item 9, paragraph (a) | 1,010 | 1,020 |
102 | Schedule 9, clause 3, item 9, paragraph (b) | 1,420 | 1,430 |
103 | Schedule 9, clause 3, item 9AA | 690 | 700 |
104 | Schedule 9, clause 3, item 9AB | 940 | 950 |
105 | Schedule 9, clause 3, items 9AC and 9ACA | 690 | 700 |
106 | Schedule 9, clause 3, item 9AD, paragraph (a) | 1,370 | 1,380 |
107 | Schedule 9, clause 3, item 9AD, paragraph (b) | 11,600 | 11,700 |
108 | Schedule 9, clause 3, item 9AD, paragraph (c) | 26,100 | 26,400 |
109 | Schedule 9, clause 3, item 9AD, paragraph (d) | 35,100 | 35,500 |
110 | Schedule 9, clause 3, item 9AD, paragraph (e) | 54,700 | 55,300 |
111 | Schedule 9, clause 3, item 9AD, paragraph (f) | 72,900 | 73,700 |
112 | Schedule 9, clause 3, item 9AD, paragraph (g) | 89,000 | 89,900 |
113 | Schedule 9, clause 3, item 18 | 2,300 | 2,320 |
114 | Schedule 9, clause 4, item 1, paragraphs (a) and (b) | 1,680 | 1,700 |
115 | Schedule 9, clause 4, item 1, paragraph (c) | 2,700 | 2,730 |
116 | Schedule 9, clause 4, item 1, paragraph (d) | 3,950 | 3,990 |
117 | Schedule 9, clause 4, item 1, paragraph (e) | 5,850 | 5,910 |
118 | Schedule 9, clause 4, item 1, paragraphs (f), (g) and (h) | 1,680 | 1,700 |
119 | Schedule 9, clause 4, item 1, paragraph (i) | 2,700 | 2,730 |
120 | Schedule 9, clause 4, item 2, paragraph (a) | 4,160 | 4,200 |
121 | Schedule 9, clause 4, item 2, paragraph (b) | 5,910 | 5,970 |
122 | Schedule 9, clause 4, item 2, paragraph (c) | 9,100 | 9,200 |
123 | Schedule 9, clause 4, item 2, paragraph (d) | 15,100 | 15,300 |
124 | Schedule 9, clause 4, item 2, paragraph (e) | 22,300 | 22,500 |
125 | Schedule 9, clause 4, item 2, paragraph (f) | 4,160 | 4,200 |
126 | Schedule 9, clause 4, item 2, paragraph (g) | 6,980 | 7,050 |
127 | Schedule 9, clause 4, item 2, paragraph (h) | 9,100 | 9,200 |
128 | Schedule 9, clause 4, item 3, paragraphs (d) and (e) | 850 | 860 |
129 | Schedule 9, clause 4, item 3, paragraphs (f), (g) and (h) | 1,360 | 1,370 |
130 | Schedule 9, clause 4, item 4, paragraphs (d), (e) and (f) | 4,610 | 4,660 |
131 | Schedule 9, clause 4, item 5, paragraph (a) | 1,680 | 1,700 |
132 | Schedule 9, clause 4, item 5, paragraph (b) | 5,850 | 5,910 |
133 | Schedule 9, clause 4, item 5, paragraph (c) | 8,670 | 8,760 |
134 | Schedule 9, clause 4, item 5, paragraph (d) | 11,800 | 11,900 |
135 | Schedule 9, clause 4, item 7, paragraph (a) | 1,650 | 1,670 |
136 | Schedule 9, clause 4, item 7, paragraph (b) | 8,470 | 8,560 |
137 | Schedule 9, clause 5, item 1A | 2,030 | 2,050 |
138 | Schedule 9, clause 5, item 1B | 8,860 | 8,950 |
139 | Schedule 9, clause 5, item 1C | 810 | 820 |
140 | Schedule 9, clause 5, items 1D and 1E | 940 | 950 |
141 | Schedule 9, clause 5, item 1F | 810 | 820 |
142 | Schedule 9, clause 5, item 1G | 1,090 | 1,100 |
143 | Schedule 9, clause 5, item 1H | 7,920 | 8,000 |
144 | Schedule 9, clause 5, item 1 | 1,470 | 1,490 |
145 | Schedule 9, clause 5, item 2 | 4,980 | 5,030 |
146 | Schedule 9, clause 5, item 3 | 7,390 | 7,470 |
147 | Schedule 9, clause 5, item 4 | 10,500 | 10,600 |
148 | Schedule 9, clause 5, item 5 | 1,470 | 1,490 |
149 | Schedule 9, clause 5, item 6 | 770 | 780 |
150 | Schedule 9, clause 5, item 7 | 4,200 | 4,240 |
151 | Schedule 9, clause 5, item 8 | 830 | 840 |
152 | Schedule 9, clause 5, item 9 | 6,570 | 6,640 |
153 | Schedule 9, clause 5, item 10 | 850 | 860 |
154 | Schedule 9, clause 5, item 11 | 9,710 | 9,810 |
155 | Schedule 9, clause 5, item 12 | 560 | 570 |
156 | Schedule 9, clause 5, item 13 | 3,240 | 3,270 |
157 | Schedule 9, clause 5, item 14 | 2,030 | 2,050 |
158 | Schedule 9, clause 5, item 15 | 21,700 | 21,900 |
159 | Schedule 9, clause 5, item 16 | 2,030 | 2,050 |
160 | Schedule 9, clause 5, item 17 | 21,700 | 21,900 |
161 | Schedule 9, clause 5, item 18 | 2,680 | 2,710 |
162 | Schedule 9, clause 5, item 19 | 29,500 | 29,800 |
163 | Schedule 9, clause 5, item 20 | 2,940 | 2,970 |
164 | Schedule 9, clause 5, item 21 | 37,600 | 38,000 |
165 | Schedule 9, clause 5, item 23 | 1,730 | 1,750 |
166 | Schedule 9, clause 5, item 24 | 1,870 | 1,890 |
167 | Schedule 9, clause 5, item 25 | 14,300 | 14,500 |
168 | Schedule 9, clause 5, item 26 | 1,870 | 1,890 |
169 | Schedule 9, clause 5, item 27 | 14,300 | 14,500 |
170 | Schedule 9, clause 5, item 28 | 1,110 | 1,120 |
171 | Schedule 9, clause 5, item 29 | 14,900 | 15,100 |
172 | Schedule 9, clause 5, item 30 | 1,110 | 1,120 |
173 | Schedule 9, clause 5, item 31 | 14,900 | 15,100 |
174 | Schedule 9, clause 5, item 32 | 2,940 | 2,970 |
175 | Schedule 9, clause 5, item 33 | 24,300 | 24,600 |
176 | Schedule 9, clause 5, item 34 | 2,940 | 2,970 |
177 | Schedule 9, clause 5, item 35 | 24,300 | 24,600 |
178 | Schedule 9A, Part 2, items 1, 2 and 3 | 1,130 | 1,140 |
179 | Schedule 9A, Part 2, item 4 | 75,100 | 75,900 |
180 | Schedule 9A, Part 2, item 5 | 150,300 | 151,900 |
181 | Schedule 9A, Part 2, item 6 | 244,200 | 246,800 |
182 | Schedule 9A, Part 2, item 7 | 24,400 | 24,700 |
183 | Schedule 9A, Part 2, item 8 | 1,130 | 1,140 |
184 | Schedule 9A, Part 2, items 8A and 9 | 6,890 | 6,960 |
185 | Schedule 9A, Part 2, item 10 | 18,100 | 18,300 |
186 | Schedule 9A, Part 2, item 11 | 35,600 | 36,000 |
187 | Schedule 9A, Part 2, item 11A, paragraphs (a) and (b) | 490 | 500 |
188 | Schedule 9A, Part 2, item 12 | 22,300 | 22,500 |
189 | Schedule 9A, Part 2, item 13 | 16,900 | 17,100 |
190 | Schedule 9A, Part 2, item 14 | 690 | 700 |
191 | Schedule 9A, Part 2, item 16 | 27,100 | 27,400 |
0
0
0