Therapeutic Goods Legislation Amendment (Fees and Other Measures) Regulation 2016 (Cth)
I, General the Honourable Sir Peter Cosgrove AK MC (Ret’d), Governor‑General of the Commonwealth of Australia, acting with the advice of the Federal Executive Council, make the following regulation.
Dated 05 May 2016
Peter Cosgrove
Governor‑General
By His Excellency’s Command
Sussan Ley
Minister for Health
Contents
This is the
Therapeutic Goods Legislation Amendment (Fees and Other Measures) Regulation 2016 .
(1) Each provision of this instrument specified in column 1 of the table commences, or is taken to have commenced, in accordance with column 2 of the table. Any other statement in column 2 has effect according to its terms.
The whole of this instrument | 1 July 2016. | 1 July 2016 |
Note: This table relates only to the provisions of this instrument as originally made. It will not be amended to deal with any later amendments of this instrument.
(2) Any information in column 3 of the table is not part of this instrument. Information may be inserted in this column, or information in it may be edited, in any published version of this instrument.
This instrument is made under the
Therapeutic Goods Act 1989.
Each instrument that is specified in a Schedule to this instrument is amended or repealed as set out in the applicable items in the Schedule concerned, and any other item in a Schedule to this instrument has effect according to its terms.
1 | Paragraph 9.4(2)(b) | 3 785 | 3 870 |
2 | Schedule 5, item 1.1 | 940 | 960 |
3 | Schedule 5, item 1.2, paragraph (a) | 8 135 | 8 320 |
4 | Schedule 5, item 1.2, paragraph (b) | 8 190 | 8 375 |
5 | Schedule 5, item 1.3, paragraph (a) | 49 800 | 50 900 |
6 | Schedule 5, item 1.3, paragraph (b) | 38 400 | 39 300 |
7 | Schedule 5, item 1.3A, paragraph (a) | 28 100 | 28 700 |
8 | Schedule 5, item 1.3A, paragraph (b) | 59 900 | 61 200 |
9 | Schedule 5, item 1.3A, paragraph (c) | 14 600 | 14 900 |
10 | Schedule 5, item 1.3A, paragraph (d) | 3 535 | 3 615 |
11 | Schedule 5, item 1.3A, paragraph (e) | 38 700 | 39 600 |
12 | Schedule 5, item 1.3A, paragraph (f) | 24 700 | 25 300 |
13 | Schedule 5, item 1.5, paragraphs (a) and (b) | 1 235 | 1 265 |
14 | Schedule 5, item 1.5, paragraphs (c) to (f) | 960 | 980 |
15 | Schedule 5, item 1.7 | 17 200 | 17 600 |
16 | Schedule 5, item 1.8 | 335 | 345 |
17 | Schedule 5, item 1.9, paragraph (a) | 28 000 | 28 600 |
18 | Schedule 5, item 1.9, paragraph (b) | 55 100 | 56 300 |
19 | Schedule 5, item 1.9, paragraph (c) | 38 400 | 39 300 |
20 | Schedule 5, item 1.9, paragraph (d) | 26 800 | 27 400 |
21 | Schedule 5, item 1.9, paragraph (e) | 24 500 | 25 100 |
22 | Schedule 5, item 1.9, paragraph (f) | 20 900 | 21 400 |
23 | Schedule 5, item 1.9A, paragraph (a) | 28 100 | 28 700 |
24 | Schedule 5, item 1.9A, paragraph (b) | 59 900 | 61 200 |
25 | Schedule 5, item 1.9A, paragraph (c) | 14 600 | 14 900 |
26 | Schedule 5, item 1.9A, paragraph (d) | 3 535 | 3 615 |
27 | Schedule 5, item 1.9A, paragraph (e) | 38 700 | 39 600 |
28 | Schedule 5, item 1.9A, paragraph (f) | 24 700 | 25 300 |
29 | Schedule 5, item 1.10, paragraph (a) | 16 800 | 17 200 |
30 | Schedule 5, item 1.10, paragraph (b) | 33 200 | 33 900 |
31 | Schedule 5, item 1.10, paragraph (c) | 23 100 | 23 600 |
32 | Schedule 5, item 1.10, paragraph (d) | 14 600 | 14 900 |
33 | Schedule 5, item 1.10, paragraph (e) | 12 700 | 13 000 |
34 | Schedule 5, item 1.12 | 390 | 400 |
35 | Schedule 5, item 1.13 | 3 620 | 3 700 |
36 | Schedule 5, item 1.14 | 6 640 | 6 790 |
37 | Schedule 5, item 1.14A | 6 465 | 6 610 |
38 | Schedule 5, item 1.14B | 59 900 | 61 200 |
39 | Schedule 5, item 1.14C | 14 600 | 14 900 |
40 | Schedule 5, item 1.15 | 420 | 430 |
41 | Schedule 5, item 1.17 | 960 | 980 |
42 | Schedule 5, paragraph 2.1(b) | 390 | 400 |
2
Clause 1 of Schedule 9A (definition of major variation ) After “the following”, insert “, other than a change that would result in the biological becoming separate and distinct from other biologicals”.
3
Clause 1 of Schedule 9A (paragraph (b) of the definition of major variation ) Repeal the paragraph.
4
Clause 1 of Schedule 9A (definition of minor variation ) Repeal the definition, substitute:
minor variation , for a biological, means a change to the entry of the biological in the Register that requires the evaluation of quality and manufacturing information, other than a change that is a major variation for the biological or that would result in the biological becoming separate and distinct from other biologicals.
5
Part 2 of Schedule 9A (cell at table item 8, column headed “Matter”) Repeal the cell, substitute:
Application under subsection 9D(3AA) or (3A) of the Act to vary the entry of a biological in the Register |
Insert:
8A | Evaluation of an application under subsection 9D(3AA) of the Act to vary the entry of a biological in the Register | $6 395 for each evaluation |
7
Part 2 of Schedule 9A (cell at table item 9, column headed “Matter”) Repeal the cell, substitute:
Evaluation of an application under subsection 9D(3A) of the Act to vary the entry of a Class 2 biological in the Register |
8
Part 2 of Schedule 9A (cell at table item 10, column headed “Matter”) Repeal the cell, substitute:
Evaluation of an application under subsection 9D(3A) of the Act to vary the entry of a Class 3 or Class 4 biological in the Register, if the variation is a minor variation |
9
Part 2 of Schedule 9A (cell at table item 11, column headed “Matter”) Repeal the cell, substitute:
Evaluation of an application under subsection 9D(3A) of the Act to vary the entry of a Class 3 or Class 4 biological in the Register, if the variation is a major variation |
1 | Paragraph 43AAJ(1)(b) | 92 400 | 94 500 |
2 | Paragraph 45(4A)(a) | 10 300 | 10 500 |
3 | Paragraph 45(4A)(b) | 8 575 | 8 770 |
4 | Paragraphs 45(4A)(c) and (ca) | 8 290 | 8 475 |
5 | Paragraph 45(4A)(d) | 34 500 | 35 300 |
6 | Paragraphs 45(4A)(e) and (f) | 8 290 | 8 475 |
7 | Paragraphs 45(9)(a) to (e) | 5 155 | 5 270 |
8 | Paragraphs 45(11)(a) to (e) | 1 885 | 1 925 |
9 | Schedule 9, Part 2, item 1A | 440 | 450 |
10 | Schedule 9, Part 2, item 1, paragraph (a) | 1 630 | 1 665 |
11 | Schedule 9, Part 2, item 1, paragraph (b) | 20 300 | 20 800 |
12 | Schedule 9, Part 2, item 1, paragraph (c) | 17 200 | 17 600 |
13 | Schedule 9, Part 2, item 1, paragraph (d) | 2 585 | 2 645 |
14 | Schedule 9, Part 2, item 2, paragraph (a) | 1 475 | 1 510 |
15 | Schedule 9, Part 2, item 2, paragraph (b) | 1 380 | 1 410 |
16 | Schedule 9, Part 2, item 2, paragraph (ba) | 45 100 | 46 100 |
17 | Schedule 9, Part 2, item 2, paragraph (bb) | 15 000 | 15 300 |
18 | Schedule 9, Part 2, item 2, paragraph (bc) | 30 100 | 30 800 |
19 | Schedule 9, Part 2, item 2, paragraph (bd) | 26 900 | 27 500 |
20 | Schedule 9, Part 2, item 2, subparagraph (be)(i) | 8 960 | 9 160 |
21 | Schedule 9, Part 2, item 2, subparagraph (be)(ii) | 5 845 | 5 975 |
22 | Schedule 9, Part 2, item 2, subparagraph (bf)(i) | 18 000 | 18 400 |
23 | Schedule 9, Part 2, item 2, subparagraph (bf)(ii) | 11 700 | 12 000 |
24 | Schedule 9, Part 2, item 2, paragraph (bg) | 17 400 | 17 800 |
25 | Schedule 9, Part 2, item 2, paragraph (bh) | 2 845 | 2 910 |
26 | Schedule 9, Part 2, item 2, paragraph (bi) | 17 600 | 18 000 |
27 | Schedule 9, Part 2, item 2, paragraphs (bj) and (bk) | 1 035 | 1 060 |
28 | Schedule 9, Part 2, item 2, paragraph (c) | 4 110 | 4 200 |
29 | Schedule 9, Part 2, item 2, paragraph (d) | 2 060 | 2 105 |
30 | Schedule 9, Part 2, item 2, paragraph (d) | 11 900 | 12 200 |
31 | Schedule 9, Part 2, item 2, paragraph (f) | 650 | 665 |
32 | Schedule 9, Part 2, item 2, paragraph (g) | 1 380 | 1 410 |
33 | Schedule 9, Part 2, item 2, paragraph (h) | 690 | 705 |
34 | Schedule 9, Part 2, item 2AA | 630 | 645 |
35 | Schedule 9, Part 2, item 2A, paragraph (a) | 1 590 | 1 625 |
36 | Schedule 9, Part 2, item 2A, paragraph (b) | 1 475 | 1 510 |
37 | Schedule 9, Part 2, item 2A, paragraph (c) | 390 | 400 |
38 | Schedule 9, Part 2, item 2A, paragraphs (d) to (g) | 420 | 430 |
39 | Schedule 9, Part 2, item 2AB | 400 | 410 |
40 | Schedule 9, Part 2, item 2AC | 1 035 | 1 060 |
41 | Schedule 9, Part 2, item 2B | 5 155 | 5 270 |
42 | Schedule 9, Part 2, item 2C | 4 120 | 4 215 |
43 | Schedule 9, Part 2, item 2CA | 5 155 | 5 270 |
44 | Schedule 9, Part 2, item 3, paragraph (a) | 420 | 430 |
45 | Schedule 9, Part 2, item 3, paragraph (b) | 775 | 790 |
46 | Schedule 9, Part 2, item 3AA | 630 | 645 |
47 | Schedule 9, Part 2, item 4, paragraph (a) | 181 000 | 185 100 |
48 | Schedule 9, Part 2, item 4, subparagraphs (aa)(i) and (ii) | 60 400 | 61 800 |
49 | Schedule 9, Part 2, item 4, subparagraph (aa)(iii) | 120 500 | 123 200 |
50 | Schedule 9, Part 2, item 4, paragraph (b) | 107 500 | 109 900 |
51 | Schedule 9, Part 2, item 4, subparagraph (bb)(i) | 35 800 | 36 600 |
52 | Schedule 9, Part 2, item 4, subparagraph (bb)(i) | 23 200 | 23 700 |
53 | Schedule 9, Part 2, item 4, subparagraph (bb)(ii) | 35 800 | 36 600 |
54 | Schedule 9, Part 2, item 4, subparagraph (bb)(ii) | 23 200 | 23 700 |
55 | Schedule 9, Part 2, item 4, subparagraph (bb)(iii) | 71 600 | 73 200 |
56 | Schedule 9, Part 2, item 4, subparagraph (bb)(iii) | 46 800 | 47 900 |
57 | Schedule 9, Part 2, item 4, paragraph (bc) | 4 120 | 4 200 |
58 | Schedule 9, Part 2, item 4, paragraph (c) | 69 000 | 70 600 |
59 | Schedule 9, Part 2, item 4, paragraph (d) | 11 400 | 11 700 |
60 | Schedule 9, Part 2, item 4, paragraph (g) | 70 000 | 71 600 |
61 | Schedule 9, Part 2, item 4, paragraph (h) | 4 120 | 4 215 |
62 | Schedule 9, Part 2, item 5, paragraph (a) | 9 870 | 10 100 |
63 | Schedule 9, Part 2, item 5, subparagraph (b)(i) | 9 870 | 10 100 |
64 | Schedule 9, Part 2, item 5, subparagraph (b)(ii) | 12 700 | 13 000 |
65 | Schedule 9, Part 2, item 5, subparagraph (b)(iii) | 17 400 | 17 800 |
66 | Schedule 9, Part 2, item 5, subparagraph (b)(iv) | 23 000 | 23 500 |
67 | Schedule 9, Part 2, item 5, subparagraph (b)(v) | 34 500 | 35 300 |
68 | Schedule 9, Part 2, item 5, subparagraph (b)(vi) | 46 100 | 47 100 |
69 | Schedule 9, Part 2, item 5, subparagraph (b)(vii) | 69 000 | 70 600 |
70 | Schedule 9, Part 2, item 5, paragraph (c) | 3 565 | 3 645 |
71 | Schedule 9, Part 2, item 5, subparagraph (d)(i) | 3 565 | 3 645 |
72 | Schedule 9, Part 2, item 5, subparagraph (d)(ii) | 12 700 | 13 000 |
73 | Schedule 9, Part 2, item 5, subparagraph (d)(iii) | 17 400 | 17 800 |
74 | Schedule 9, Part 2, item 5, subparagraph (d)(iv) | 23 000 | 23 500 |
75 | Schedule 9, Part 2, item 5, subparagraph (d)(v) | 34 500 | 35 300 |
76 | Schedule 9, Part 2, item 5, subparagraph (d)(vi) | 46 100 | 47 100 |
77 | Schedule 9, Part 2, item 5, subparagraph (d)(vii) | 69 000 | 70 600 |
78 | Schedule 9, Part 2, item 5A, paragraphs (a) to (f) | 5 155 | 5 270 |
79 | Schedule 9, Part 2, item 5B | 17 200 | 17 600 |
80 | Schedule 9, Part 2, item 6, paragraph (a) | 30 200 | 30 900 |
81 | Schedule 9, Part 2, item 6, paragraphs (b) to (ca) | 20 600 | 21 100 |
82 | Schedule 9, Part 2, item 6, paragraph (d) | 34 500 | 35 300 |
83 | Schedule 9, Part 2, item 6AA | 370 | 380 |
84 | Schedule 9, Part 2, item 6AB | 650 | 665 |
85 | Schedule 9, Part 2, item 6ABA | 1 955 | 2 000 |
86 | Schedule 9, Part 2, item 6AC | 1 100 | 1 125 |
87 | Schedule 9, Part 2, item 6AD, paragraph (a) | 20 600 | 21 100 |
88 | Schedule 9, Part 2, item 6AD, paragraph (b) | 5 155 | 5 270 |
89 | Schedule 9, Part 2, item 6A | 1 380 | 1 410 |
90 | Schedule 9, Part 2, item 6B | 3 450 | 3 530 |
91 | Schedule 9, Part 2, item 6C | 7 505 | 7 675 |
92 | Schedule 9, Part 2, item 6D, paragraph (a) | 9 870 | 10 100 |
93 | Schedule 9, Part 2, item 6D, paragraph (b) | 12 700 | 13 000 |
94 | Schedule 9, Part 2, item 6D, paragraph (c) | 17 400 | 17 800 |
95 | Schedule 9, Part 2, item 6D, paragraph (d) | 23 000 | 23 500 |
96 | Schedule 9, Part 2, item 6D, paragraph (e) | 34 500 | 35 300 |
97 | Schedule 9, Part 2, item 6D, paragraph (f) | 46 100 | 47 100 |
98 | Schedule 9, Part 2, item 6D, paragraph (g) | 69 000 | 70 600 |
99 | Schedule 9, Part 2, item 7, paragraph (a) | 10 300 | 10 500 |
100 | Schedule 9, Part 2, item 7, paragraphs (b) to (ca) | 8 575 | 8 770 |
101 | Schedule 9, Part 2, item 7, paragraph (d) | 34 500 | 35 300 |
102 | Schedule 9, Part 2, item 7, paragraphs (e) and (f) | 8 575 | 8 770 |
103 | Schedule 9, Part 2, item 7A, paragraph (a) | 9 870 | 10 100 |
104 | Schedule 9, Part 2, item 7A, subparagraph (b)(i) | 9 870 | 10 100 |
105 | Schedule 9, Part 2, item 7A, subparagraph (b)(ii) | 12 700 | 13 000 |
106 | Schedule 9, Part 2, item 7A, subparagraph (b)(iii) | 17 400 | 17 800 |
107 | Schedule 9, Part 2, item 7A, subparagraph (b)(iv) | 23 000 | 23 500 |
108 | Schedule 9, Part 2, item 7A, subparagraph (b)(v) | 34 500 | 35 300 |
109 | Schedule 9, Part 2, item 7A, subparagraph (b)(vi) | 46 100 | 47 100 |
110 | Schedule 9, Part 2, item 7A, subparagraph (b)(vii) | 69 000 | 70 600 |
111 | Schedule 9, Part 2, item 7B, paragraph (a) | 9 870 | 10 100 |
112 | Schedule 9, Part 2, item 7B, subparagraph (b)(i) | 9 870 | 10 100 |
113 | Schedule 9, Part 2, item 7B, subparagraph (b)(ii) | 12 700 | 13 000 |
114 | Schedule 9, Part 2, item 7B, subparagraph (b)(iii) | 17 400 | 17 800 |
115 | Schedule 9, Part 2, item 7B, subparagraph (b)(iv) | 23 000 | 23 500 |
116 | Schedule 9, Part 2, item 7B, subparagraph (b)(v) | 34 500 | 35 300 |
117 | Schedule 9, Part 2, item 7B, subparagraph (b)(vi) | 46 100 | 47 100 |
118 | Schedule 9, Part 2, item 7B, subparagraph (b)(vii) | 69 000 | 70 600 |
119 | Schedule 9, Part 2, item 7C, paragraph (a) | 9 870 | 10 100 |
120 | Schedule 9, Part 2, item 7C, subparagraph (b)(i) | 9 870 | 10 100 |
121 | Schedule 9, Part 2, item 7C, subparagraph (b)(ii) | 12 700 | 13 000 |
122 | Schedule 9, Part 2, item 7C, subparagraph (b)(iii) | 17 400 | 17 800 |
123 | Schedule 9, Part 2, item 7C, subparagraph (b)(iv) | 23 000 | 23 500 |
124 | Schedule 9, Part 2, item 7C, subparagraph (b)(v) | 34 500 | 35 300 |
125 | Schedule 9, Part 2, item 7C, subparagraph (b)(vi) | 46 100 | 47 100 |
126 | Schedule 9, Part 2, item 7C, subparagraph (b)(vii) | 69 000 | 70 600 |
127 | Schedule 9, Part 2, item 7D, paragraph (a) | 9 870 | 10 100 |
128 | Schedule 9, Part 2, item 7D, subparagraph (b)(i) | 9 870 | 10 100 |
129 | Schedule 9, Part 2, item 7D, subparagraph (b)(ii) | 12 700 | 13 000 |
130 | Schedule 9, Part 2, item 7D, subparagraph (b)(iii) | 17 400 | 17 800 |
131 | Schedule 9, Part 2, item 7D, subparagraph (b)(iv) | 23 000 | 23 500 |
132 | Schedule 9, Part 2, item 7D, subparagraph (b)(v) | 34 500 | 35 300 |
133 | Schedule 9, Part 2, item 7D, subparagraph (b)(vi) | 46 100 | 47 100 |
134 | Schedule 9, Part 2, item 7D, subparagraph (b)(vii) | 69 000 | 70 600 |
135 | Schedule 9, Part 2, item 8 | 960 | 980 |
136 | Schedule 9, Part 2, item 9, paragraph (a) | 630 | 645 |
137 | Schedule 9, Part 2, item 9, paragraph (b) | 1 275 | 1 305 |
138 | Schedule 9, Part 2, item 9AA | 630 | 645 |
139 | Schedule 9, Part 2, item 9AB | 850 | 870 |
140 | Schedule 9, Part 2, items 9AC and 9ACA | 630 | 645 |
141 | Schedule 9, Part 2, item 9AD, paragraph (a) | 1 235 | 1 265 |
142 | Schedule 9, Part 2, item 9AD, paragraph (b) | 10 600 | 10 800 |
143 | Schedule 9, Part 2, item 9AD, paragraph (c) | 23 700 | 24 200 |
144 | Schedule 9, Part 2, item 9AD, paragraph (d) | 31 900 | 32 600 |
145 | Schedule 9, Part 2, item 9AD, paragraph (e) | 49 700 | 50 800 |
146 | Schedule 9, Part 2, item 9AD, paragraph (f) | 66 200 | 67 700 |
147 | Schedule 9, Part 2, item 9AD, paragraph (g) | 80 700 | 82 500 |
148 | Schedule 9, Part 2, items 9B and 9C | 17 200 | 17 600 |
149 | Schedule 9, Part 2, item 10 | 160 | 165 |
150 | Schedule 9, Part 2, items 14 and 14A, paragraphs (a) and (b) | 335 | 345 |
151 | Schedule 9, Part 2, item 17, subparagraph (a)(i) | 230 | 235 |
152 | Schedule 9, Part 2, item 17, subparagraph (a)(ii) | 280 | 285 |
153 | Schedule 9, Part 2, item 17, subparagraph (a)(iii) | 440 | 450 |
154 | Schedule 9, Part 2, item 17, subparagraph (a)(iv) | 115 | 120 |
155 | Schedule 9, Part 2, item 17, paragraph (b) | 200 | 205 |
156 | Schedule 9, Part 2, item 17, paragraph (c) | 115 | 120 |
157 | Schedule 9, Part 2, item 17A, subparagraph (a)(i) | 1 130 | 1 155 |
158 | Schedule 9, Part 2, item 17A, subparagraph (a)(ii) | 595 | 610 |
159 | Schedule 9, Part 2, item 17A, sub‑subparagraph (a)(iii)(A) | 850 | 870 |
160 | Schedule 9, Part 2, item 17A, sub‑subparagraph (a)(iii)(B) | 240 | 245 |
161 | Schedule 9, Part 2, item 17A, subparagraph (a)(iv) | 410 | 420 |
162 | Schedule 9, Part 2, item 17A, subparagraph (a)(v) | 290 | 295 |
163 | Schedule 9, Part 2, item 17A, sub‑subparagraph (a)(vi)(A) | 230 | 235 |
164 | Schedule 9, Part 2, item 17A, sub‑subparagraph (a)(vi)(B) | 280 | 285 |
165 | Schedule 9, Part 2, item 17A, sub‑subparagraph (a)(vi)(C) | 440 | 450 |
166 | Schedule 9, Part 2, item 17A, paragraph (b) | 200 | 205 |
167 | Schedule 9, Part 2, item 18 | 2 085 | 2 130 |
168 | Schedule 9, Part 3, item 1, paragraphs (a) and (b) | 1 530 | 1 565 |
169 | Schedule 9, Part 3, item 1, paragraph (c) | 2 450 | 2 505 |
170 | Schedule 9, Part 3, item 1, paragraph (d) | 3 575 | 3 655 |
171 | Schedule 9, Part 3, item 1, paragraph (e) | 5 310 | 5 430 |
172 | Schedule 9, Part 3, item 1, paragraphs (f) to (h) | 1 530 | 1 565 |
173 | Schedule 9, Part 3, item 1, paragraph (i) | 2 450 | 2 505 |
174 | Schedule 9, Part 3, item 2, paragraph (a) | 3 780 | 3 865 |
175 | Schedule 9, Part 3, item 2, paragraph (b) | 5 360 | 5 480 |
176 | Schedule 9, Part 3, item 2, paragraph (c) | 8 270 | 8 455 |
177 | Schedule 9, Part 3, item 2, paragraph (d) | 13 700 | 14 000 |
178 | Schedule 9, Part 3, item 2, paragraph (e) | 20 300 | 20 800 |
179 | Schedule 9, Part 3, item 2, paragraph (f) | 3 780 | 3 865 |
180 | Schedule 9, Part 3, item 2, paragraph (g) | 6 330 | 6 470 |
181 | Schedule 9, Part 3, item 2, paragraph (h) | 8 270 | 8 455 |
182 | Schedule 9, Part 3, item 3, paragraphs (d) and (e) | 765 | 780 |
183 | Schedule 9, Part 3, item 3, paragraphs (f) to (h) | 1 225 | 1 255 |
184 | Schedule 9, Part 3, item 4, paragraphs (d) to (f) | 4 185 | 4 280 |
185 | Schedule 9, Part 3, item 5 | 1 530 | 1 565 |
186 | Schedule 9, Part 3, item 6, paragraph (a) | 5 310 | 5 430 |
187 | Schedule 9, Part 3, item 6, paragraph (b) | 7 860 | 8 035 |
188 | Schedule 9, Part 3, item 6, paragraph (c) | 10 720 | 11 000 |
189 | Schedule 9A, Part 2, items 1, 2 and 3 | 1 025 | 1 050 |
190 | Schedule 9A, Part 2, item 4 | 68 200 | 69 700 |
191 | Schedule 9A, Part 2, item 5 | 136 300 | 139 400 |
192 | Schedule 9A, Part 2, item 6 | 221 600 | 226 600 |
193 | Schedule 9A, Part 2, item 7 | 22 100 | 22 600 |
194 | Schedule 9A, Part 2, item 8 | 1 025 | 1 050 |
195 | Schedule 9A, Part 2, item 9 | 6 255 | 6 395 |
196 | Schedule 9A, Part 2, item 10 | 16 400 | 16 800 |
197 | Schedule 9A, Part 2, item 11 | 32 400 | 33 100 |
198 | Schedule 9A, Part 2, item 12 | 20 300 | 20 800 |
199 | Schedule 9A, Part 2, item 13 | 15 400 | 15 700 |
200 | Schedule 9A, Part 2, item 14 | 630 | 645 |
201 | Schedule 9A, Part 2, item 16 | 24 600 | 25 200 |
202 | Schedule 9A, Part 2, item 17, paragraphs (a) and (b) | 320 | 345 |
0
0
0